Entry  Tuesday, November 07, 2023, 13:55, Frank Song, ITE, Standard Operation, TM4, Ta#65, module disconnection TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf
Entry  Wednesday, November 08, 2023, 12:14, Frank Song, South Hot-Cell, Standard Operation, TM4, UCx#43, electrical check/leak check TM4_electric_and_leak_checked_after_UCx#43_installed_2023-11-08.pdf
Entry  Wednesday, January 10, 2024, 16:51, Carla Babcock, ITE, Standard Operation, TM4, UCx#43, UCx#43 failure 
Entry  Monday, January 22, 2024, 10:16, David Wang, ITE, Standard Operation, TM4, UCx#, Tm4 waterlines helium pressure test and TM service cap helium leak check. 
Entry  Monday, January 22, 2024, 14:12, Frank Song, ITE, Standard Operation, TM4, UCx#43, module disconnection TM4_with_UCx43_disconnected_in_ITE_2024-01-22.pdf
Entry  Wednesday, January 24, 2024, 08:34, chad fisher, South Hot-Cell, Repair, TM4, UCx#43, Plating and coating from UCx#43 failure IMG_2464.jpgIMG_2465.jpgIMG_2470.jpgIMG_2471.jpgIMG_2472.jpg
Entry  Friday, January 26, 2024, 08:30, David Wang, South Hot-Cell, Standard Operation, TM4, , window line VCR leak check after containment box removal/installation.  
Entry  Friday, January 26, 2024, 11:53, David Wang, Safe Module Parking, Standard Operation, TM4, , Tm4 has been moved to SMP. 
Entry  Friday, January 26, 2024, 11:57, David Wang, Safe Module Parking, Standard Operation, TM4, , TM4 coil1, 2, and HS electrical check at SMP after module moving. 
Entry  Friday, January 26, 2024, 16:48, Carla Babcock, South Hot-Cell, Standard Operation, TM4, UC43, UCx#43 PIE 
Entry  Friday, February 02, 2024, 07:48, David Wang, ITE, Standard Operation, TM4, , ITE primary and secondary vacuum vessel leak check.  
Entry  Friday, April 26, 2024, 13:22, David Wang, South Hot-Cell, Standard Operation, TM4, , TM4 has been moved from SMP to SHC. 
Entry  Monday, April 29, 2024, 14:21, David Wang, ITE/ITW, Standard Operation, TM4, , TM4 has been moved from SHC to ITW. 
Entry  Tuesday, April 30, 2024, 08:00, Frank Song, South Hot-Cell, Standard Operation, TM4, Lp-Febiad empty, electrical check/leak check TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf
Entry  Tuesday, April 30, 2024, 09:20, David Wang, ITW, Development, TM4, , A new SST gas line is using for ITW febiad gas staion in pit. 
Entry  Wednesday, May 01, 2024, 09:50, David Wang, ITW, Standard Operation, TM4, , TM4 has been connected to ITW. Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf
Entry  Thursday, May 02, 2024, 09:00, David Wang, ITW, Standard Operation, TM4, , Annual ITW water signal interlock check has been done.  
Entry  Monday, May 13, 2024, 09:28, David Wang, ITE, Standard Operation, TM4, UCx#44, ITE water signal annual interlock check. 
Entry  Tuesday, May 21, 2024, 09:50, David Wang, ITW, Standard Operation, TM4, Lp Febiad empty, Tm4 has been disconnected in ITW. TM4_with_Lp-Febiad_empty_target_disconnection_in_ITW_2024-05-21.pdf
Entry  Tuesday, May 21, 2024, 11:46, David Wang, ITW, Standard Operation, TM4, LP febiad empty. , Tm4 has been moved from ITW to SHC. 