Monday, June 01, 2020, 12:40, David Wang, Crane, Maintenance, , , TH crane festoon cable maintenance
Friday, May 22, 2020, 13:26, David Wang, ITW, Repair, , , ITW water leak.
Wednesday, May 20, 2020, 13:30, David Wang, Safe Module Parking, Maintenance, , , Silo area radio active waste clean up.
Wednesday, May 20, 2020, 13:19, David Wang, ITE, Maintenance, , , Restart of ITE turbo pumps.
Wednesday, May 20, 2020, 13:08, David Wang, Cooling, Standard Operation, , , Start of HALCW sysytem
Friday, March 27, 2020, 08:45, Matthew Gareau, North Hot-Cell, Maintenance, , , Issues with the manipulators
Thursday, March 19, 2020, 15:48, Anders Mjos, Conditioning Station, Maintenance, , , Filter replacement in water system March 5th
Wednesday, March 18, 2020, 10:40, David Wang, ITE, Development, TM4, , TM4 P2N target connection checklist.
Tuesday, March 17, 2020, 14:59, David Wang, ITE, Development, TM4, P2N, ITE turbopumps are started.
Tuesday, March 17, 2020, 12:58, David Wang, South Hot-Cell, Development, TM4, , P2N target electrical check and leak check at SHC.
Tuesday, March 17, 2020, 11:42, Travis Cave, ITE, Standard Operation, TM4, P to N target, Module move
Monday, March 16, 2020, 09:25, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Module move
Friday, March 13, 2020, 09:24, Travis Cave, ITE, Standard Operation, , , Entrance module move
Thursday, March 12, 2020, 13:48, David Wang, ITE, Repair, , , Entrance module TP1S broken piesces clean up.
Thursday, March 12, 2020, 13:42, David Wang, ITE/ITW, Development, , , New ITE IGLIS cables installation
Wednesday, March 11, 2020, 10:39, Travis Cave, ITE, Maintenance, , , Entrance module move
Monday, March 09, 2020, 14:31, David Wang, ITE/ITW, Standard Operation, , , TH emergency exit test.
Friday, March 06, 2020, 09:51, David Wang, South Hot-Cell, Standard Operation, TM2, , TM2 was moved from SHC to SMP yesterday.
Friday, March 06, 2020, 09:35, David Wang, Spent Target Vault, Standard Operation, , SiC #39, Spent target SiC#39 removal from SHC to storage vault.
Thursday, March 05, 2020, 07:16, David Wang, South Hot-Cell, Standard Operation, TM2, SiC #39, TM2 SiC #39 post run electrical checklist