Entry  Tuesday, October 15, 2013, 16:44, Grant Minor, Crane, Repair, , , Target Hall Crane - operational with temporary thermal sensor bypass ISAC_THall_Crane_elec_E5_1slash1_15Oct2013.pdf
E-mail correspondence on the Target Hall crane fault diagnosis between October 11th and 15th:
On 15/10/2013 3:34 PM, Grant Minor wrote:
Hello all,
Entry  Wednesday, August 14, 2024, 11:29, Aaron Tam, Waste Package/Ship, Standard Operation, , SiC#46, Target Disposal and visual check  SiC46.jfif
 SiC#46 loaded into pail 293 successfully along with other hotcell waste 
Upon visual inspection of the target, a spark-sign was spotted on the perimeter of the extraction electrode. Metallic looking material also found
built up between the extraction electrode and the backing plate of the target 
Entry  Wednesday, June 06, 2012, 13:36, chad fisher, South Hot-Cell, Standard Operation, TM1, Ta#38, Target Change Nb#6 - Ta#38 
Nb#6 was removed from TM1...it looked very clean.
Ta#38 was installed onto TM1...fit well.
Isaac Earle did this change with supervision in an effort to cross train.
Entry  Wednesday, January 19, 2022, 13:36, David Wang, Crane, Standard Operation, , , Targe hall crane below hook attachment pins and plates annual inspection.  2022-01-19_174.jpg2022-01-19_172.jpg
Tom Kauss inspected target hall crane below hook attachment pins and plates ITA6550-01. He certified the use of these pins and plates. The inspection
of these pins and plates was in Target hall crane annual check list. It was issued as a calibration index by Isaac Earle in 2022-Feb-08.  After inspection,
The inspection tag  was issued and attached to pin. Tom has an inspection record on this job. See attachments.
Entry  Wednesday, November 16, 2011, 07:44, chad fisher, South Hot-Cell, Standard Operation, TM1, TaC#1, TaC#1 Removal and inspection 
November 15, 2011 removed TaC#1 from TM1 and inspected TM1 for any obivous signs of trouble (Problems with EE at end of run).
Upon starting removal of the high current conductor fastener on A+ (Left oven leg) it became clear right away that the oven of the target was broken
as the leg moved as soon as the fasten was loosened.
Entry  Friday, September 06, 2024, 14:28, Aaron Tam, South Hot-Cell, Standard Operation, , Ta#68(Spare), Ta#68(Spare) removed from TM4 and into Anteroom  
September 5, 2024 -AT

    Plastic and clean target tray added to SHC 
    TM4 moved to SHC 
    TM4 containment box cover removed

September
6, 2024 - AT
Entry  Tuesday, October 08, 2024, 11:20, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#68, Ta#68 install onto TM2, w/ Troubleshooting  17x
October 7, 2024 - Aaron Tam 
Ta#68 HP-SIS checks performed at B1 lab, moved to anteroom, and inserted into SHC via tool port w/ Aaron Schmidt. 
Ta#68 fixed to source tray with 4 mounting bolts in order of: Right manip. holding, Top left, Right manip. removed, Bottom right, Top right, bottom
Entry  Tuesday, December 03, 2024, 15:53, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#68, Ta#68 Removal 22x
  Note: Ta#68 had a difficult install. See E-log ID# 2698 for more info 
First look:

    Containment box cover looks the same as previous (See:ID: 2697)
    Target shows large amount of soot-like deposits (See photos
Entry  Wednesday, December 04, 2024, 14:30, Aaron Tam, South Hot-Cell, Standard Operation, , Ta#68, Ta#68 PIE 32x
 Abstract:
This target has seen some irregular beam patterns 
Possibility that the beam hit the walls of the target tube or even the cooling fins
Entry  Thursday, October 10, 2024, 10:24, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#67, Ta#67 PIE  35x
 Post Irradiation Examination
October 9, 2024 - Aaron Tam w/ Chad Fisher, Aurelia Laxdal, and Lucas Backes 
PIE conducted by Chad with direction from Aurelia. Aaron and Lucas observing/documenting 
Entry  Friday, January 12, 2024, 11:25, David Wang, South Hot-Cell, Standard Operation, TM2, Ta#66, Ta#66 post operation electrical check at SHC TM2_Ta66_post__oeration_electrical_check.pdf
Ta#66 post operation electrical check was done at SHC this Monday. See attachment. 
Entry  Wednesday, January 17, 2024, 20:09, Carla Babcock, South Hot-Cell, Standard Operation, , Ta#66, Ta#66 post irradiation inspection 20240109_100926(1).jpg20240109_101053.jpg20240109_102409.jpg
On Jan. 9 we did the PIE on Ta#66. Opened the heat shield and removed the EE. The inside of the heat shield was very black with lots of flakes falling
off. The target itself looked overheated, and the container looked pretty bad for a Ta target. The outside of the EE looked perfect but after removing
it there was a lot of black stuff on the side and we saw that the Re foil was curled up. Jens said during the runtime that he saw something that looked
Entry  Wednesday, August 26, 2020, 09:52, David Wang, South Hot-Cell, Standard Operation, TM2, Ta#60, Ta#60 target electrical check and leak check at SHC. Ta_60_electrical_checklist.pdf
Electrical check and leak check at SHC. NO leak. electrical check ok.   Before target on, A is short to PQ, RU is short to HS ( 60KV bias)
as we measured before. 
Entry  Tuesday, November 05, 2019, 12:46, chad fisher, South Hot-Cell, Standard Operation, TM2, ta#59, Ta#59 removed 
Ta#59 has been removed from TM2 and it is now ready for electrical check.
Entry  Tuesday, November 05, 2019, 11:57, David Wang, ITE, Standard Operation, TM2, Ta 59, Ta#59 disconnection checklist Ta#59_disconnection_checklist.pdf
See attachment
Entry  Tuesday, November 27, 2018, 13:31, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#57, Ta#57 removal 
Ta#57 has been removed from TM4.
Entry  Wednesday, July 18, 2018, 14:20, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#56, Ta#56 Installed 
Ta#56 has been installed onto TM4 with new fasteners. High current fasteners torqued to 130 in lbs.
RIB "shield" has been removed in  preparation for insertion of new optics tray.
Entry  Wednesday, September 27, 2017, 08:00, chad fisher, South Hot-Cell, Standard Operation, TM2, Ta#54, Ta#54 installed 
Containment box has been replaced onto TM2, interior of containment box vacuumed, and Ta#54 installed with new fasteners (high current torqued to 130
in lbs).
Entry  Monday, August 28, 2017, 12:07, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#21, Ta#52 removed UCx#21 installed 
Ta#52 has been removed from TM$ and UCx#21 installed with new mounting and high current hardware. High current fasteners torqued to 130 in lbs.
Entry  Tuesday, June 06, 2017, 13:42, chad fisher, South Hot-Cell, Standard Operation, TM2, SiC#36, Ta#51 removed SiC#36 installed 
This afternoon Ta#51 was removed from TM2 and SiC#36 installed.
All new fasteners used. High current fasteners torqued to 130 in lbs.
 