Entry  Tuesday, November 12, 2019, 10:02, Adam Newsome, ITE, Standard Operation, TM2, SiC#38, TM2 Move 
TM2 was moved from the Conditioning Station to ITE, with SiC#38 target. 
Entry  Thursday, November 07, 2019, 08:56, David Wang, Conditioning Station, Standard Operation, TM2, SiC#38, TM2 in TCS. 
Helium pressure leak check on TM2 HS line at TCS is done. No leak. Also, Helium are sprayed to gas line adapter and fittings. No leak. TM2 is connected
at TCS. Anode plug on TCS is connected to module 52pin connector. Water system is started. Vacuum pumping down is good. HV cover will be installed today.
    Reply  Thursday, November 07, 2019, 10:39, Anders Mjos, Conditioning Station, Standard Operation, TM2, SiC#38, Conditioing SiC#38 SiC#38_ANODE_bias_2019-11-07.PNG
Thursday, November 07, 2019, 10:35: Tested source to 30 A on TGHT, TBHT and COIL. ANODE at 100 V.

Tuesday, November 12, 2019 
The FEBIAD source worked well over the weekend. The anode current limit was adjusted twice to stop voltage limiting. About 5E-8 A on the FC with
Entry  Tuesday, November 05, 2019, 14:27, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#59, Electrical Check Elec_Chk_TM2_with_Ta59_post_beam_SHC_Nov_05_2019.pdfElec_Chk_TM2_SHC_no_target_Nov_5_2019.pdf
 Results of the electrical check of TM#2 with the old Ta#59 target and target free.
Entry  Tuesday, November 05, 2019, 12:46, chad fisher, South Hot-Cell, Standard Operation, TM2, ta#59, Ta#59 removed 
Ta#59 has been removed from TM2 and it is now ready for electrical check.
Entry  Tuesday, November 05, 2019, 11:57, David Wang, ITE, Standard Operation, TM2, Ta 59, Ta#59 disconnection checklist Ta#59_disconnection_checklist.pdf
See attachment
Entry  Tuesday, November 05, 2019, 10:19, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#59, Module move 
 TM#2 with Ta#59 has been moved from the ITE to the south hot cell.
Entry  Thursday, October 31, 2019, 10:17, David Wang, Assembly/Bench Test, Maintenance, TM2, , Febiad target gas line leak check. 
Feibiad gas line for ITE and its adapter fittings for TM2 are tested today by installing them on a dummy water stem. No leak on VCO fitting, adapter
o-rings, and all Swagelock fittings of this assembly. Manual valve on gas line works fine.  The positional check on gas line between TM2 and ITW will
be fulfilled next Tuesday during module disconnection.  
Entry  Thursday, October 31, 2019, 08:49, Anders Mjos, Conditioning Station, Repair, , , Water leak on non-active cooling water circuit 
Yesterday a leak was discovered in the ISAC-I experimental hall. The leak appears to be at the connection between the evaporator and the return water
line. 1 in of water was lost from TCS:TK1. The water is currently valved off to prevent further leakage.
A fault reportt has been submitted to mechanical
Entry  Wednesday, October 30, 2019, 11:18, David Wang, ITW, Standard Operation, TM4, UCx 29, UCx 29 connection checklist UCx_29_connection_checklist.pdf
See attachment
Entry  Tuesday, October 29, 2019, 10:00, Adam Newsome, Safe Module Parking, Development, , , SMP Updates to E-stop circuit and feedback signals 
The SMP main control panel and remote control module were updated in  order to implement the following items which were deemed desirable  during commissioning:
 

        24 VDC line added to E-stop circuit:
Entry  Monday, October 28, 2019, 12:00, Isaac Earle, Safe Module Parking, Development, , , SMP shielding attenuation measured & compared to theoretical values 
The attenuation of the SMP shielding was measured as part of SMP commissioning (Document-170404, R1, Section 4, Test #8)
The field on the shutter side of TM3 was measured without any shielding as it was removed from a storage silo.  At 0.5m from the edge of the
module the maximum field was 5.00mSv.  After installation into the SMP the maximum field outside the SMP shielding at 0.5m from the edge of the module
Entry  Monday, October 28, 2019, 11:50, Travis Cave, Spent Target Vault, Standard Operation, , UC#28, Spent Target Move Target_Index_2019-10-28.pdf
 UC#28 has been moved from the south hot cell to spent target storage. The target was placed in pail number 219 and placed in spot 1C of the vault,
it was 12.6mSv/hr upon removal from the south hot cell. Also the spent target vault is now full and can not currently accept anymore targets.
Entry  Friday, October 25, 2019, 06:43, David Wang, Safe Module Parking, Development, TM3, , SMP vacuum 
TM3 was moved into SMP Oct 25 morning.  After two nights pumping down, SMP CG1 read 30mtorr this morning.  The pump is stopped. SMP will be
vented soon for TM3 moving back to silo.  
Entry  Thursday, October 24, 2019, 14:11, Travis Cave, ITW, Standard Operation, TM4, UC#29, Module move 
 TM#4 with UC29 has been moved from the south hot cell to the west target station.
Entry  Wednesday, October 23, 2019, 07:58, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#28, UCx#28 Removed 
UCx#28 has been removed from TM4. Guard screws on 5(10) pin connector had to be removed to get the connector to un-seat properly for removal.
Entry  Wednesday, October 23, 2019, 06:56, David Wang, ITW, Standard Operation, TM4, UCX 28, TM4 UCx 28 disconnection checklist UCx_28_disonnection_CL.pdf
TM4 was disconnected in ITW.  See checklist.
Entry  Tuesday, October 22, 2019, 16:26, Isaac Earle, Safe Module Parking, Development, , , SMP shield box grounding 
A braided grounding strap was attached to the aluminum gear box support on the SMP shield box structure, and grounded by attaching it to the exterior
of an electrical conduit located in the south-west corner of the B2 area at the top of the silo in that corner.  The braiding was also connected to
the stainless steel support structure for the SMP vacuum pump.
Entry  Tuesday, October 22, 2019, 11:19, Adam Newsome, South Hot-Cell, Standard Operation, TM4, UC# 28, TM4 Move 
TM4 with UC# 28 target has been moved from ITW to the South Hot Cell. Shield plug installed in ITW.
Entry  Thursday, October 17, 2019, 11:49, Travis Cave, Spent Target Vault, Standard Operation, , SiC#31,32 and UC#19,20,21, Loading F-308 
 The targets in the mini storage have been loaded into the F-308.
Entry  Tuesday, October 15, 2019, 16:42, Isaac Earle, Safe Module Parking, Development, , , SMP flange alignment tested using shield plug smp1.jpgsmp2.jpgsmp3.jpgsmp4.jpg
 As a preliminary test in preparation for SMP commissioning, one of the steel module shield plugs was installed into the SMP to check the positional
and rotational alignment procedures.  The following is a summary of the steps performed:

    Shield plug lifted with crane and rotated to an arbitrary (non-orthogonal) position
    Using the crane pendant the shield