Entry  Monday, December 21, 2020, 11:22, Adam Newsome, Crane, Standard Operation, , , Crane Shutdown for Power Outage 
The Target Hall Crane has been shut down in preparation for the power outage tomorrow (Dec 22). Power will be restored on Dec 23.
 
Dec 23 update: power has been restored. The crane appears to be in working condition as there is no fault indicator on the PLC.
Entry  Thursday, December 10, 2020, 15:07, Adam Newsome, South Hot-Cell, Development, TM3, , TM3 Move 
TM3 was remotely moved from the conditioning station to the South Hot Cell. No containment box.
Entry  Monday, December 07, 2020, 12:20, Adam Newsome, Conditioning Station, Development, TM3, , TM3 Move 
TM3 has been moved from the South Hot Cell to the Conditioning Station. No containment box.
Entry  Wednesday, November 25, 2020, 09:05, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , Module Move 
TM3 has been moved from the Silo to the South Hot Cell.
Entry  Tuesday, November 24, 2020, 12:56, David Wang, ITW, Standard Operation, TM2, Nb#9, TM2 has been connected in ITW TM2_Nb#9_module_connection_checklist.pdf
TM2 has been connected to ITW. Turbo pumps are stared. ITW pumping down is fine so far.
Entry  Tuesday, November 24, 2020, 09:37, Adam Newsome, ITW, Standard Operation, TM2, , Module Move 
TM2 has been moved from the Conditioning Station to ITW. 
Entry  Thursday, November 19, 2020, 12:00, Adam Newsome, Spent Target Vault, Standard Operation, , C#2, Spent Target Move 
C#2 has been moved from the south hot cell to the spent target  vault. It is in spot 8A of the vault in pail # 235 and was 185 mSv/hr  upon removal from
the south hot cell.
The Target Index spreadsheet has been updated on DocuShare.
Entry  Thursday, November 19, 2020, 09:00, David Wang, Conditioning Station, Standard Operation, TM2, Nb#6, Helium pressure check on TM2 HS line at TCS. 
LD 0.0 Xe-9 atm.cc/sec , 70 psi helium 3 minutes.  No leak.
Entry  Wednesday, November 18, 2020, 15:28, David Wang, South Hot-Cell, Standard Operation, TM2, Nb#6, electrical check and HS leak check. Screenshot_2020-11-18_Mail_-_David_Wang_-_Outlook.png
Everything looks good. A still short to P before target installation. We will float P,Q as before on module top. 
Entry  Tuesday, November 17, 2020, 10:17, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , Module Move 
TM2 has been moved from ITW to the South Hot Cell. 

Reading at ITW: 114 mSv/hr
Entry  Thursday, November 12, 2020, 10:02, Travis Cave, Spent Target Vault, Standard Operation, , UC#31, Spent Target Move 
 UC#31 has been moved from the south hot cell to the spent target vault. It is in spot 8B of the vault in pail # 224 and was 3.71mSv/hr upon removal
from the south hot cell.
Entry  Thursday, November 05, 2020, 10:48, Travis Cave, ITE, Standard Operation, TM4, Ta#61, Module move 
 TM#4 with Ta#61 has been moved from the south hot cell to the east target station.
Entry  Thursday, November 05, 2020, 10:23, David Wang, Spent Target Vault, Standard Operation, , , TM2 old source tray and TM4 optic tray in vault tray#9. 
TM2 old source tray and TM4 optic tray are stored together in vault tray#9. The fielding measurement at SHC post 0.5 meter distance:
 
March 1st 2019, maximum 14.6msv/hr, minimum 4.78 msv/hr
Entry  Tuesday, November 03, 2020, 10:52, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#31, Module move 
 TM#4 with UC#31 has been moved from the east target station to the south hot cell.
Entry  Friday, October 30, 2020, 09:02, Travis Cave, Spent Target Vault, Standard Operation, , Ta#48,51,54 SiC#35, and UC#25, Repacking of the targets. Target_Index_2020-10-30.pdf
 Targets Ta#48,51,54 SiC#35, and UC#25 were repacked and placed in the mini vault. In the following order back to front. SiC#35 (240), Ta#54(241),
UC#25(244), Ta#48(243), Ta#51(242).
Also during this repacking Ta#60 was also placed in the Spent Target Vault in spot 7B in pail# 239.
Entry  Tuesday, October 27, 2020, 11:46, Matthew Gareau, North Hot-Cell, Repair, , , Ratcheting repair issues with both left and right master  
  
The were issues with both left and right master
ratcheting;
Entry  Tuesday, October 20, 2020, 10:14, Travis Cave, ITW, Standard Operation, TM2, C#2, Module move 
 TM#2 with C#2 has been moved from the south hot cell to the West Target Station.
Entry  Monday, October 19, 2020, 12:52, David Wang, South Hot-Cell, Standard Operation, TM2, C#2, TM2 electrical and leak check at SHC Tm3_bunker_set_up_018.JPG
TM2 electrical check and leak check are done at SHC with C#2 target installed. The results are good.  
Entry  Friday, October 16, 2020, 10:36, Travis Cave, ITW, Standard Operation, TM2, Ta#60, Module move 
 TM#2 with Ta#60 is now in the south hot cell.
Entry  Thursday, October 15, 2020, 12:48, Travis Cave, ITE, Standard Operation, TM4, UC#31, Module move 
 TM#4 is now back in the east target station.