Thursday, November 19, 2020, 12:00, Adam Newsome, Spent Target Vault, Standard Operation, , C#2, Spent Target Move
|
C#2 has been moved from the south hot cell to the spent target vault. It is in spot 8A of the vault in pail # 235 and was 185 mSv/hr upon removal from the south hot cell.
The Target Index spreadsheet has been updated on DocuShare. |
Thursday, November 19, 2020, 09:00, David Wang, Conditioning Station, Standard Operation, TM2, Nb#6, Helium pressure check on TM2 HS line at TCS.
|
LD 0.0 Xe-9 atm.cc/sec , 70 psi helium 3 minutes. No leak. |
Wednesday, November 18, 2020, 15:28, David Wang, South Hot-Cell, Standard Operation, TM2, Nb#6, electrical check and HS leak check.
|
Everything looks good. A still short to P before target installation. We will float P,Q as before on module top. |
Tuesday, November 17, 2020, 10:17, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , Module Move
|
TM2 has been moved from ITW to the South Hot Cell.
Reading at ITW: 114 mSv/hr
Reading at SHC: 85 mSv/hr |
Thursday, November 12, 2020, 10:02, Travis Cave, Spent Target Vault, Standard Operation, , UC#31, Spent Target Move
|
UC#31 has been moved from the south hot cell to the spent target vault. It is in spot 8B of the vault in pail # 224 and was 3.71mSv/hr upon removal from the south hot cell. |
Thursday, November 05, 2020, 10:48, Travis Cave, ITE, Standard Operation, TM4, Ta#61, Module move
|
TM#4 with Ta#61 has been moved from the south hot cell to the east target station. |
Thursday, November 05, 2020, 10:23, David Wang, Spent Target Vault, Standard Operation, , , TM2 old source tray and TM4 optic tray in vault tray#9.
|
TM2 old source tray and TM4 optic tray are stored together in vault tray#9. The fielding measurement at SHC post 0.5 meter distance:
March 1st 2019, maximum 14.6msv/hr, minimum 4.78 msv/hr
Nov 2nd 2020, max 7.11m sv/hr, min 2.5msv/hr. |
Tuesday, November 03, 2020, 10:52, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#31, Module move
|
TM#4 with UC#31 has been moved from the east target station to the south hot cell. |
Friday, October 30, 2020, 09:02, Travis Cave, Spent Target Vault, Standard Operation, , Ta#48,51,54 SiC#35, and UC#25, Repacking of the targets.
|
Targets Ta#48,51,54 SiC#35, and UC#25 were repacked and placed in the mini vault. In the following order back to front. SiC#35 (240), Ta#54(241), UC#25(244), Ta#48(243), Ta#51(242).
Also during this repacking Ta#60 was also placed in the Spent Target Vault in spot 7B in pail# 239. |
Tuesday, October 27, 2020, 11:46, Matthew Gareau, North Hot-Cell, Repair, , , Ratcheting repair issues with both left and right master
|
The were issues with both left and right master ratcheting;
- the left handle was getting stuck in a close position when there was a higher ratcheting tension added
- the right ratcheting was not tightening preventing proper use of the manipulator
Chad and myself were able to identify a missing set screw for the tong cable.
Once this was added the issue with the left master ratcheting seems to be solved.
Lubricant was added to the left master ratchet and this seems to solve this problem as well.
There was also an observation of missing set screws on the spare manipulator for attaching the wrist to the ratcheting handle, which will need to be ordered and attached.
|
Tuesday, October 20, 2020, 10:14, Travis Cave, ITW, Standard Operation, TM2, C#2, Module move
|
TM#2 with C#2 has been moved from the south hot cell to the West Target Station. |
Monday, October 19, 2020, 12:52, David Wang, South Hot-Cell, Standard Operation, TM2, C#2, TM2 electrical and leak check at SHC
|
TM2 electrical check and leak check are done at SHC with C#2 target installed. The results are good. |
Friday, October 16, 2020, 10:36, Travis Cave, ITW, Standard Operation, TM2, Ta#60, Module move
|
TM#2 with Ta#60 is now in the south hot cell. |
Thursday, October 15, 2020, 12:48, Travis Cave, ITE, Standard Operation, TM4, UC#31, Module move
|
TM#4 is now back in the east target station. |
Tuesday, October 13, 2020, 10:16, Travis Cave, ITE, Repair, TM4, UC#31, Module move
|
TM#4 is now in the south hot cell from the east target station. |
Wednesday, September 30, 2020, 09:54, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Module move
|
TM#3 is now in the south hot cell. |
Tuesday, September 29, 2020, 14:28, David Wang, South Hot-Cell, Standard Operation, TM4, UC#31, TM4 UC#31 Electrical check and HS leak check
|
Tm4 UCx 31# electrical check result. See attachment. |
Tuesday, September 29, 2020, 12:29, Travis Cave, ITE, Standard Operation, TM4, UC#31, Module move
|
Module move of TM#4 with UC#31 was finished to today at around 10:30AM. |
Tuesday, September 29, 2020, 12:12, David Wang, ITE, Repair, TM4, , TM4 steerers staus after" left " grounding issue, and first stage investigation
|
Left (short) is switched with bottom. So on module:
"Left" is bottom in module actually
"Bottom and Right" is Left and right in module actually.
For the connection in ITE:
Left cable is connected to "left" ( bottom in module actually)
Top cable is connected to " Bottom and Right"( left and right in module actually)
Bottom and Right cable is connected to "Top" which is top in module.
Frank and I removed the panel, disconnected the "Left"cable inside panel, and checked cable to ground resistance. "Left "is dead short to ground on ohmmeter check still. So the short could be on cable or inside source tray. Further investigation is planned to confirm the short location. |
Thursday, September 24, 2020, 11:25, David Wang, Conditioning Station, Standard Operation, TM4, UC#31, TM4 HS line leak check at SHC and TCS.
|
Both helium spray and helium pressurize on TM4 HS line withUCx31 target are done at SHC and TCS. No leak. |
|