ID Date Author Category Type Module Target/Number Subject Text Attachments
  2155   Friday, October 16, 2020, 10:36 Travis CaveITWStandard OperationTM2Ta#60Module move TM#2 with Ta#60 is now in the south
hot cell.
  
  2154   Thursday, October 15, 2020, 12:48 Travis CaveITEStandard OperationTM4UC#31Module move TM#4 is now back in the east target
station.
  
  2153   Tuesday, October 13, 2020, 10:16 Travis CaveITERepairTM4UC#31Module move TM#4 is now in the south hot cell
from the east target station.
  
  2152   Wednesday, September 30, 2020, 09:54 Travis CaveSouth Hot-CellStandard OperationTM3no targetModule move TM#3 is now in the south hot cell.   
  2151   Tuesday, September 29, 2020, 14:28 David WangSouth Hot-CellStandard OperationTM4UC#31TM4 UC#31 Electrical check and HS leak checkTm4 UCx 31# electrical check result. See
attachment.
 TM4_UCx31_elctrical_and_leak_check_at_SHC..pdfScanned_from_a_Xerox_Multifunction_Printer.pdf 
  2150   Tuesday, September 29, 2020, 12:29 Travis CaveITEStandard OperationTM4UC#31Module move Module move of TM#4 with UC#31 was
finished to today at around 10:30AM.
  
  2149   Tuesday, September 29, 2020, 12:12 David WangITERepairTM4 TM4 steerers staus after" left " grounding issue, and first stage investigation
Left (short) is switched with bottom. So
on module:
  
  2148   Thursday, September 24, 2020, 11:25 David WangConditioning StationStandard OperationTM4UC#31TM4 HS line leak check at SHC and TCS.Both helium spray and helium pressurize
on TM4 HS line withUCx31 target are done
at SHC and TCS. No leak.
  
  2147   Thursday, September 24, 2020, 10:34 Travis CaveSpent Target VaultStandard Operation UC#30Spent Target Move UC#30 has been placed into the spent
target vault, it was placed in pail 238 and
in spot 1A of the vault. It was 81.5 mSv/hr
 Target_Index_2020-09-24.pdf 
  2146   Wednesday, September 23, 2020, 10:56 chad fisherSouth Hot-CellStandard OperationTM4UC#31 P2NUc#30 removed UC#31 P2N installedUCx#30 has been removed from TM#4 and put
in a can with argon. 5(10) pin connector
had to have guide screws removed to be uninstalled.
  
  2145   Tuesday, September 22, 2020, 10:56 Travis CaveSouth Hot-CellStandard OperationTM4UC#30Module move TM#4 with UC#30 has been moved from
ITE to the south hot cell.
  
  2144   Friday, September 11, 2020, 11:25 Travis CaveITWStandard OperationTM2Ta#60Module move Both the west entrance module and
TM#2 with Ta#60 have been moved back into
ITW.
  
  2143   Tuesday, September 08, 2020, 10:37 Travis CaveITWStandard Operation no targetEntrance module move The West Entrance module has been
moved to the south hot cell for repairs.
  
  2142   Thursday, August 27, 2020, 13:18 Anders MjosConditioning StationMaintenanceTM2 New Power Supply installed for TGHTArthur installed a new Magna Power PS for
the TGHT yesterday. The old power supply
has been moved to Evaporator 2. The power
  
  2141   Thursday, August 27, 2020, 11:14 Travis CaveSpent Target VaultStandard Operation Graphite #1Spent Target Move Graphite #1 along with the broke
2A2M19 wire scanner have been placed in the
spent target vault see attached PDF for deatails.
 Target_Index_2020-08-27.pdf 
  2140   Thursday, August 27, 2020, 09:42 Anders MjosConditioning StationMaintenanceTM2Ta#60Refilled TK2Refilled TCS:TK2 from 10 in to 22 in using
the newly installed valve.
  
  2139   Thursday, August 27, 2020, 08:21 David WangConditioning StationStandard OperationTM2Ta#60Helium pressure check on TM2 HS line at TCS.Helium pressurize on TM2 HS line at TCS
is done.    Base LR is 0.0X
E-9 
  
  2138   Wednesday, August 26, 2020, 09:52 David WangSouth Hot-CellStandard OperationTM2Ta#60Ta#60 target electrical check and leak check at SHC.Electrical check and leak check at SHC.
NO leak. electrical check ok.  
Before target on, A is short to PQ, RU is
 Ta_60_electrical_checklist.pdf 
  2137   Tuesday, August 25, 2020, 09:38 Travis CaveSouth Hot-CellStandard OperationTM2Graphite #1Module move TM#2 with Graphite #1 has been moved
from the conditioning station to the south
hot cell.
  
  2136   Monday, August 24, 2020, 10:11 Adam NewsomeITWStandard Operation  Entrance Module to ITWEntrance Module was moved from South Hot
Cell to ITW Station.
Note: weight of entrance module,
  