ID Date Authordown Category Type Module Target/Number Subject
  406   Tuesday, July 23, 2013, 13:33 Travis CaveSouth Hot-CellStandard OperationTM4Ta#40Electrical check

Results of electrical check on Ta#40 target on TM#4 post beam at the south hot cell

  407   Wednesday, July 24, 2013, 08:40 Travis CaveSouth Hot-CellStandard OperationTM4SiC#29Electrical check

Electrical check on TM#4 with SiC#29 has been done. The reading of the magnet coil and 60kV common is low at 750 ohms, normally this infinite. Awaiting further instruction on if this is a pass or fail. See attached PDF for the rest of the details.

  408   Wednesday, July 24, 2013, 14:40 Travis CaveConditioning StationStandard OperationTM4SiC#29module move

TM#4 with SiC#29 has been moved from the south hot cell to the conditioning station move went well.

  410   Thursday, July 25, 2013, 09:37 Travis CaveConditioning StationStandard OperationTM4SiC#29Electrical check

Electrical check of TM#4 with SiC#29 attached. Results are pretty much the same as yesterday for the coil to 60kV common, and anode to 60kV common. See attached pdf for details.

  413   Monday, July 29, 2013, 14:32 Travis CaveSpent Target VaultStandard Operation Ta#40Spent target move

Spent target Ta#40 has been placed into storage. The target was placed in pail #107 and was put into slot 5A of the vault. It had a field of 224mSv/hr upon removal from the south hot cell. See attached PDF for more details.

  414   Tuesday, July 30, 2013, 10:44 Travis CaveITEStandard OperationTM4SiC#29module move

TM#4 with SiC #29 has been moved from the conditioning station to the east target station, move went well.

  416   Wednesday, July 31, 2013, 11:13 Travis CaveSpent Target VaultStandard Operation  Spent target move

Five spent targets have been removed from the storage vault and placed into the mini storage. The target placed into the mini storage are UO#3, UC#'s  3,4,5 and SIC#23. See attached PDFs for vault details.

  418   Wednesday, August 14, 2013, 11:50 Travis CaveSouth Hot-CellMaintenanceTM3 module move

TM#3 and its new source tray have been both moved into the south hot cell.

  428   Tuesday, August 27, 2013, 11:54 Travis CaveSouth Hot-CellStandard OperationTM1UC#6module move

TM#1 with UCx #6 has been moved to the south hot cell.

  429   Tuesday, August 27, 2013, 11:56 Travis CaveSouth Hot-CellStandard OperationTM1UC#7Electrical check

TM#1 with UCx#7 electrical check, numbers look good, see PDF for details.

  430   Tuesday, August 27, 2013, 14:14 Travis CaveITWStandard OperationTM1UC#7module move

TM#1 with UCx#7 has been moved from the south hot cell to the west target station.

  432   Wednesday, August 28, 2013, 14:17 Travis CaveSouth Hot-CellStandard Operation UC#6Spent target move

Spent target move, UC#6 has been moved from the south hot cell to the target storage. The target is in pail 108 and in slot 8C of the vault. See attached PDF for details.

  433   Wednesday, August 28, 2013, 14:25 Travis CaveConditioning StationStandard OperationTM3no targetmodule move

TM#3 with no target has been moved from the conditioning station to the south hot cell. The fields observed around the containment box of the module ranged from 0.80 mSv/hr to 1.8mSv/hr..

  448   Wednesday, September 11, 2013, 11:31 Travis CaveConditioning StationStandard OperationTM3no targetmodule move

TM#3 with no target has been moved to the conditioning station from the south hot cell.

  451   Thursday, September 12, 2013, 09:29 Travis CaveITWStandard OperationTM4SiC#29module move

TM#4 with SiC#29 has been moved to the south hot cell move went well.

  452   Thursday, September 12, 2013, 10:35 Travis CaveSouth Hot-CellStandard OperationTM4SiC#29Electrical check

TM#4 with SiC#29 post beam electrical check in the south hot cell see PDF for details.

  456   Thursday, September 19, 2013, 09:08 Travis CaveSouth Hot-CellStandard OperationTM3no targetwiring harness

The wiring harness for TM#3 was made and a continuity and megger test was done on it and it passed, it has since been installed into the hot cell and placed on the module.

  457   Thursday, September 19, 2013, 11:09 Travis CaveSouth Hot-CellMaintenanceTM3no targetElectrical check

Electrical check of TM#3 with no target was performed and it failed. There is a 135M Ohm short between the coils and a 165M Ohm short between the coil and 60kV common.  All other circuits passed they were infinite in value.

  461   Tuesday, September 24, 2013, 08:15 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical check

Electrical check was done on TM#3 yesterday and again the coil lines to the 60kV common and the coil line to each other failed, as in they had a resistance. Everything else passed as showing an infinite value, all meggering was done at 1000V unless noted other wise. See attached PDF for details.

  464   Wednesday, September 25, 2013, 10:00 Travis CaveSouth Hot-CellStandard OperationTM3NiO#2module move

TM#3 with NiO#2 has been moved from the south hot cell to the conditioning station.