Thursday, September 24, 2020, 10:34, Travis Cave, Spent Target Vault, Standard Operation, , UC#30, Spent Target Move
|
UC#30 has been placed into the spent target vault, it was placed in pail 238 and in spot 1A of the vault. It was 81.5 mSv/hr when removed from
the south hot cell. |
Wednesday, September 23, 2020, 10:56, chad fisher, South Hot-Cell, Standard Operation, TM4, UC#31 P2N, Uc#30 removed UC#31 P2N installed
|
UCx#30 has been removed from TM#4 and put in a can with argon. 5(10) pin connector had to have guide screws removed to be uninstalled.
UCx#31 P2N installed. |
Tuesday, September 22, 2020, 10:56, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#30, Module move
|
TM#4 with UC#30 has been moved from ITE to the south hot cell. |
Friday, September 11, 2020, 11:25, Travis Cave, ITW, Standard Operation, TM2, Ta#60, Module move
|
Both the west entrance module and TM#2 with Ta#60 have been moved back into ITW. |
Tuesday, September 08, 2020, 10:37, Travis Cave, ITW, Standard Operation, , no target, Entrance module move
|
The West Entrance module has been moved to the south hot cell for repairs. |
Thursday, August 27, 2020, 13:18, Anders Mjos, Conditioning Station, Maintenance, TM2, , New Power Supply installed for TGHT
|
Arthur installed a new Magna Power PS for the TGHT yesterday. The old power supply has been moved to Evaporator 2. The power supply was configured for
remote operation and tested successfully with low current (30 A). |
Thursday, August 27, 2020, 11:14, Travis Cave, Spent Target Vault, Standard Operation, , Graphite #1, Spent Target Move
|
Graphite #1 along with the broke 2A2M19 wire scanner have been placed in the spent target vault see attached PDF for deatails. |
Thursday, August 27, 2020, 09:42, Anders Mjos, Conditioning Station, Maintenance, TM2, Ta#60, Refilled TK2
|
Refilled TCS:TK2 from 10 in to 22 in using the newly installed valve. |
Thursday, August 27, 2020, 08:21, David Wang, Conditioning Station, Standard Operation, TM2, Ta#60, Helium pressure check on TM2 HS line at TCS.
|
Helium pressurize on TM2 HS line at TCS is done. Base LR is 0.0X E-9 atm.cc/sec. 70 psi helium 3 minutes. No response. Also, The TCS vacuum pumping
down over night is good. |
Wednesday, August 26, 2020, 09:52, David Wang, South Hot-Cell, Standard Operation, TM2, Ta#60, Ta#60 target electrical check and leak check at SHC.
|
Electrical check and leak check at SHC. NO leak. electrical check ok. Before target on, A is short to PQ, RU is short to HS ( 60KV bias)
as we measured before. |
Tuesday, August 25, 2020, 09:38, Travis Cave, South Hot-Cell, Standard Operation, TM2, Graphite #1, Module move
|
TM#2 with Graphite #1 has been moved from the conditioning station to the south hot cell. |
Monday, August 24, 2020, 10:11, Adam Newsome, ITW, Standard Operation, , , Entrance Module to ITW
|
Entrance Module was moved from South Hot Cell to ITW Station.
Note: weight of entrance module, as shown via overhead crane's load cell, is 14,900 lbs. |
Wednesday, August 19, 2020, 10:17, Adam Newsome, South Hot-Cell, Standard Operation, , , ITW Entrance Module moved to SHC
|
ITW Entrance Module was moved from west station to South Hot Cell. |
Tuesday, August 18, 2020, 09:57, Adam Newsome, Conditioning Station, Standard Operation, TM2, , TM2 Moved to Conditioning Station
|
TM2 was moved from ITW to the Conditioning Station. |
Tuesday, August 18, 2020, 09:06, David Wang, ITW, Standard Operation, TM2, , TM2 and ITW entrance module have been disconnected in ITW
|
Tm2 and itw entrance module have been disconnected in ITW. I will attach disconnection checklist later. |
Thursday, August 06, 2020, 14:33, Adam Newsome, Spent Target Vault, Development, , , Safety Group Relay Interface Installation
|
A relay contact-based interface module was installed in between Safety Group's storage vault door enable junction box and Remote Handling's control module
for the vault door.
|
Thursday, July 30, 2020, 09:57, Travis Cave, ITW, Standard Operation, TM2, Graphite #1, Module move
|
TM#2 with Graphite #1 has been moved back to the west target station from the conditioning station. |
Wednesday, July 29, 2020, 09:20, Travis Cave, ITW, Maintenance, , , Entrance module move
|
The West Entrance module has been moved from the south hot cell back to the West Target Station. |
Tuesday, July 28, 2020, 09:26, chad fisher, South Hot-Cell, Repair, , , Entrance Module Wire Scanner
|
Entrance module wire scanner has been replaced. Pictures to follow. |
Monday, July 27, 2020, 10:00, Travis Cave, South Hot-Cell, Maintenance, , , Entrance module move
|
The West Entrance module has been moved from the west target station to the south hot cell for repairs. |
|