ID Date Author Category Type Module Target/Number Subject
  2109   Tuesday, June 23, 2020, 10:56 David WangSafe Module ParkingStandard Operation  SMP annual service.

Dan and I did the SMP annual  maintenance service today. Lid open/close , vessel rotation and limit switch check, lubricate chains, tighten fasteners, and visual inspection.  Everything works fine.

  2108   Friday, June 19, 2020, 11:21 David WangITERepairTM4P2N test.ITE TP3 is replaced.

ITE TP3 is replaced. ITE is under vacuum again. All turbo pumps are started successfully. Current draw on pumps are normal so far.

  2107   Thursday, June 18, 2020, 13:25 David WangITEStandard OperationTM4P2N test.Disconnect TM4 in ITE.

TM4 has been disconnected in ITE. Vacuum pumps and gauge are not disconnected yet.

  2106   Thursday, June 18, 2020, 13:22 David WangITWStandard OperationTM2C#1Remove of TM2 from ITE to SHC.

Remotely remove TM2 from ITW to SHC. The move is good.  Shielding plug is put back to ITW.

  2105   Thursday, June 18, 2020, 09:11 Travis CaveITWStandard OperationTM2Graphite #1Module move

 TM#2 with the graphite #1 target has been moved from the south hot cell to the west target station.

  2104   Wednesday, June 17, 2020, 09:53 David WangSouth Hot-CellStandard OperationTM2C#1C#1 target electrical check and leak check at SHC.

Target to HS is 400 ohm. The rest check is good. See attachment.

Attachment 1: C#1_target_electrical_and_leak_check.pdf
C#1_target_electrical_and_leak_check.pdf
  2103   Wednesday, June 17, 2020, 09:49 chad fisherSouth Hot-CellStandard OperationTM4C#1C#1 installed

Target C#1 has been installed on TM4 with new high current fasteners torqued to 130in lbs.

 

 

Attachment 1: C#1_Target.jpg
C#1_Target.jpg
  2102   Tuesday, June 16, 2020, 09:37 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move

 TM#2 with no target has been moved from the south west silo to the south hot cell.

  2101   Thursday, June 11, 2020, 12:36 David WangSafe Module ParkingRepairTM3 TM3 containment box and service tray field measurement.
At 15cm distance: Containment box window 21msv maximum. Service tray 8.0msv maximum.
At 0.5 meter distance 360degree rotation: containment box high 10msv, low 4.3msv.
Maximum 170 to 180 counts(44-2) on swipes taking from service cap inside.
0 to 20 counts(44-2) on air sample at 0.5 meter to containment box window panel.
80 counts(44-2) on air sample taking from service cap inside.  The contamination level in service cap is low.

 

  2100   Thursday, June 11, 2020, 11:49 David WangITEMaintenance  ITW and ITE thermocouple status.

  ITW - 2A2

o    2A2DSP-TC3 - not connected in El room

o    2A2COL-TC2 - does not work inside module

o    2A2COL-TC3 - does not work inside module

·         ITE - 2A3

o    2A3COL-TC3 - works, but plug needs repair in ITE pit

 Anders and I checked ITW and ITE thermocouple status. See result above.  Frank and I will fix the 2A3COL-TC3 loose cable to plug issue.

  2099   Thursday, June 04, 2020, 10:51 David WangConditioning StationStandard Operation  TH floor mop up.

Jason Sargeant mopped up TH floor this morning. The mop head was checked after the job. There are 1500 counts on it. He think this level is reasonable low. 3000 counts would be normal in past.

  2098   Thursday, June 04, 2020, 10:40 David WangConditioning StationMaintenance   Three manual valves are closed on TCS water system

Three manual valves are closed on TCS water system return line in experimental hall. See attachments. It is for TCS TK2 water level slow drop trouble shooting.  These valves will be opened again right after troubleshooting.  

TCS TK2 water level no change(11.1 inches) in this week after valves are closed. I will keep these three valves closed for one more week.

I opened these valves. In two week times, The TK2 level dropped 0.1 inches. The water level change could be a result of evaporation of water in system. We will keep watching on it.

Attachment 1: TCS_return_line_closed_valves_001.JPG
TCS_return_line_closed_valves_001.JPG
Attachment 2: TCS_return_line_closed_valves_002.JPG
TCS_return_line_closed_valves_002.JPG
  2097   Monday, June 01, 2020, 12:46 David WangITEMaintenance  ITH:CM6 ,CM6S and ITM:CM3 calibration.

Edi calibrated ITH:CM6, CM6S and ITM:CM3. By the same time,  ITH:MP1 and MP2  lubricate oil level are checked. Everything looks fine. No oil  leak on both pumps. 

  2096   Monday, June 01, 2020, 12:40 David WangCraneMaintenance  TH crane festoon cable maintenance

Tom Kauss corrected the TH crane  festoon cable loops. He lubricated festoon cable wheels as well.    The maintenance is done.

  2095   Friday, May 22, 2020, 13:26 David WangITWRepair  ITW water leak.

A water leak was found on a fitting connecting ITW dump return line pressure gauge on top of exit module. TM tank flange, o-ring slot and o-ring were contaminated by water and water rust. Frank and I cleaned the flange and o-ring slot . We changed a new TM tank o-ring, vacuumed around other 3 module flanges. The leak fittings with pressure gauges were removed . I put a blind cap on removed fitting spot.. Water are switched back to ITW. No leak on blind cap.

Attachment 1: itw_water_leak_001.JPG
itw_water_leak_001.JPG
Attachment 2: itw_water_leak_005.JPG
itw_water_leak_005.JPG
Attachment 3: itw_water_leak_009.JPG
itw_water_leak_009.JPG
Attachment 4: itw_water_leak_013.JPG
itw_water_leak_013.JPG
  2094   Wednesday, May 20, 2020, 13:30 David WangSafe Module ParkingMaintenance  Silo area radio active waste clean up.

Sorted and packed one 55 gallon drum with low contamination and active stuffs which are placed around silo area in the past. They include old poly water cooling lines replaced from ITE, ITW and TCS, contaminated paper  rags , gloves, and plastic bags,air cooling fans for turbo pumps, EE resistor packaged used on module top before, flow meters and cables used in ITW, etc. After packing, The field outside the drum on contact is less than 10 usv/hr.

  2093   Wednesday, May 20, 2020, 13:19 David WangITEMaintenance  Restart of ITE turbo pumps.

PLC6 drop out in weekend caused the ITH MP1 and MP1s stopped. ITE turbo pumps were running still after that. Without back up pump, TPs started to trip off  later .  I found TP1,TP3, and TP4 were  tripped off this morning. And , The rest pumps ran with high current draw.  Jon Aoki restarted back up pumps and ITE turbo pumps. The ITE vacuum system works fine now.

  2092   Wednesday, May 20, 2020, 13:08 David WangCoolingStandard Operation  Start of HALCW sysytem

High  active water pump is started. The system resistance is recovering now. Everything works fine so far. Check ITW and ITE water leak after pump is started. Tiny very slow seep on two small ball valves pack seal. No big concern.                                 

  2091   Friday, March 27, 2020, 08:45 Matthew GareauNorth Hot-CellMaintenance  Issues with the manipulators

 This is a link to all of the issues with the NHC manipulators that I know of

https://documents.triumf.ca/docushare/dsweb/View/Collection-27663/Document-180176

  2090   Thursday, March 19, 2020, 15:48 Anders MjosConditioning StationMaintenance  Filter replacement in water system March 5th

Filters were replaced by Curtis von Cube on March 5th. See work permit for details I2020-03-05-5