Entry  Wednesday, May 24, 2023, 17:25, Carla Babcock, ITE, Repair, TM4, TiC#5, Issues with anode short 

When I tried to raise the anode voltage in cathode bias mode on May 23 evening, I found the target or tube shorted to HV common. Investigations in the faraday cage today showed the same. I removed all the new electronics (resistors, gemovs, etc) from the power supply to no effect, so I disconnected the TGHT supply and pushed it away from the busbars. There was still a short. David Frank and I then went down to the pit and disconnected everything to measure the module. The module itself showed no short, and the bus bars in the chase for TGHT showed no short, though the ones for TBHT still showed the short.

David and Frank reconnected the module and I disconnected the TBHT supply in the faraday cage, then I found no shorts to TGHT/TBHT. When I reconnected everything there were still no shorts. There must have been a short in the TBHT line in the faraday cage, and another short in the TGHT line in either the faraday cage or on the module top. Both these shorts got resolved by taking everything apart. Still not sure how it happened.

Next I found I could not raise the anode voltage above 230V, it looked like it was current limiting but since the current limit was high, I figured it had something to do with the new electronics installed. I disconnected them all the in cage and that solved the problem, and then reconnecting the gemovs that go from the PSU terminals to HV common caused the problem again, so I left those disconnected.

Entry  Tuesday, May 30, 2023, 12:23, Frank Song, ITE, Standard Operation, TM4, TiC#5, gas lines pump out in ITE Faraday Cage Argon_supplied_at_6psi_to_TM4_in_ITE.JPG

argon is being supplied at 6 psi to TM4. 

Entry  Tuesday, June 13, 2023, 09:55, Frank Song, ITE, Standard Operation, TM4, TiC#5, module disconnection TM4_with_TiC#5_(FEBIAD)disconnected_in_ITE_20230613.pdf

 TM4 with TiC#5 was disconnected in ITE and moved to NHC.

Entry  Tuesday, June 13, 2023, 11:45, Frank Song, North Hot-Cell, Standard Operation, TM4, TiC#5, electrical check TM4_with_spent_target_electric_check_right_after_moving_to_NHC.png

 TM4 with spent target TiC#5 electric check after moving from ITE to NHC.

Entry  Wednesday, June 21, 2023, 09:51, Travis Cave, Spent Target Vault, Standard Operation, , TiC#5, Spent Target Move Target_Index_2023-06-21.pdf

 TiC#5 moved to the spent target vault from the north hot cell. Placed in pail#279 in spot 3A, 40mSv/h when removed from NHC. See attached PDF for further details.

Entry  Wednesday, July 12, 2023, 22:21, Carla Babcock, North Hot-Cell, Standard Operation, , TiC#5, TiC#5 post irradiation inspection results 

The TiC#5 post irradiation inspection was done on Wed. June 14 and Mon. June 19. This target didn't have any obvious issues but it didn't produce much beam. The inspection revealed that the container was quite embrittled and showed significant damage, though it was not broken. The FEBIAD grid looked fine, despite the large anode current draw (indicating that current was flowing elsewhere). The gas line looked fine though the gas injection to this target looked as if it wasn't connected. But there was a plug on the unused line, so it must have been correct. No other obvious signs that would explain the poor performance. Pictures are can be found here https://documents.triumf.ca/docushare/dsweb/View/Collection-37913

Entry  Monday, April 07, 2014, 11:49, Travis Cave, South Hot-Cell, Standard Operation, TM3, TiC#4, Electrical check TM#3_elec_test_TiC#4_surf.PDF

Electrical test of TM#3 with TiC#4 attached. See PDF.

Entry  Monday, April 07, 2014, 14:13, chad fisher, South Hot-Cell, Standard Operation, TM3, TiC#4, TiC#4 installation 

TiC#4 has been installed onto TM3

Entry  Tuesday, April 08, 2014, 09:05, Travis Cave, South Hot-Cell, Standard Operation, TM3, TiC#4, module move 

TM#3 with TiC#4 has been moved from the south hot cell to the conditioning station.

Entry  Thursday, April 10, 2014, 14:03, Bevan Moss, Conditioning Station, Standard Operation, TM3, TiC#4, HV conditioning 10042014_Tm3_TiC#4_HV_conditioning.JPG10042014_TM3_TiC#4_HV_conditioning.txt

 The TiC#4 target that is on TM3 was conditioned to 25kV today with the EINZEL lens at 12.5kV. There was one spark shortly after reaching 25kV that reset the bias PS and another one  after the module sat at 25kV for ~30 minutes. Attached is the strip tool data and screen shot. Prior to starting the conditioning the power on the chiller needed to by cycled as the VFD on the fans had tripped due to a recurring inrush problem.

Entry  Tuesday, April 15, 2014, 08:53, Travis Cave, ITE, Standard Operation, TM3, TiC#4, module move 

TM#3 with TiC#4 has been moved from the conditioning station to the east target station.

Entry  Monday, May 05, 2014, 10:40, Travis Cave, ITE, Standard Operation, TM3, TiC#4, module move 

TM#3 with TiC#4 has been moved from the east station to the south west silo.

Entry  Tuesday, June 24, 2014, 11:12, Travis Cave, South Hot-Cell, Standard Operation, TM3, TiC#4, module move 

TM#4 with TiC#4 has been moved from the east target station to the south hot cell.

Entry  Tuesday, June 24, 2014, 11:58, Travis Cave, South Hot-Cell, Standard Operation, TM3, TiC#4, Electrical check TM3_TiC4_elec_chk_SHC_postbeam.PDF

Electrical check of the TiC#4 on TM#3 post beam at the south hot cell, see attached PDF for details

Entry  Tuesday, June 24, 2014, 15:14, Anders Mjos, South Hot-Cell, Standard Operation, TM3, TiC#4, Conductor insulator broken close to right TGHT terminal TiC#4_Broken_Insulator.pdf

When the Containment Box was opened today by Chad for a target change, we found the conductor insulator block B (ITD0054) to be broken close to the right TGHT terminal. Chad was nevertheless able to remove the target. See DocuShare and attached file for photos.

An attempt to replace the insulator will be made tomorrow with a spare.

A small sticky piece, likely off plastic material, was found next to the left main source tray insulator. The piece was removed from the Containment Box. See link above and attachment for photos.

Entry  Tuesday, June 24, 2014, 15:45, Anders Mjos, South Hot-Cell, Standard Operation, TM3, TiC#4, Ground Electrode and Extraction Electrode dirty after last run TiC#4_Dirty_GND_and_EE_electrodes.pdf

See attached pdf and DocuShare for more photos. It may be possible to clean some of it from the Ground Electrode.

    Reply  Wednesday, June 25, 2014, 12:49, Anders Mjos, South Hot-Cell, Standard Operation, TM3, TiC#4, Conductor insulator broken close to right TGHT terminal ITD0052C_revB.pdf

Anders Mjos wrote:

When the Containment Box was opened today by Chad for a target change, we found the conductor insulator block B (ITD0054) to be broken close to the right TGHT terminal. Chad was nevertheless able to remove the target. See DocuShare and attached file for photos.

An attempt to replace the insulator will be made tomorrow with a spare.

A small sticky piece, likely off plastic material, was found next to the left main source tray insulator. The piece was removed from the Containment Box. See link above and attachment for photos.

 The two insulators ITD0053 and ITD0054 was replaced this morning by Chad. Photos on DocuShare. All bolts torqued with torque wrench see attached PDF for values.

Entry  Wednesday, June 25, 2014, 12:55, Anders Mjos, South Hot-Cell, Standard Operation, TM3, TiC#4, Object - possibly cable tie found in Containment Box TiC#4_Cable_Tie.pdf

 See attached PDF. The object is not accessible with only the front panel removed. Photos on DocuShare.

Entry  Tuesday, November 06, 2012, 14:00, chad fisher, South Hot-Cell, Standard Operation, TM1, TiC#3, TiC#3 Installed 

TiC#3 sucessfully installed and ready for leak and electrical check.

Entry  Wednesday, November 07, 2012, 09:25, Travis Cave, South Hot-Cell, Standard Operation, TM1, TiC#3, Electrical check TM_1_TiC_3_Elec_check_SHC.PDF

TM#1 with TiC#3 target has had the electrical performed on it. See attached PDF for details.