ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
|
524
|
Thursday, October 24, 2013, 11:32 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 with no target has been moved from
the conditioning station to the south hot
cell. |
|
|
525
|
Thursday, October 24, 2013, 15:43 |
Anders Mjos | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Target conductance | The conductance check on the electrical
check was found to be outside of accepted
values for the TBHT at 7.0 mOhm. A successful |
|
|
526
|
Thursday, October 24, 2013, 15:54 |
Grant Minor | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Target conductance |
|
|
|
527
|
Friday, October 25, 2013, 06:58 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Leak check on TM4 target heat shield | Maico and I leak checked HS circuit after
Chad installed the target. The circuit was
a little bit difficult o pump down because |
|
|
530
|
Friday, October 25, 2013, 14:09 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Target conductance |
|
|
|
533
|
Friday, November 01, 2013, 09:08 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module move | TM#2 has been moved from the north west
silo to the south hot cell. The module has
a field of about 3.1mSv/hr when it was lowered |
|
|
534
|
Monday, November 04, 2013, 10:46 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Exploration | TM2 is now in the hot cell with the containment
box off for inspection and eventual blank
off off the water blocks. |
|
|
535
|
Tuesday, November 05, 2013, 10:37 |
chad fisher | South Hot-Cell | Repair | TM2 | | Thermocouple wire removal | The old thermocouple wire has been sucessfully
removed from the module.
Thanks Bevan, Travis and David. |
|
|
536
|
Wednesday, November 06, 2013, 10:41 |
David Wang | South Hot-Cell | Repair | TM2 | | Installed 2 turbopumps on TM2 | Bevan and I installed 2 turbo pumps on
TM2. The o- ring flanges on TM2 had been
cleaned before the installation. |
|
|
538
|
Tuesday, November 12, 2013, 10:59 |
Bevan Moss | South Hot-Cell | Standard Operation | TM2 | | Electrical Test | Don Jackson and Myself completed
started an electrical test on TM2. All lines
passed the with OL to ground. When testing |
|
|
543
|
Thursday, November 14, 2013, 08:08 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Blank off and jig removal | Firday, November 8 all water blocks (excluding
I and K) were blanked off and vacuum leak
checked. No responses were found. (First |
|
|
548
|
Tuesday, November 19, 2013, 10:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | NiO#2 | module move | TM#3 with NiO#2 moved from ITE to the south
hot cell. |
|
|
551
|
Wednesday, November 20, 2013, 08:50 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | NiO#2 | NiO#2 removed | NiO#2 has been removed from TM3 |
|
|
552
|
Wednesday, November 20, 2013, 09:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move | TM#3 with no target has been moved from
the south hot cell to the north east silo. |
|
|
554
|
Thursday, November 21, 2013, 12:12 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | NiO#2 | End of beam target inspection - ANODE does not hold 250V | The target was inspected by Chad and Anders
in the Hot Cell. Electrical megger tests
were done during the assembly. It was found |
|
|
556
|
Monday, November 25, 2013, 11:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move | TM#3 with no target has been moved from
the north east silo to the south hot cell. |
|
|
558
|
Wednesday, November 27, 2013, 12:50 |
Bevan Moss | South Hot-Cell | Standard Operation | TM3 | | Ground devices wiring check | Travis and I completed an electrical
check on the wiring harness for the devices
on the ground plane. All lines passed 500V |
|
|
559
|
Wednesday, November 27, 2013, 15:24 |
Bevan Moss | South Hot-Cell | Maintenance | TM3 | | Wiring Harness Electrical Test | Maico removed the containment box
today allow Travis and I to further test
the wiring harness. I disconnected the junction |
|
|
560
|
Friday, November 29, 2013, 11:54 |
chad fisher | South Hot-Cell | Repair | TM3 | | Steerer short investegation | Using in cell camera and transit the suspect
line on the steerers was inspected as best
as possible. An existing photo of the complete |
|
|
561
|
Friday, November 29, 2013, 11:57 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Steerer short investegation |
|
|