RH-ISAC, Page 40 of 135
Not logged in
Back
|
Find
|
Select
|
Help
|
Login
Full
|
Summary
| Threaded | Collapse |
Expand
2694 Entries
Goto page
Previous
1
,
2
,
3
...
39
, 40,
41
...
133
,
134
,
135
Next
Friday, August 16, 2019, 08:51, David Wang, Conditioning Station, Repair, TM4, , TM4 waterlines helium pressure test at TCS.
Friday, August 16, 2019, 08:46, David Wang, ITE, Standard Operation, TM4, ZrC #8., TM2 has been connected in ITE.
Thursday, August 15, 2019, 09:45, Travis Cave, South Hot-Cell, Standard Operation, TM2, ZrC#8, Electrical Check
Thursday, August 15, 2019, 09:36, Adam Newsome, ITE, Standard Operation, TM2, ZrC #8, TM2 Move
Wednesday, August 14, 2019, 11:43, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#58 and no target., Results of electrical checks post beam at the south hot cell.
Wednesday, August 14, 2019, 08:55, David Wang, ITE, Standard Operation, TM2, , TM2 has been disconnected in ITE.
Tuesday, August 13, 2019, 09:49, Adam Newsome, South Hot-Cell, Standard Operation, TM2, Ta 58, TM2 Move
Thursday, August 08, 2019, 09:33, Carla Babcock, ITE, Development, TM2, Ta#58, TM2 HV conditioning with protons, round 1
Tuesday, August 06, 2019, 01:13, Carla Babcock, Conditioning Station, Repair, TM4, Dummy HP SIS target, Checks on EE line leak fix and window line leak (not fixed)
Wednesday, July 31, 2019, 08:57, Adam Newsome, South Hot-Cell, Standard Operation, TM4, No Target, TM4 Move
Monday, July 29, 2019, 16:17, Carla Babcock, Conditioning Station, Repair, TM4, Dummy LP SIS, New leak on EE water line while testing new In seals
Friday, July 26, 2019, 15:43, Isaac Earle, Safe Module Parking, Development, , , SMP vacuum control system completed
Friday, July 26, 2019, 11:41, David Wang, South Hot-Cell, Standard Operation, TM4, , TM4 with spare target electrical check and leak check.
Friday, July 26, 2019, 11:28, David Wang, South Hot-Cell, Standard Operation, TM4, , TM4 move from SHC to TCS.
Monday, July 22, 2019, 14:51, Adam Newsome, South Hot-Cell, Standard Operation, TM4, No Target, TM4 Move
Tuesday, July 16, 2019, 08:44, Travis Cave, Conditioning Station, Standard Operation, TM4, no target, Module move
Monday, July 15, 2019, 13:29, David Wang, Conditioning Station, Development, TM4, , Vacuum surge when TM4 B line iwas supplied with water.
Wednesday, July 10, 2019, 11:59, Carla Babcock, Conditioning Station, Repair, TM4, Dummy HP SIS target, Conditioning TM4 w/ new ST up to 50kV
Tuesday, July 09, 2019, 09:15, Carla Babcock, Conditioning Station, Repair, TM4, Dummy HP SIS target, Conditioning TM4 w/ new ST up to 45kV
Monday, July 08, 2019, 14:56, Carla Babcock, Conditioning Station, Repair, TM4, Dummy HP SIS target, First TM4 conditioning with new source tray