ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  1605   Monday, August 28, 2017, 14:40 Travis CaveSouth Hot-CellStandard OperationTM4UC#21Electrical CheckThe results of the electrical check of
TM#4 with UC#21 attached.
 TM4_UC21_elecchk_SHC.PDF 
  1617   Tuesday, September 19, 2017, 10:40 chad fisherSouth Hot-CellMaintenance  South East Manipulator MaintenenceEntered hot cell to preform replacement
of slave tong cable. Existing cable shows
no signs of wear so it has been re-installed.
  
  1618   Tuesday, September 19, 2017, 13:53 Travis CaveSouth Hot-CellStandard OperationTM2Ta#53Module move TM#2 with Ta#53 has been moved from
the west target station to the south hot
cell.
  
  1619   Wednesday, September 20, 2017, 13:38 chad fisherSouth Hot-CellRepairTM2 TM2 Insulator replacementBroken insulators ITD0053 and ITD0054 have
been uninstalled from TM2.
 20170920_132813.jpg20170920_132820.jpg20170920_133244.jpg 
  1620   Thursday, September 21, 2017, 10:48 Travis CaveSouth Hot-CellStandard OperationTM2Ta#53Electrical CheckElectrical checks of TM#2 with Ta#53 and
also with out a target.
 TM2_Ta53_elec_chk_shc.PDFTM2_Ta53_elec_chk_post_beam_shc.PDFTM2_notgt_elec_chk_shc_09202017.PDF 
  1621   Thursday, September 21, 2017, 12:07 chad fisherSouth Hot-CellRepairTM2 Insulator ReplacementInsulators ITD0053 and 54 have been replaced.
All fasteners torqued to 56 in lbs.
 
  
  1622   Thursday, September 21, 2017, 16:26 Anders MjosSouth Hot-CellStandard OperationTM2 Inspection of Source TrayChad and Anders inspected the Source Tray
today using the camera in the hot cell. A
dark spot was observed on one of the four
 TM2_Source_Tray_EE_Insulator.pdf 
  1623   Friday, September 22, 2017, 11:00 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical CheckElectrical check of TM#2 after the insulator
change on thursday september 21.
 TM2_notgt_elec_chk_shc_09212017.PDF 
  1624   Friday, September 22, 2017, 12:13 David WangSouth Hot-CellMaintenanceTM2 TM2 service cap inside inspection.Two side panels on TM2 service cap were
removed for TM2 service cap inside inspection.
A piece of cable tie was found inside cap
 TM2_serica_cap_inspection_002.JPGTM2_serica_cap_inspection_003.JPGTM2_serica_cap_inspection_004.JPGTM2_serica_cap_inspection_005.JPGTM2_serica_cap_inspection_008.JPG 
  1625   Friday, September 22, 2017, 14:15 chad fisherSouth Hot-CellRepairTM2 TM2 containment box offTM2 containment box has been removed. Found
a piece of capton tape or tubing under table
(see picture).
 20170922_140546.jpg20170922_140927.jpg 
  1626   Tuesday, September 26, 2017, 14:27 Travis CaveSouth Hot-CellStandard OperationTM2Ta#54Electrical CheckElectrical check of TM#2 with Ta#54 at
the south hot cell. See attached PDF for
details.
 TM2_Ta54_elec_chk_SHC.PDF 
  1627   Wednesday, September 27, 2017, 08:00 chad fisherSouth Hot-CellStandard OperationTM2Ta#54Ta#54 installedContainment box has been replaced onto
TM2, interior of containment box vacuumed,
and Ta#54 installed with new fasteners (high
  
  1643   Tuesday, October 17, 2017, 10:56 Travis CaveSouth Hot-CellStandard OperationTM4UC#21Module move TM#4 with UC#21 has been moved from
the east target station to the south hot
cell.
  
  1644   Wednesday, October 18, 2017, 10:45 Travis CaveSouth Hot-CellStandard OperationTM4SiC#37Electrical Check The results of the electrical check
of TM#4 with SiC#37, see attached PDF.
 TM4_SIC37_elec_chk_SHC.pdf 
  1654   Tuesday, November 07, 2017, 10:11 Travis CaveSouth Hot-CellStandard OperationTM2Ta#54Module move TM#2 with Ta#54 has been moved from
the west target station to the south hot
cell.
  
  1659   Monday, November 13, 2017, 13:39 Travis CaveSouth Hot-CellStandard OperationTM2Ta#54 and #55Electrical Check The results of the various electrical
check done on the target module on November
7th and 8th of 2017. Checks were done with
 TM2-Ta54-_Electrical_Check_SHC_Post_Beam.pdfTM2-no_target-_Electrical_Check_SHC_Nov_2017.pdfTM2-Ta55_Electrical_Check_SHC.pdf 
  1698   Monday, April 09, 2018, 09:57 Travis CaveSouth Hot-CellStandard OperationTM2Ta#55Module move TM#2 with Ta#55 has been moved from
the west target station to the south hot
cell.
  
  1699   Tuesday, April 10, 2018, 10:43 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move TM#2 has been moved from the south
hot cell to the south west silo.
  
  1707   Tuesday, May 01, 2018, 13:40 Travis CaveSouth Hot-CellStandard OperationTM4SiC#37Electrical Check Electrical check of TM#4 with SiC#37
attached post beam. A short was found between
the Einzel Lens and Chassis. See attached
 TM4_electrical_check_SiC37_post_beam.pdf 
  1708   Thursday, May 03, 2018, 08:24 Travis CaveSouth Hot-CellStandard OperationTM4no targetElectrical Check The results of yesterdays electrical
check of TM#4 with no target attached. See
the attached PDF for details.
 TM4_Electrical_Check_notarget_May_2_2018.pdf 