ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
406
|
Tuesday, July 23, 2013, 13:33 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#40 | Electrical check |
Results of electrical check on Ta#40 target on TM#4 post beam at the south hot cell |
Attachment 1: TM#4_Ta#40_SIS_Tgt_Elec_Chk_post.PDF
|
|
407
|
Wednesday, July 24, 2013, 08:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#29 | Electrical check |
Electrical check on TM#4 with SiC#29 has been done. The reading of the magnet coil and 60kV common is low at 750 ohms, normally this infinite. Awaiting further instruction on if this is a pass or fail. See attached PDF for the rest of the details. |
Attachment 1: TM#4_SiC#29_FEBIAD_Tgt_Elec_Chk.PDF
|
|
408
|
Wednesday, July 24, 2013, 14:40 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#29 | module move |
TM#4 with SiC#29 has been moved from the south hot cell to the conditioning station move went well. |
410
|
Thursday, July 25, 2013, 09:37 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#29 | Electrical check |
Electrical check of TM#4 with SiC#29 attached. Results are pretty much the same as yesterday for the coil to 60kV common, and anode to 60kV common. See attached pdf for details. |
Attachment 1: TM#4_SiC#29_FEBIAD_TgtElecChkCS_.PDF
|
|
413
|
Monday, July 29, 2013, 14:32 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#40 | Spent target move |
Spent target Ta#40 has been placed into storage. The target was placed in pail #107 and was put into slot 5A of the vault. It had a field of 224mSv/hr upon removal from the south hot cell. See attached PDF for more details. |
Attachment 1: Vault_Storage_July_29_2013.pdf
|
|
414
|
Tuesday, July 30, 2013, 10:44 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#29 | module move |
TM#4 with SiC #29 has been moved from the conditioning station to the east target station, move went well. |
416
|
Wednesday, July 31, 2013, 11:13 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target move |
Five spent targets have been removed from the storage vault and placed into the mini storage. The target placed into the mini storage are UO#3, UC#'s 3,4,5 and SIC#23. See attached PDFs for vault details. |
Attachment 1: Vault_Storage_July_31_2013.pdf
|
|
Attachment 2: Mini_Vault_Storage_July_31_2013.pdf
|
|
418
|
Wednesday, August 14, 2013, 11:50 |
Travis Cave | South Hot-Cell | Maintenance | TM3 | | module move |
TM#3 and its new source tray have been both moved into the south hot cell. |
428
|
Tuesday, August 27, 2013, 11:54 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#6 | module move |
TM#1 with UCx #6 has been moved to the south hot cell. |
429
|
Tuesday, August 27, 2013, 11:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#7 | Electrical check |
TM#1 with UCx#7 electrical check, numbers look good, see PDF for details. |
Attachment 1: TM#1_UC#7__TgtElecChk_SHC_.PDF
|
|
430
|
Tuesday, August 27, 2013, 14:14 |
Travis Cave | ITW | Standard Operation | TM1 | UC#7 | module move |
TM#1 with UCx#7 has been moved from the south hot cell to the west target station. |
432
|
Wednesday, August 28, 2013, 14:17 |
Travis Cave | South Hot-Cell | Standard Operation | | UC#6 | Spent target move |
Spent target move, UC#6 has been moved from the south hot cell to the target storage. The target is in pail 108 and in slot 8C of the vault. See attached PDF for details. |
Attachment 1: Vault_Storage_August_28_2013.pdf
|
|
433
|
Wednesday, August 28, 2013, 14:25 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module move |
TM#3 with no target has been moved from the conditioning station to the south hot cell. The fields observed around the containment box of the module ranged from 0.80 mSv/hr to 1.8mSv/hr.. |
448
|
Wednesday, September 11, 2013, 11:31 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module move |
TM#3 with no target has been moved to the conditioning station from the south hot cell. |
451
|
Thursday, September 12, 2013, 09:29 |
Travis Cave | ITW | Standard Operation | TM4 | SiC#29 | module move |
TM#4 with SiC#29 has been moved to the south hot cell move went well. |
452
|
Thursday, September 12, 2013, 10:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#29 | Electrical check |
TM#4 with SiC#29 post beam electrical check in the south hot cell see PDF for details. |
Attachment 1: TM#4SiC#29FEBIADelechkpostbeam.PDF
|
|
456
|
Thursday, September 19, 2013, 09:08 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | wiring harness |
The wiring harness for TM#3 was made and a continuity and megger test was done on it and it passed, it has since been installed into the hot cell and placed on the module. |
457
|
Thursday, September 19, 2013, 11:09 |
Travis Cave | South Hot-Cell | Maintenance | TM3 | no target | Electrical check |
Electrical check of TM#3 with no target was performed and it failed. There is a 135M Ohm short between the coils and a 165M Ohm short between the coil and 60kV common. All other circuits passed they were infinite in value. |
461
|
Tuesday, September 24, 2013, 08:15 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical check |
Electrical check was done on TM#3 yesterday and again the coil lines to the 60kV common and the coil line to each other failed, as in they had a resistance. Everything else passed as showing an infinite value, all meggering was done at 1000V unless noted other wise. See attached PDF for details. |
Attachment 1: TM#3_elec_chk_no_target.PDF
|
|
464
|
Wednesday, September 25, 2013, 10:00 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | NiO#2 | module move |
TM#3 with NiO#2 has been moved from the south hot cell to the conditioning station. |