2713
|
Wednesday, November 06, 2024, 16:33 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCX46 | TM4 with UCx46 electrical and leak check at SHC | TM4 with UCx46 electrical and leak check
at SHC is done. Everything is good. |
|
|
2712
|
Wednesday, November 06, 2024, 08:29 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#9 | Target and Parasitic assemblies removal from TiC#9 | November 5, 2024 - Aaron Tam
TiC#9 HP-SIS removed from TM4
Top left fixing bolt shows |
17x |
|
2711
|
Tuesday, November 05, 2024, 11:04 |
Frank Song | South Hot-Cell | Standard Operation | | TiC#9 | electrical check with the spent target | David made electrical check right
after TM4 is moved from ITW to SHC. see attachment
pls. |
|
|
2710
|
Tuesday, November 05, 2024, 09:49 |
Frank Song | ITW | Standard Operation | TM4 | TiC#9 | module disconnection | TM4 with spent target TiC#9 was disconnected
in 29-10-2024 and it is being moved from
ITW to SHC. |
|
|
2709
|
Thursday, October 24, 2024, 10:42 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#44 | Target repacked moved to the mini vault. | On October 22 2024 the spent SIC#44
returned from CNL was repacked in a new pail
it was in pail 275 and repacked into pail |
|
|
2708
|
Thursday, October 24, 2024, 10:37 |
David Wang | Conditioning Station | Standard Operation | | | TCS water system functionnal test. | TCS water system has been started for functional
test. System parameters including pressure,
all temperature sensors, flow rate sensors, |
|
|
2707
|
Tuesday, October 15, 2024, 13:44 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#8 and Ta#67 | Spent Target Move | On Friday October 11th TiC#8 and
Ta#67 were place in the spent target vault
in Tray 8. See attached PDF for details. |
|
|
2706
|
Tuesday, October 15, 2024, 12:57 |
Frank Song | ITW/ITE | Standard Operation | | | shielding blocks transfer | 5 shielding blocks are transferred
from ITW to ITE, Target Area is secured again
after moving. |
|
|
2705
|
Friday, October 11, 2024, 15:59 |
Aaron Tam | Facilities | Repair | | | ISAC B2 North Hot Cell Phone Fixed | Resolution comment / Commentaire
de résolution:
|
|
|
2704
|
Thursday, October 10, 2024, 12:20 |
Adam Newsome | Facilities | Standard Operation | | | Safety Walkaround complete - ISAC Hot Cells, Target Hall | A safety walkaround was completed for the
ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be |
|
|
2703
|
Thursday, October 10, 2024, 10:54 |
Aaron Tam | South Hot-Cell | Standard Operation | | TiC#9 | TiC#9 PIE | Post Irradiation Examination
|
32x |
|
2702
|
Thursday, October 10, 2024, 10:24 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 | Ta#67 PIE | Post Irradiation Examination
October 9, 2024 - Aaron Tam w/
Chad Fisher, Aurelia Laxdal, and Lucas Backes |
35x |
|
2701
|
Wednesday, October 09, 2024, 14:04 |
Frank Song | ITE | Standard Operation | TM2 | Ta#68 | Module Connection | TM2 with new target Ta#68 installed
is connected in ITE. Pls see form attached. |
|
|
2700
|
Tuesday, October 08, 2024, 11:46 |
David Wang | ITE | Standard Operation | TM2 | Ta#68. | Tm2 has been moved form SHC to ITE. | Tm2 has been moved form SHC to ITE. The
move is smooth. |
|
|
2699
|
Tuesday, October 08, 2024, 11:45 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | Tm2 electrical check with Ta#68 installed at SHC. | ABCD was dead shorted to 60kv bias during
the first time measurement after target installation.
Target was removed and reinstalled again |
|
|
2698
|
Tuesday, October 08, 2024, 11:20 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#68 | Ta#68 install onto TM2, w/ Troubleshooting | October 7, 2024 - Aaron Tam
Ta#68 HP-SIS checks performed at
B1 lab, moved to anteroom, and inserted into |
17x |
|
2697
|
Tuesday, October 01, 2024, 12:40 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 | Target Ta#67 Removed from TM2 | October 1, 2024 - Aaron Tam
Ta#67 LP-SIS removed from TM2
Ta#67 is sitting in SHC awaiting |
9x |
|
2696
|
Tuesday, October 01, 2024, 10:55 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | TM2 has been moved from ITE to SHC. | TM2 has been moved from ITE to SHC. Peter
did the move with Travis on help. The
move is smooth. |
|
|
2695
|
Tuesday, October 01, 2024, 09:16 |
Frank Song | ITE | Standard Operation | TM2 | Ta#67 | module disconnection | TM2 with spent target Ta#67 was disconnected
in ITE. see attachment pls. |
|
|
2694
|
Friday, September 27, 2024, 07:29 |
David Wang | Conditioning Station | Repair | | | TCS water system resistivity analyzer has been repaired. | TCS water system resistivity analyzer has
been repaired. Two diodes and one capacitor
on PS board were broken. They were replaced. |
|