2499
|
Tuesday, November 07, 2023, 13:55 |
Frank Song | ITE | Standard Operation | TM4 | Ta#65 | module disconnection | TM4 with spent target Ta#65 was disconnected
in ITE and moved to SHC. |
|
|
2500
|
Wednesday, November 08, 2023, 12:14 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | UCx#43 | electrical check/leak check | TM4 with new target UCx#43 was electrical
and leak checked on SHC. |
|
|
2519
|
Wednesday, January 10, 2024, 16:51 |
Carla Babcock | ITE | Standard Operation | TM4 | UCx#43 | UCx#43 failure | To deliver stable beam to RadMol,
started heating UCx#43 up again. Target was
overheated during initial conditioning in |
|
|
2527
|
Monday, January 22, 2024, 10:16 |
David Wang | ITE | Standard Operation | TM4 | UCx# | Tm4 waterlines helium pressure test and TM service cap helium leak check. | Tm4 waterlines helium pressure test and
TM service cap helium leak check was done
last Friday. All water lines were pressurized |
|
|
2528
|
Monday, January 22, 2024, 14:12 |
Frank Song | ITE | Standard Operation | TM4 | UCx#43 | module disconnection | TM4 with spent target UCx#43 was
disconnected in ITE and is ready moved to
SHC. see attachment pls. |
|
|
2529
|
Wednesday, January 24, 2024, 08:34 |
chad fisher | South Hot-Cell | Repair | TM4 | UCx#43 | Plating and coating from UCx#43 failure | TM4 has seen significant coating of the
main standoff insulators and various other
components stemming from failure in UCx#43 |
|
|
2533
|
Friday, January 26, 2024, 08:30 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | window line VCR leak check after containment box removal/installation. | Chad and I did window line VCRs leak check
after containment box removal/installation.
The first pair of VCRs have leak. |
|
|
2534
|
Friday, January 26, 2024, 11:53 |
David Wang | Safe Module Parking | Standard Operation | TM4 | | Tm4 has been moved to SMP. | TM4 has been moved to SMP. The move is
smooth. I started SMP vacuum pump. The TM4
and SMP vessel is under vacuum now. |
|
|
2535
|
Friday, January 26, 2024, 11:57 |
David Wang | Safe Module Parking | Standard Operation | TM4 | | TM4 coil1, 2, and HS electrical check at SMP after module moving. | TM4 coil1, 2 and HS are all OL at 250V
at SMP after module move. This week, Chad
and Carl fixed short issue on coil1, 2 and |
|
|
2536
|
Friday, January 26, 2024, 16:48 |
Carla Babcock | South Hot-Cell | Standard Operation | TM4 | UC43 | UCx#43 PIE | UCx#43 PIE was done in the SHC. As expected
based on electrical measurements, the target
container was broken on the right side and |
|
|
2537
|
Friday, February 02, 2024, 07:48 |
David Wang | ITE | Standard Operation | TM4 | | ITE primary and secondary vacuum vessel leak check. | ITE primary and secondary vacuum vessel
leak check has been done. SST bellow for
2A3M19 wire scanner on entrance module |
|
|
2570
|
Friday, April 26, 2024, 13:22 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | TM4 has been moved from SMP to SHC. | TM4 has been moved from SMP to SHC. Adam
and I did the move. the move is smooth. |
|
|
2572
|
Monday, April 29, 2024, 14:21 |
David Wang | ITE/ITW | Standard Operation | TM4 | | TM4 has been moved from SHC to ITW. | TM4 has been moved from SHC to ITW. Peter
did the move. Travis helped on him.
The move is successful. |
|
|
2573
|
Tuesday, April 30, 2024, 08:00 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Lp-Febiad empty | electrical check/leak check | David Wang made E/L checking before
module moving to ITW. read attachment pls. |
|
|
2574
|
Tuesday, April 30, 2024, 09:20 |
David Wang | ITW | Development | TM4 | | A new SST gas line is using for ITW febiad gas staion in pit. | A new SST gas line with swagelock tube
fittings and VCR fit is using for ITW febiad
gas staion in pit. Gas line is leak checked |
|
|
2575
|
Wednesday, May 01, 2024, 09:50 |
David Wang | ITW | Standard Operation | TM4 | | TM4 has been connected to ITW. | TM4 has been connected to ITW. see attachment. |
|
|
2577
|
Thursday, May 02, 2024, 09:00 |
David Wang | ITW | Standard Operation | TM4 | | Annual ITW water signal interlock check has been done. | Annual ITW water signal interlock check
has been done. Renee helped me on it. Everything
works fine. |
|
|
2590
|
Monday, May 13, 2024, 09:28 |
David Wang | ITE | Standard Operation | TM4 | UCx#44 | ITE water signal annual interlock check. | ITE water signal annual interlock check
is done. Ed helped me on this check. Everything
works normal. |
|
|
2593
|
Tuesday, May 21, 2024, 09:50 |
David Wang | ITW | Standard Operation | TM4 | Lp Febiad empty | Tm4 has been disconnected in ITW. | Tm4 has been disconnected in ITW per document
141576. Checklist is done. HS line
is purged. |
|
|
2594
|
Tuesday, May 21, 2024, 11:46 |
David Wang | ITW | Standard Operation | TM4 | LP febiad empty. | Tm4 has been moved from ITW to SHC. | Tm4 has been moved from ITW to SHC. the
move is smooth. |
|