Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1643     Entry time: Tuesday, October 17, 2017, 10:56
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: UC#21 
Subject: Module move 

 TM#4 with UC#21 has been moved from the east target station to the south hot cell.

ELOG V2.9.2-2455