Entry  Wednesday, January 19, 2022, 13:26, David Wang, Crane, Standard Operation, , , Inpection of Target module lifting frames ITA0494-1997-01 and ITA0494-1997-02.  2022-01-19_170.jpg2022-01-19_173.jpg2022-01-19_175.jpg2022-01-19_176.jpg
Entry  Wednesday, January 19, 2022, 09:00, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta #63, Electrical check on TM4 at NHC without target 20220119_080049.jpg
Entry  Tuesday, January 18, 2022, 11:02, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta #63, TM4 SIS with Target and No external Connections tm4_with_Ta#63_on_NHC.jpg
Entry  Monday, January 17, 2022, 10:44, Frank Song, South Hot-Cell, Standard Operation, TM2, UC#36 (the target removed), TM2 electrical check without Target. TM2_without_UCx36_at_SHC_(2).jpg
Entry  Wednesday, January 12, 2022, 14:09, Travis Cave, Spent Target Vault, Standard Operation, , UC#36, Spent Target Move Target_Index_2022-01-12.pdf
Entry  Tuesday, January 11, 2022, 11:51, David Wang, North Hot-Cell, Standard Operation, TM2, , TM2 has been moved from NHC to SMP. 
Entry  Tuesday, January 11, 2022, 11:50, David Wang, ITW, Maintenance, , , ITW Exit module 1 side sqaure panel O-ing seal replacement. 
Entry  Monday, January 10, 2022, 12:38, David Wang, North Hot-Cell, Standard Operation, TM2, , TM2 has been moved from ITW to NHC. 
Entry  Monday, January 10, 2022, 09:31, David Wang, ITE, Standard Operation, TM4, , ITE primary and secondary vacuum vessel leak check.  
Entry  Thursday, January 06, 2022, 13:54, David Wang, ITE, Standard Operation, TM4, , helium pressure test on TM4 internal cooloing lsine at ITE. 
Entry  Thursday, January 06, 2022, 10:37, David Wang, ITW, Standard Operation, TM2, , ITW vacuum vessel and TM2 internal cooling lines leak check in pit.  
Entry  Wednesday, January 05, 2022, 12:45, Frank Song, ITW, Maintenance, TM2, UC#36, TM2 SIS with Target and No external Connections TM2_with_UCx36.jpg
Entry  Wednesday, January 05, 2022, 09:38, Frank Song, ITE, Maintenance, TM4, Ta #63, TM4 SIS with Target and No external Connections tm4_with_Ta#63.jpg
Entry  Tuesday, November 30, 2021, 12:51, David Wang, ITE, Standard Operation, TM4, Ta#63., Tm4 has been connected in ITE.  from_my_cellphone_2598_647.jpgfrom_my_cellphone_2598_648.jpgfrom_my_cellphone_2598_649.jpgfrom_my_cellphone_2598_650.jpg
Entry  Tuesday, November 30, 2021, 11:03, David Wang, ITE, Standard Operation, TM4, Ta#63., Remotely remove TM4(Ta#63) from TCS to ITE. 
Entry  Monday, November 29, 2021, 12:16, David Wang, Spent Target Vault, Standard Operation, , , Five spent targets have been loaded into F308s 
Entry  Friday, November 26, 2021, 10:52, Adam Newsome, Spent Target Vault, Standard Operation, , UC#35, Spent Target Move Target_Index_2021-11-26.pdf
Entry  Thursday, November 25, 2021, 10:33, David Wang, Conditioning Station, Standard Operation, TM4, Ta#63. , helium pressure test on TM4 HS line at TCS.  
Entry  Wednesday, November 24, 2021, 09:08, Adam Newsome, Conditioning Station, Standard Operation, TM4, , Remotely moved TM4 from SHC to TCS 
Entry  Wednesday, November 24, 2021, 07:17, Frank Song, South Hot-Cell, Standard Operation, TM4, Ta #63, TM4 SIS with Target and No external Connections IMG_4469.JPG