  RH-ISAC, Page 32 of 138  Not logged in ELOG logo
  ID Date Author Category Type Module Target/Number Subject
  2128   Monday, July 27, 2020, 10:00 Travis CaveSouth Hot-CellMaintenance  Entrance module move

 The West Entrance module has been moved from the west target station to the south hot cell for repairs.

  2127   Friday, July 24, 2020, 09:43 Travis CaveConditioning StationMaintenanceTM2Graphite #1Module move

 TM#2 has been moved from the west station to the conditioning station. ITW entrance module moved will take place on Monday morning. 

  2126   Tuesday, July 21, 2020, 14:22 Adam NewsomeSpent Target VaultStandard Operation  Emergency Close Mechanism Test

The emergency close mechanism for the Storage Vault door was tested by Adam Newsome and Travis Cave. The door was opened to its fully open limit, then closed with the emergency system.

The test was successful.

  2125   Thursday, July 16, 2020, 10:20 Adam NewsomeSafe Module ParkingMaintenance  SMP: Annual Electrical Inspection

An electrical systems check was performed on the SMP by Adam Newsome and Travis Cave. Overall, there were no issues to note. The following is a summary of the inspection (Work Permit I2020-07-16-1):

- Checked condition of wiring for physical/radiation/UV damage
- Checked for cable tray debris or damage
- Checked inside control panel: components and wiring, labeling
- Verified camera views
- Checked connectors for damage
- Checked pendant for damage and verified labeling intact
- Checked limit switch wiring and condition

  2124   Monday, July 13, 2020, 10:01 Travis CaveConditioning StationStandard OperationTM3no targetModule move

 TM#3 has been moved from the conditioning station to the silo.

 

  2123   Tuesday, July 07, 2020, 17:43 Carla BabcockITEDevelopmentTM4 RF tests on new IG-LIS wiring

Tested RF from RF driver into new IGLIS wires at ITE. Used 5V, 1MHz (2MHz setting because of internal halving issue).

As expected there was a very slight mismatch visible (original cable ~ 68 Ohms, new cable ~ 53 Ohms).

The matching resistor will be changed and it will be retested.

  2122   Tuesday, July 07, 2020, 09:16 Travis CaveConditioning StationStandard OperationTM3no targetModule move

 TM#3 has been moved from the silo to the conditioning station, where David and Frank will start on the gutting of the module.

  2121   Monday, July 06, 2020, 12:20 David WangITWStandard OperationTM2C#1Five shielding blocks to ITW

Five shielding blocks are transferred to ITW

  2120   Monday, July 06, 2020, 07:54 David WangITEStandard OperationTM4UCx 30TM4 has been connected in ITE connection

TM4 has been connected in ITE. Vacuum pumping down is good so far.

Attachment 1: Tm4_UCx_30_connection_checklist.pdf
Tm4_UCx_30_connection_checklist.pdf Tm4_UCx_30_connection_checklist.pdf Tm4_UCx_30_connection_checklist.pdf Tm4_UCx_30_connection_checklist.pdf
  2119   Friday, July 03, 2020, 14:08 Travis CaveITEStandard OperationTM4UC#30Module move

 TM#4 with UC#30 has been moved from the south hot cell to the east target station.

  2118   Friday, July 03, 2020, 13:23 David WangSouth Hot-CellStandard OperationTM4UCx#30TM4 UCx#30 Electrical check and HS leak check

Electrical and leak check are good. See attachment.

Attachment 1: TM4_UCx30_elctrical_and_leak_check_at_SHC..pdf
TM4_UCx30_elctrical_and_leak_check_at_SHC..pdf
  2117   Friday, July 03, 2020, 08:46 chad fisherSouth Hot-CellStandard OperationTM4UcX#30UCx#30 installed onto tm4

UCx#30 has been installed onto TM4 with new high current fasteners torqued to 130 in lbs.

  2116   Friday, July 03, 2020, 07:03 David WangSouth Hot-CellStandard OperationTM4BEFORE TARGET INSTALLATIONELECTRICAL CHECK BEFORE TARGET INSTALLATION.

PQ SHORT TO RU. A TO PQ 1.8 M OHM AT 500 V. THE REST ARE OL

Attachment 1: TM4_ELECTRICAL_CHECK_20220_07_02.pdf
TM4_ELECTRICAL_CHECK_20220_07_02.pdf
  2115   Friday, July 03, 2020, 06:57 David WangITWStandard OperationTM2C#1TM2 CONNECTION CHECKLIST

SEE ATTACHMENTS. EVERYTHING IS GOOD.

Attachment 1: TM2_C#1_CONNECTION_CHECKLIST.pdf
TM2_C#1_CONNECTION_CHECKLIST.pdf TM2_C#1_CONNECTION_CHECKLIST.pdf TM2_C#1_CONNECTION_CHECKLIST.pdf TM2_C#1_CONNECTION_CHECKLIST.pdf
  2114   Tuesday, June 30, 2020, 10:18 Travis CaveSouth Hot-CellStandard OperationTM4Test Proton to Neutron TargetModule move

 TM#4 has been moved from the east target station to the south hot cell.

  2113   Monday, June 29, 2020, 10:09 David WangITEStandard OperationTM4P2N test.ITE turbo pumps are stopped

ITE venting is in processing.

  2112   Friday, June 26, 2020, 15:00 David WangITWMaintenance  ITW TP1 and TP1S.

ITW TP1 can not be started yesterday. Also, TP1S was difficult to start , and had a high current draw after.  We changed both of them in pit today. TP1 and TP1S are started successfully after replacement.

  2111   Friday, June 26, 2020, 10:43 Adam NewsomeSpent Target VaultStandard Operation  Routine mechanical inspection: storage vault and mini-storage drive systems

An inspection was performed on drive systems for both storage vaults (main and mini) by Adam Newsome and Dan McDonald. The functionality was not tested. Overall, nothing concerning was discovered.

Main Storage Vault:

  • Chain inspected (OK) and lubricated
  • Gearbox inspected - OK
  • All drive system set screws checked and tightened (note: chain drive screw slightly loose)
  • Sprocket alignment checked - OK
  • Limit switches checked - OK
  • Emergency close mechanism cable checked - OK

Mini-Storage:

  • Chain inspected - OK
  • Set screw checked - OK
  • Gearbox inspected - OK (need inventory/spare in stock)
  • Roller wheels checked - OK

 

Attachment 1: IMG_20200626_092538.jpg
IMG_20200626_092538.jpg
Attachment 2: IMG_20200626_093208.jpg
IMG_20200626_093208.jpg
Attachment 3: IMG_20200626_093924.jpg
IMG_20200626_093924.jpg
Attachment 4: IMG_20200626_093951.jpg
IMG_20200626_093951.jpg
  2110   Thursday, June 25, 2020, 09:45 Travis CaveITWStandard OperationTM2Graphite #1Module move

 TM#2 with the graphite #1 target has been moved from the south hot cell to the west target station.

  2109   Tuesday, June 23, 2020, 10:56 David WangSafe Module ParkingStandard Operation  SMP annual service.

Dan and I did the SMP annual  maintenance service today. Lid open/close , vessel rotation and limit switch check, lubricate chains, tighten fasteners, and visual inspection.  Everything works fine.