Entry  Friday, February 12, 2021, 07:07, David Wang, ITE, Maintenance, , , ITW and ITE clean up. 

Vacuum cleaned ITW and ITE station. 

Entry  Wednesday, February 10, 2021, 13:30, David Wang, Safe Module Parking, Standard Operation, , , TM2 and TM4 electrical check without targets. TM2_and_TM4_electrical_check_without_target.pdf

 TM2 at SMP under vacuum. TM4 at silo.  Frank and I did the tests. Everything is fine on TM4 check.  On TM2,  all mega test at 500V are around 200K ohms which is so abnormal. We will move TM2 to TCS and  start investigation there.

Entry  Wednesday, February 10, 2021, 11:34, David Wang, Assembly/Bench Test, Standard Operation, , , Old resin can and 2A window RH clamp field measurement at silo.  

Old resin can:  0.5 meter 360 degree rotation above silo area, 350u sv/hr.   On contact  3.0 to 3.5 msv/hr.  It was replaced during 2017 winter shut down, and stored in silo since then.

2a window RH clamp: 0.5 meter, 160 usv/hr.  On contact, hottest spot 3.5msv/hr, general,1.8 msv/hr. 

 Both of them were raise out of storage silo with TH crane. Pole monitor was used for field check.

Entry  Wednesday, February 03, 2021, 09:14, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 from TCS to SW silo. 

TM4 is moved from TCS to SW silo. The moving is smooth.

 

 

 

 

 

 

 

 

 

 

 

Entry  Wednesday, January 27, 2021, 14:30, David Wang, Cooling, Development, , , High active water system purging 

High active water are purged to holding tank at B2  level. There should be around 48 gallons are purged out of system. No purging on dump circuits on both ITW/ ITE.

Entry  Monday, January 25, 2021, 12:33, David Wang, ITW, Standard Operation, , , ITW bias HV test 

Ramp up ITW bias to 57KV. no spark. 200uA leaking current at 57KV. The test is done without target module in station.   ITW water circuits are looped in pit.  EE , EL are switched off during the test. 

Entry  Monday, January 25, 2021, 10:57, David Wang, South Hot-Cell, Repair, TM4, , TM4 steers short investigation. 

Cables were disconnected for steers in containment box. The Megga measurement (500V) result from the top of the module:

Left to right: OL, left to top OL,  left to bottom OL, right to top OL, right to bottom OL,  Top to bottom OL. And all of them to ground are OL.  No short on cables from module top to steers itself. The short should be inside the steers. It will be confirmed with directly test on steers.  

Entry  Friday, January 22, 2021, 12:34, David Wang, ITE, Standard Operation, , , ITE HV test. 

ITE annual HV test is done. No module in station. The bias power supply has been ramped up to 49KV on control page. We still have voltage limit issue on this PS at 48KV so it only can go to 47.7 KV on PS panel. No major spark during test.. The test result is same as last year test which was did in March 2020. 

Entry  Tuesday, January 19, 2021, 11:32, Travis Cave, Safe Module Parking, Standard Operation, TM2, Nb#9, Module move 

 TM#2 with Nb#9 was moved from ITW to SHC and then with no target it was moved from the SHC to the SMP.

Entry  Monday, January 18, 2021, 12:29, David Wang, ITW, Standard Operation, TM2, Nb#9, ITW vacuum and TM2 water lines leak check . 

ITW primary and secondary vacuum vessel leak check are done. There is a 5XE-8 atm.cc/sec leak on Exit service cap NW side square panel.  The leak is small. And, it is close to ITW TP3 so it is not affect ion beam line vacuum during operation. We will replace the seal on the panel later.   The rest leak check on air to vacuum seals are good. TM2 water lines are pressurized with 70 psi helium. We did it  3 hours after water lines are purged. No leak was showed during the check.

2021-02-24th: The o-ring on exit 1 NW side square panel is replaced by David Wang and Frank Song. 

Entry  Friday, January 08, 2021, 09:40, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#61, Module move 

 TM#4 with Ta#61 has been moved from the east target station to the south hot cell.

Entry  Wednesday, January 06, 2021, 10:39, David Wang, ITE, Standard Operation, TM4, , ITE and TM4 annual leak check. 

Frank and I finished ITE and TM4 primary and secondary  vacuum vessel  leak check. LD bease leak rate 0.0x-9atm.cc/sec. No leak has been found.Also, All TM4 water lines  have been pressurized with 70psi helium fro 3 minutes on each circuit. All water lines in TM4 are good. No resopne on LD during test. 

Entry  Monday, January 04, 2021, 12:13, Adam Newsome, Conditioning Station, Development, TM3, , TM3 Move 

TM3 was remotely moved from the South Hot Cell to the conditioning station. No containment box.

Entry  Thursday, December 24, 2020, 09:00, Matthew Gareau, North Hot-Cell, Development, , , NHC USB connection 

24/Noc/2020

USB was discovered to be in the reverse direction and will need to be change around to become operational

 

01/Dec/2020

USB was pulled from conduit

While attempting to re-pull the USB in the correction direction, the ethernet cable was damaged and need to be replaced,

(thanks to the Hubert's team for the wire help) 

It was decided that it was too problematic to re-pull the wires with all other wires in the way. Therefore all the wires were removed from the operator control panel, and pulled so that the USB, USB power cord, and ethernet could be re-pulled all together.

However, even once all the wires were re-pulled and reconnected it was discovered that the USB had become damaged, and was removed again.

 

23/Dec/2020

- A new conduit was added through to the NHC, for only the USB

- USB was fed through, reconnected, and tested

- Putty will need to be added around the conduit to ensure a good seal into NHC

Entry  Monday, December 21, 2020, 11:22, Adam Newsome, Crane, Standard Operation, , , Crane Shutdown for Power Outage 

The Target Hall Crane has been shut down in preparation for the power outage tomorrow (Dec 22). Power will be restored on Dec 23.

 

Dec 23 update: power has been restored. The crane appears to be in working condition as there is no fault indicator on the PLC.

Entry  Thursday, December 10, 2020, 15:07, Adam Newsome, South Hot-Cell, Development, TM3, , TM3 Move 

TM3 was remotely moved from the conditioning station to the South Hot Cell. No containment box.

Entry  Monday, December 07, 2020, 12:20, Adam Newsome, Conditioning Station, Development, TM3, , TM3 Move 

TM3 has been moved from the South Hot Cell to the Conditioning Station. No containment box.

Entry  Wednesday, November 25, 2020, 09:05, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , Module Move 

TM3 has been moved from the Silo to the South Hot Cell.

Entry  Tuesday, November 24, 2020, 12:56, David Wang, ITW, Standard Operation, TM2, Nb#9, TM2 has been connected in ITW TM2_Nb#9_module_connection_checklist.pdf

TM2 has been connected to ITW. Turbo pumps are stared. ITW pumping down is fine so far.

Entry  Tuesday, November 24, 2020, 09:37, Adam Newsome, ITW, Standard Operation, TM2, , Module Move 

TM2 has been moved from the Conditioning Station to ITW. 