  ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  2059   Wednesday, February 05, 2020, 08:22 chad fisherSouth Hot-CellStandard OperationTM4UCx#29UCx#29 removedUCx#29 has been removed from TM$ and placed
in a pail backfilled with argon until it
can be moved to the storage vault.
  
  2012   Wednesday, October 23, 2019, 07:58 chad fisherSouth Hot-CellStandard OperationTM4UCx#28UCx#28 RemovedUCx#28 has been removed from TM4. Guard
screws on 5(10) pin connector had to be removed
to get the connector to un-seat properly
  
  1976   Thursday, September 05, 2019, 11:37 chad fisherSouth Hot-CellStandard OperationTM4UCx#27UCx#27 installDummy Ta target has been removed from TM4
and UCx#27 installed
  
  1469   Tuesday, March 28, 2017, 10:44 chad fisherSouth Hot-CellStandard OperationTM4UCx#19UCx#19 InstalledUCx#19 has been installed onto TM4. High
current fasteners torqued to 130 in lbs.
Has been leak and electrical checked and
  
  1430   Friday, January 27, 2017, 08:50 chad fisherSouth Hot-CellStandard Operation  UCx#18 and Ta#50 autopsy and spent target moveOn Thursday, January 26th UCx#18 and Ta#50
were inspected and packaged into spent target
pails, move to storage vault.
  
  1195   Wednesday, April 06, 2016, 14:03 chad fisherSouth Hot-CellStandard OperationTM4Ta#47UCx#14 removed Ta#47 installedUCx#14 has been removed from TM4 and Ta#47
installed. No marks on 9 pin connector on
UCx#14.
  
  1135   Wednesday, November 25, 2015, 14:13 chad fisherSouth Hot-CellStandard OperationTM4UC#14UCx#14UCx#14 installed onto TM4. High current
fasteners torqued to 130 in lbs.
  
  2062   Wednesday, February 05, 2020, 11:03 David WangSouth Hot-CellStandard OperationTM4UCx 29UCx 29 post run electrical checkUCx 29 TM4 post run electrical check is
done before target is removed. Everything
is normal on measurements.
 UCx29_post_run_electrical_check..pdf 
  2018   Wednesday, October 30, 2019, 11:18 David WangITWStandard OperationTM4UCx 29UCx 29 connection checklistSee attachment  UCx_29_connection_checklist.pdf 
  2001   Friday, October 04, 2019, 16:50 David WangSouth Hot-CellStandard OperationTM4 UCx 28 target with TM4 SHC leak check and electrical check. TM4 HS Leak check result is good . No leak.
electrical check after target installation:
Bias to chassis 550 Mohm. Coils are shorted
  
  671   Monday, June 02, 2014, 11:25 chad fisherSouth Hot-CellStandard OperationTM1UCx #9UCx #9 InstalledUCx #9 has been installed.   
  2310   Tuesday, March 01, 2022, 11:51 David WangSpent Target VaultMaintenance  UCx #32 has been repacked in NHC. UCx 32# P2N target in vault slot 1B is
repacked is morning for Ferran to  take out
his samples( in two small plastic containers)
  
  20   Thursday, August 18, 2011, 13:12 chad fisherSouth Hot-CellStandard OperationTM1UCx #2UCx #2 InstallationUCx #2 has been installed onto TM1.
Installation went well except the
left leg got bent slightly sometime between
  
  1428   Friday, January 27, 2017, 08:44 chad fisherSouth Hot-CellStandard OperationTM2Ta#50UCx #18 - Ta Feibiad Dummy installed. Target Change Waterline interferenceOn Tuesday, January 24th UCx#18 was removed
from TM2 and Ta febiad dummy installed. I
encountered the same issue mounting the new
 TM2_Waterline_interference.jpg 
  970   Tuesday, June 30, 2015, 12:37 chad fisherSouth Hot-CellStandard OperationTM1UCx#12UCx #12 RemovalUCx#12 has been removed from TM1 and placed
in a pail with argon.
Right leg (B) of target is clearly
  
  2238   Wednesday, August 04, 2021, 17:24 David WangNorth Hot-CellStandard OperationTM2UCx34#UCX 34# on TM2 electical check and HS leak check at NHC.The job is done with Matt at NHC. All TGHT
and TBHT bolts are torque wrench tight in
NHC. HS leak check result is good.
 UCX34_TM2_electrical_check.pdf 
  2723   Tuesday, November 26, 2024, 14:52 Aaron TamSouth Hot-CellStandard OperationTM3UCx#47 UC#47 LP-SIS w/ gas Install November 26, 2024 - Aaron Tam 
Handover from TPO and inspection

    Completed
    Some
 6x 
  74   Monday, March 12, 2012, 10:03 chad fisherSouth Hot-CellStandard OperationTM1UC#3UC#3 RemovalUC#3 was removed from TM1 this morning.
Upon removing the oven heater bolts BOTH
legs fell demonstrating that both sides of
 IMG_0610.JPGIMG_0616.JPG 
  2063   Thursday, February 06, 2020, 13:31 Adam NewsomeSpent Target VaultStandard Operation UC#29UC#29 moved to vault location 6A, in pail 225 UC#29 in pail 225 was moved to the
storage vault, location 6A. Field measured
at 22.4 mSv/hr at ~1m. 
  
  1913   Wednesday, May 01, 2019, 07:49 chad fisherSouth Hot-CellStandard OperationTM4UC#26UC#26 removalUC#26 has been removed from TM4.  20190501_072940[1].jpg 