547
|
Monday, November 18, 2013, 16:44 |
Bevan Moss | Conditioning Station | Standard Operation | | | Testing of cooling package | I have tested all of the compressors
for TCS. All are operational and cycled as
they should. |
|
1741
|
Monday, June 25, 2018, 16:42 |
Anders Mjos | Conditioning Station | Development | | | Testing new high current connectors | Shorted TGHT with new high current connector
assembly and heated to 600 A. Temperature
measured on half way point on cable ~ 70 |
|
1117
|
Friday, November 06, 2015, 14:36 |
Anders Mjos | Conditioning Station | Development | TM3 | FEBIAD test target | Testing TM3 | Friday, November 06, 2015, 14:35: Roughing
Turbos was started around 4pm. Later
it was found that the manual valve for the |
|
1121
|
Tuesday, November 10, 2015, 16:53 |
Anders Mjos | Conditioning Station | Development | TM3 | FEBIAD test target | Testing TM3 | Tuesday, November 10, 2015, 16:53: Roughing
Tuesday, November 10, 2015, 18:24:
TP1S started |
|
1601
|
Friday, August 25, 2017, 16:33 |
Anders Mjos | Conditioning Station | Repair | | | Testing HV after cooling line repair | The BIAS voltage was brought up to
70 kV today and held there for 1h. No sparking
observed. |
|
1674
|
Tuesday, January 02, 2018, 15:17 |
Anders Mjos | Conditioning Station | Maintenance | | | Tested chiller | Tested all 3 compressors and MP2 |
|
1532
|
Wednesday, May 10, 2017, 14:00 |
Anders Mjos | South Hot-Cell | Development | | ITE-Ta-LP-FEBIAD | Test target examination | Chad and Anders inspected the test target
in the hot cell today. The lid had been previously
removed. |
|
17
|
Tuesday, August 02, 2011, 09:41 |
Pierre Bricault | Conditioning Station | Repair | TM1 | ITW-TM1-Ta#37-LP-SIS | Test high voltage on TM1 | TM1 has received the Ta#37-LP and
has been pumping since thursday. This morning
the pressure gauges read, IMG1: 1.6x10^-6 |
|
1089
|
Thursday, October 01, 2015, 09:18 |
Travis Cave | Spent Target Vault | Standard Operation | | | Targets transfered to mini storage. | In preparation for shipping of the spent
targets five have been moved to the mini
storage. The following target were moved |
|
2029
|
Thursday, November 14, 2019, 13:52 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#22,23,24 | Targets repackaged | The targets UC#22,23,24 have been
repackaged into the newer stronger pails,
and have been placed back in the mini vault |
|
2322
|
Thursday, May 19, 2022, 11:42 |
Travis Cave | Spent Target Vault | Standard Operation | | Sic#39, Ta#59, C#2, UC# 32 & 30 | Targets moved to the mini vault. | Sic#39, Ta#59, C#2, UC# 32 &
30 have been moved from the spent target
vault to the mini vault. See the attached |
|
2592
|
Wednesday, May 15, 2024, 10:06 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#38,40 Ta#62,63 SiC#44 | Targets moved to the mini vault. | Targets UC#38,40 Ta#62,63 SiC#44
have been moved from the spent target vault
to the mini vault in preparation for F-308 |
|
1653
|
Thursday, October 26, 2017, 13:20 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#30,ZrC#7,Ta#44,TiC#4, and Ta#41 | Targets moved to mini storage | SiC#30,ZrC#7,Ta#44,TiC#4, and Ta#41 have
been moved from the spent target storage
to the mini storage. See attached PDF for |
|
594
|
Wednesday, February 05, 2014, 14:12 |
Travis Cave | Spent Target Vault | Standard Operation | | | Targets moved from mini storage to F-308s | All targets in the mini storage (4) have
been moved from there and placed into the
F-308s and those have been moved to the mech |
|
681
|
Thursday, June 12, 2014, 09:42 |
Travis Cave | Spent Target Vault | Standard Operation | | | Targets moved from mini storage to F-308s | Five targets have been moved from the spent
target storage to the mini storage. The targets
that were moved are UCx #'s 6,7,8 , SiC #28, |
|
1908
|
Thursday, April 18, 2019, 10:04 |
Travis Cave | South Hot-Cell | Maintenance | | Ta#50, SiC#34, Ta#46, Ta#47, and Ta#45 | Target transfer from old pail to new pail. | Targets Ta#50 and SiC#34 have been
transferred from their old pails to new ones.
Ta#50 was done on April 12th 2019 it was |
|
499
|
Tuesday, October 08, 2013, 14:58 |
Anders Mjos | South Hot-Cell | Standard Operation | | SiC#29 | Target to Heat Shield electrical short | The SiC#29 CTL target has been taken apart
with the help of Isaac and Chad. Electrical
measurements were done between Target and |
|
66
|
Thursday, January 05, 2012, 11:40 |
Travis Cave | Spent Target Vault | Standard Operation | | | Target swapping | Looks like the UC target s #1 and #2 were
found invalidprize winners for their all
inclusive trip to Chalk River and have thus |
|
2300
|
Tuesday, January 25, 2022, 12:49 |
David Wang | ITE/ITW | Standard Operation | | | Target station vacuum system visual inspection. | Two shielding blocks above vacuum
station at TH west end were opened for inspection.
Checked ITH:MP1, MP2 lubricant color and |
|
2709
|
Thursday, October 24, 2024, 10:42 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#44 | Target repacked moved to the mini vault. | On October 22 2024 the spent SIC#44
returned from CNL was repacked in a new pail
it was in pail 275 and repacked into pail |
|