Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2201     Entry time: Wednesday, March 17, 2021, 09:10
Author: Travis Cave 
Category: ITE 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Entrance module move 

 The east entrance module is now back at the east target station.

ELOG V2.9.2-2455