2059
|
Wednesday, February 05, 2020, 08:22 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#29 | UCx#29 removed | UCx#29 has been removed from TM$ and placed
in a pail backfilled with argon until it
can be moved to the storage vault. |
|
2012
|
Wednesday, October 23, 2019, 07:58 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#28 | UCx#28 Removed | UCx#28 has been removed from TM4. Guard
screws on 5(10) pin connector had to be removed
to get the connector to un-seat properly |
|
1976
|
Thursday, September 05, 2019, 11:37 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#27 | UCx#27 install | Dummy Ta target has been removed from TM4
and UCx#27 installed |
|
1469
|
Tuesday, March 28, 2017, 10:44 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#19 | UCx#19 Installed | UCx#19 has been installed onto TM4. High
current fasteners torqued to 130 in lbs.
Has been leak and electrical checked and |
|
1430
|
Friday, January 27, 2017, 08:50 |
chad fisher | South Hot-Cell | Standard Operation | | | UCx#18 and Ta#50 autopsy and spent target move | On Thursday, January 26th UCx#18 and Ta#50
were inspected and packaged into spent target
pails, move to storage vault. |
|
1195
|
Wednesday, April 06, 2016, 14:03 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#47 | UCx#14 removed Ta#47 installed | UCx#14 has been removed from TM4 and Ta#47
installed. No marks on 9 pin connector on
UCx#14. |
|
1135
|
Wednesday, November 25, 2015, 14:13 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UC#14 | UCx#14 | UCx#14 installed onto TM4. High current
fasteners torqued to 130 in lbs. |
|
2062
|
Wednesday, February 05, 2020, 11:03 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx 29 | UCx 29 post run electrical check | UCx 29 TM4 post run electrical check is
done before target is removed. Everything
is normal on measurements. |
|
2018
|
Wednesday, October 30, 2019, 11:18 |
David Wang | ITW | Standard Operation | TM4 | UCx 29 | UCx 29 connection checklist | See attachment |
|
2001
|
Friday, October 04, 2019, 16:50 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | UCx 28 target with TM4 SHC leak check and electrical check. | TM4 HS Leak check result is good . No leak.
electrical check after target installation:
Bias to chassis 550 Mohm. Coils are shorted |
|
671
|
Monday, June 02, 2014, 11:25 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx #9 | UCx #9 Installed | UCx #9 has been installed. |
|
2310
|
Tuesday, March 01, 2022, 11:51 |
David Wang | Spent Target Vault | Maintenance | | | UCx #32 has been repacked in NHC. | UCx 32# P2N target in vault slot 1B is
repacked is morning for Ferran to take out
his samples( in two small plastic containers) |
|
20
|
Thursday, August 18, 2011, 13:12 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx #2 | UCx #2 Installation | UCx #2 has been installed onto TM1.
Installation went well except the
left leg got bent slightly sometime between |
|
1428
|
Friday, January 27, 2017, 08:44 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | Ta#50 | UCx #18 - Ta Feibiad Dummy installed. Target Change Waterline interference | On Tuesday, January 24th UCx#18 was removed
from TM2 and Ta febiad dummy installed. I
encountered the same issue mounting the new |
|
970
|
Tuesday, June 30, 2015, 12:37 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#12 | UCx #12 Removal | UCx#12 has been removed from TM1 and placed
in a pail with argon.
Right leg (B) of target is clearly |
|
2238
|
Wednesday, August 04, 2021, 17:24 |
David Wang | North Hot-Cell | Standard Operation | TM2 | UCx34# | UCX 34# on TM2 electical check and HS leak check at NHC. | The job is done with Matt at NHC. All TGHT
and TBHT bolts are torque wrench tight in
NHC. HS leak check result is good. |
|
2723
|
Tuesday, November 26, 2024, 14:52 |
Aaron Tam | South Hot-Cell | Standard Operation | TM3 | UCx#47 | UC#47 LP-SIS w/ gas Install | November 26, 2024 - Aaron Tam
Handover from TPO and inspection
Completed
Some |
6x |
74
|
Monday, March 12, 2012, 10:03 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UC#3 | UC#3 Removal | UC#3 was removed from TM1 this morning.
Upon removing the oven heater bolts BOTH
legs fell demonstrating that both sides of |
|
2063
|
Thursday, February 06, 2020, 13:31 |
Adam Newsome | Spent Target Vault | Standard Operation | | UC#29 | UC#29 moved to vault location 6A, in pail 225 | UC#29 in pail 225 was moved to the
storage vault, location 6A. Field measured
at 22.4 mSv/hr at ~1m. |
|
1913
|
Wednesday, May 01, 2019, 07:49 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UC#26 | UC#26 removal | UC#26 has been removed from TM4. |
|