  ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  406   Tuesday, July 23, 2013, 13:33 Travis CaveSouth Hot-CellStandard OperationTM4Ta#40Electrical checkResults of electrical check on Ta#40 target
on TM#4 post beam at the south hot cell
 TM#4_Ta#40_SIS_Tgt_Elec_Chk_post.PDF 
  407   Wednesday, July 24, 2013, 08:40 Travis CaveSouth Hot-CellStandard OperationTM4SiC#29Electrical checkElectrical check on TM#4 with SiC#29 has
been done. The reading of the magnet coil
and 60kV common is low at 750 ohms, normally
 TM#4_SiC#29_FEBIAD_Tgt_Elec_Chk.PDF 
  408   Wednesday, July 24, 2013, 14:40 Travis CaveConditioning StationStandard OperationTM4SiC#29module moveTM#4 with SiC#29 has been moved from the
south hot cell to the conditioning station
move went well.
  
  410   Thursday, July 25, 2013, 09:37 Travis CaveConditioning StationStandard OperationTM4SiC#29Electrical checkElectrical check of TM#4 with SiC#29 attached.
Results are pretty much the same as yesterday
for the coil to 60kV common, and anode to
 TM#4_SiC#29_FEBIAD_TgtElecChkCS_.PDF 
  413   Monday, July 29, 2013, 14:32 Travis CaveSpent Target VaultStandard Operation Ta#40Spent target moveSpent target Ta#40 has been placed into
storage. The target was placed in pail #107
and was put into slot 5A of the vault. It
 Vault_Storage_July_29_2013.pdf 
  414   Tuesday, July 30, 2013, 10:44 Travis CaveITEStandard OperationTM4SiC#29module moveTM#4 with SiC #29 has been moved from the
conditioning station to the east target station,
move went well.
  
  416   Wednesday, July 31, 2013, 11:13 Travis CaveSpent Target VaultStandard Operation  Spent target moveFive spent targets have been removed from
the storage vault and placed into the mini
storage. The target placed into the mini
 Vault_Storage_July_31_2013.pdfMini_Vault_Storage_July_31_2013.pdf 
  418   Wednesday, August 14, 2013, 11:50 Travis CaveSouth Hot-CellMaintenanceTM3 module moveTM#3 and its new source tray have been
both moved into the south hot cell.
  
  428   Tuesday, August 27, 2013, 11:54 Travis CaveSouth Hot-CellStandard OperationTM1UC#6module moveTM#1 with UCx #6 has been moved to the
south hot cell.
  
  429   Tuesday, August 27, 2013, 11:56 Travis CaveSouth Hot-CellStandard OperationTM1UC#7Electrical checkTM#1 with UCx#7 electrical check, numbers
look good, see PDF for details.
 TM#1_UC#7__TgtElecChk_SHC_.PDF 
  430   Tuesday, August 27, 2013, 14:14 Travis CaveITWStandard OperationTM1UC#7module moveTM#1 with UCx#7 has been moved from the
south hot cell to the west target station.
  
  432   Wednesday, August 28, 2013, 14:17 Travis CaveSouth Hot-CellStandard Operation UC#6Spent target moveSpent target move, UC#6 has been moved
from the south hot cell to the target storage.
The target is in pail 108 and in slot 8C
 Vault_Storage_August_28_2013.pdf 
  433   Wednesday, August 28, 2013, 14:25 Travis CaveConditioning StationStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the conditioning station to the south hot
cell. The fields observed around the containment
  
  448   Wednesday, September 11, 2013, 11:31 Travis CaveConditioning StationStandard OperationTM3no targetmodule moveTM#3 with no target has been moved to the
conditioning station from the south hot cell.
  
  451   Thursday, September 12, 2013, 09:29 Travis CaveITWStandard OperationTM4SiC#29module moveTM#4 with SiC#29 has been moved to the
south hot cell move went well.
  
  452   Thursday, September 12, 2013, 10:35 Travis CaveSouth Hot-CellStandard OperationTM4SiC#29Electrical checkTM#4 with SiC#29 post beam electrical check
in the south hot cell see PDF for details.
 TM#4SiC#29FEBIADelechkpostbeam.PDF 
  456   Thursday, September 19, 2013, 09:08 Travis CaveSouth Hot-CellStandard OperationTM3no targetwiring harnessThe wiring harness for TM#3 was made and
a continuity and megger test was done on
it and it passed, it has since been installed
  
  457   Thursday, September 19, 2013, 11:09 Travis CaveSouth Hot-CellMaintenanceTM3no targetElectrical checkElectrical check of TM#3 with no target
was performed and it failed.
  
  461   Tuesday, September 24, 2013, 08:15 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical checkElectrical check was done on TM#3 yesterday
and again the coil lines to the 60kV common
and the coil line to each other failed, as
 TM#3_elec_chk_no_target.PDF 
  464   Wednesday, September 25, 2013, 10:00 Travis CaveSouth Hot-CellStandard OperationTM3NiO#2module moveTM#3 with NiO#2 has been moved from the
south hot cell to the conditioning station.
  