650
|
Tuesday, April 15, 2014, 08:53 |
Travis Cave | ITE | Standard Operation | TM3 | TiC#4 | module move | TM#3 with TiC#4 has been moved from the
conditioning station to the east target station. |
|
653
|
Wednesday, April 30, 2014, 12:03 |
Travis Cave | Spent Target Vault | Standard Operation | | 2A3 window | Window now in vault | The 2A3 window now has a lid, and lift
yolk on it and it has been installed in the
spent target vault in spot 2A. The lid is |
|
654
|
Monday, May 05, 2014, 10:40 |
Travis Cave | ITE | Standard Operation | TM3 | TiC#4 | module move | TM#3 with TiC#4 has been moved from the
east station to the south west silo. |
|
657
|
Tuesday, May 06, 2014, 14:05 |
Travis Cave | ITE | Standard Operation | | | module move | The entrance module was out a new seal
went in and then the entrance module went
back, and then TM#3 went back. So all modules |
|
662
|
Wednesday, May 21, 2014, 13:56 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target assay | All targets in the vault have been assayed
and measured. Results will be posted soon. |
|
663
|
Wednesday, May 21, 2014, 13:56 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target assay | All targets in the vault have been assayed
and measured. Results will be posted soon.
|
|
666
|
Tuesday, May 27, 2014, 10:42 |
Travis Cave | ITW | Standard Operation | TM4 | Ta#42 | module move | TM#4 with Ta#42 has been moved from
the west target station to the south hot
cell. |
|
667
|
Tuesday, May 27, 2014, 11:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#42 | Electrical check | TM#4 electrical check with Ta#42 attached
post beam at the south hot cell. |
|
668
|
Wednesday, May 28, 2014, 08:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 with no target has been moved from
the south hot cell to the south west silo. |
|
669
|
Friday, May 30, 2014, 09:41 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#42 | Spent target move | Ta#42 in pail #114 has been moved from
the south hot cell to the spent target storage
vault and place in spot 7B. The target was |
|
670
|
Monday, June 02, 2014, 10:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 with no target has been moved from
the north west silo to the south hot cell. |
|
671
|
Monday, June 02, 2014, 11:25 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx #9 | UCx #9 Installed | UCx #9 has been installed. |
|
672
|
Monday, June 02, 2014, 11:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | Electrical check | TM#1 with UC#9 electrical check see attached
pdf for details. |
|
673
|
Monday, June 02, 2014, 11:59 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 HS water line with new UC9# target installed | Chad and I leak checked TM1 HS and UC9#
VCR fittings. No response had been found
on leak detector during the test. I will |
|
674
|
Monday, June 02, 2014, 13:53 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UC#9 | module move | TM#1 with UC#9 has been moved from the
south hot cell to the conditioning station. |
|
675
|
Monday, June 02, 2014, 15:40 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and CS turbo pumps have been started | TM1 and CS turbo pumps have been started.
The vacuum readings are fine on all gauges. |
|
676
|
Tuesday, June 03, 2014, 09:12 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC9# | TM1 HS line helium pressure test and TM1 electrical check at CS | TM1 HS line helium pressure test and TM1
electrical check at CS under vacuum are finished.
Everything is good. See attachment |
7x |
677
|
Monday, June 09, 2014, 10:33 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC9# | Stop TM1 and CS trubo pumps and ruff pump. | The CS and TM1 is still under vacuum. They
will be vented with argon tomorrow mornig |
|
678
|
Tuesday, June 10, 2014, 07:57 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC#9 | TM1 are vented with argon and disconnected at CS. | TM1 will be moved to ITW this morning. |
|
679
|
Tuesday, June 10, 2014, 13:20 |
Travis Cave | ITW | Standard Operation | TM1 | UC#9 | module move | TM#1 with UC#9 moved from the conditioning
station to west station. |
|