686
|
Tuesday, June 24, 2014, 11:58 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Electrical check | Electrical check of the TiC#4 on TM#3 post
beam at the south hot cell, see attached
PDF for details |
|
687
|
Tuesday, June 24, 2014, 15:14 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Conductor insulator broken close to right TGHT terminal | When the Containment Box was opened today
by Chad for a target change, we found the
conductor insulator block B (ITD0054) to |
|
688
|
Tuesday, June 24, 2014, 15:45 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Ground Electrode and Extraction Electrode dirty after last run | See attached pdf and DocuShare for
more photos. It may be possible to clean
some of it from the Ground Electrode. |
|
689
|
Wednesday, June 25, 2014, 12:49 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Conductor insulator broken close to right TGHT terminal |
|
|
690
|
Wednesday, June 25, 2014, 12:55 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Object - possibly cable tie found in Containment Box | See attached PDF. The object is not
accessible with only the front panel removed.
Photos on DocuShare. |
|
205
|
Tuesday, November 06, 2012, 14:00 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | TiC#3 | TiC#3 Installed | TiC#3 sucessfully installed and ready for
leak and electrical check. |
|
206
|
Wednesday, November 07, 2012, 09:25 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | TiC#3 | Electrical check | TM#1 with TiC#3 target has had the electrical
performed on it. See attached PDF for details. |
|
207
|
Wednesday, November 07, 2012, 10:25 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | TiC#3 | module move | TM#1 with TiC#3 has been moved from the
south hot cell to the conditioning station,
move went well. |
|
211
|
Friday, November 09, 2012, 09:20 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | TiC#3 | Electrical check | Electrical check performed on TM#1 with
TiC#3 at the conditioning station under vacuum.
See PDF for details. |
|
213
|
Tuesday, November 13, 2012, 10:55 |
Travis Cave | ITW | Standard Operation | TM1 | TiC#3 | module move | TM#1 with TiC #3 moved from the conditioning
station to the west target station,
move went well. |
|
227
|
Tuesday, January 08, 2013, 08:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | TiC#3 | Electrical check | TM#1 with TiC #3 post beam. See attached
PDF for results. |
|
232
|
Tuesday, January 15, 2013, 14:37 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#3 | Spent target move | TiC #3 was moved from the south hot cell
in to the vault storage today, it was placed
in slot 4B and was in pail #104, it had a |
|
2689
|
Monday, September 23, 2024, 11:35 |
David Wang | ITW | Standard Operation | TM4 | TiC #9. | vacuum leak check on TM4 service cap in ITW. | vacuum leak check on TM4 service cap in
ITW was done this morning. leak
detector leak rate 0.0XE-9 atm.cc/sec. No |
|
2640
|
Tuesday, July 16, 2024, 11:15 |
David Wang | ITW | Standard Operation | TM4 | TiC #7 febiad. | TM4 has been moved from TCS to ITW. | TM4 has been moved from TCS to ITW.
the move is smooth. |
|
2641
|
Tuesday, July 16, 2024, 11:15 |
David Wang | ITW | Standard Operation | TM4 | TiC #7 febiad. | TM4 has been moved from TCS to ITW. | TM4 has been moved from TCS to ITW.
the move is smooth. |
|
2661
|
Friday, August 16, 2024, 09:50 |
David Wang | South Hot-Cell | Standard Operation | TM4 | TiC #7 febiad. | TM4 has been moved from SMP to SHC. | TM4 has been moved from SMP to SHC.
The move is smooth.
|
|
209
|
Thursday, November 08, 2012, 08:42 |
David Wang | Conditioning Station | Standard Operation | TM1 | TiC #3 | TM1 TiC #3 target heat shield helium pressure check is done. | TM1 TiC #3 target heat shield
helium pressure check is done at conditioning
station. Applied 80 psi helium to HS circuit |
|
208
|
Wednesday, November 07, 2012, 11:09 |
David Wang | South Hot-Cell | Standard Operation | TM1 | TiC | TM1 heat shield circuit leak check with TiC target at hot cell | Chad and i did a leak check on TM1(Lp-TiC)
heat shield water circuit at south hot cell.
There is no leak had been found on it. The |
|
776
|
Monday, November 03, 2014, 11:16 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | ThO#1 | ThO#1 Installed | ThO#1 has been installed onto TM1 and is
ready for leak and electrical checking. High
current fasteners torqued to 130 in lbs. |
|
777
|
Monday, November 03, 2014, 13:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Electrical check | TM#1 with ThO#1 electrical check see attatched
PDF for details. |
|