Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 686     Entry time: Tuesday, June 24, 2014, 11:58
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM3 
Target/Number: TiC#4 
Subject: Electrical check 

Electrical check of the TiC#4 on TM#3 post beam at the south hot cell, see attached PDF for details

Attachment 1: TM3_TiC4_elec_chk_SHC_postbeam.PDF  155 kB  | Show | Hide all
ELOG V2.9.2-2455