ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  2323   Thursday, May 19, 2022, 15:05 Frank SongITEStandard OperationTM4UCx#37UCx#37 P2N connection on TM4 TM4 with UCx#37 was connected in
ITE. Attachment available.
 01_UCx37_P2N_connection_on_TM4.jpg02_UCx37_P2N_connection_on_TM4.jpg03_UCx37_P2N_connection_on_TM4.jpg 
  2117   Friday, July 03, 2020, 08:46 chad fisherSouth Hot-CellStandard OperationTM4UcX#30UCx#30 installed onto tm4UCx#30 has been installed onto TM4 with
new high current fasteners torqued to 130
in lbs.
  
  77   Tuesday, March 13, 2012, 09:43 chad fisherSouth Hot-CellStandard OperationTM1UCx#3UCx#3 to spent vaultUCx#3 was packaged into a spent can, double
bagged and the bag and cans filled with argon
as much as possible. Lid was attached and
 Vault_Storage_March_13_2012.pdf 
  57   Friday, November 18, 2011, 09:56 chad fisherSouth Hot-CellStandard OperationTM1UCx#3UCx#3 InstallationUCx#3 has been installed on TM1.
Leak check also complete.
Base Leak Rate 0.0 x 10-9
  
  76   Tuesday, March 13, 2012, 09:42 chad fisherSouth Hot-CellStandard OperationTM1UCx#3UCx#3 AutopsyAn autopsy was performed on UCx#3 yesterday
afternoon. This autopsy followed the plan
written by Anders. Indeed, both sides of
  
  78   Tuesday, March 13, 2012, 12:24 Anders MjosSouth Hot-CellStandard OperationTM1UCx#3UCx#3 Autopsy

    

       
            
 Inspection_of_UCx#3_in_the_South_Hot_Cell.docx 
  2059   Wednesday, February 05, 2020, 08:22 chad fisherSouth Hot-CellStandard OperationTM4UCx#29UCx#29 removedUCx#29 has been removed from TM$ and placed
in a pail backfilled with argon until it
can be moved to the storage vault.
  
  2012   Wednesday, October 23, 2019, 07:58 chad fisherSouth Hot-CellStandard OperationTM4UCx#28UCx#28 RemovedUCx#28 has been removed from TM4. Guard
screws on 5(10) pin connector had to be removed
to get the connector to un-seat properly
  
  1976   Thursday, September 05, 2019, 11:37 chad fisherSouth Hot-CellStandard OperationTM4UCx#27UCx#27 installDummy Ta target has been removed from TM4
and UCx#27 installed
  
  1469   Tuesday, March 28, 2017, 10:44 chad fisherSouth Hot-CellStandard OperationTM4UCx#19UCx#19 InstalledUCx#19 has been installed onto TM4. High
current fasteners torqued to 130 in lbs.
Has been leak and electrical checked and
  
  1430   Friday, January 27, 2017, 08:50 chad fisherSouth Hot-CellStandard Operation  UCx#18 and Ta#50 autopsy and spent target moveOn Thursday, January 26th UCx#18 and Ta#50
were inspected and packaged into spent target
pails, move to storage vault.
  
  1195   Wednesday, April 06, 2016, 14:03 chad fisherSouth Hot-CellStandard OperationTM4Ta#47UCx#14 removed Ta#47 installedUCx#14 has been removed from TM4 and Ta#47
installed. No marks on 9 pin connector on
UCx#14.
  
  1135   Wednesday, November 25, 2015, 14:13 chad fisherSouth Hot-CellStandard OperationTM4UC#14UCx#14UCx#14 installed onto TM4. High current
fasteners torqued to 130 in lbs.
  
  2062   Wednesday, February 05, 2020, 11:03 David WangSouth Hot-CellStandard OperationTM4UCx 29UCx 29 post run electrical checkUCx 29 TM4 post run electrical check is
done before target is removed. Everything
is normal on measurements.
 UCx29_post_run_electrical_check..pdf 
  2018   Wednesday, October 30, 2019, 11:18 David WangITWStandard OperationTM4UCx 29UCx 29 connection checklistSee attachment  UCx_29_connection_checklist.pdf 
  2001   Friday, October 04, 2019, 16:50 David WangSouth Hot-CellStandard OperationTM4 UCx 28 target with TM4 SHC leak check and electrical check. TM4 HS Leak check result is good . No leak.
electrical check after target installation:
Bias to chassis 550 Mohm. Coils are shorted
  
  671   Monday, June 02, 2014, 11:25 chad fisherSouth Hot-CellStandard OperationTM1UCx #9UCx #9 InstalledUCx #9 has been installed.   
  2310   Tuesday, March 01, 2022, 11:51 David WangSpent Target VaultMaintenance  UCx #32 has been repacked in NHC. UCx 32# P2N target in vault slot 1B is
repacked is morning for Ferran to  take out
his samples( in two small plastic containers)
  
  20   Thursday, August 18, 2011, 13:12 chad fisherSouth Hot-CellStandard OperationTM1UCx #2UCx #2 InstallationUCx #2 has been installed onto TM1.
Installation went well except the
left leg got bent slightly sometime between
  
  1428   Friday, January 27, 2017, 08:44 chad fisherSouth Hot-CellStandard OperationTM2Ta#50UCx #18 - Ta Feibiad Dummy installed. Target Change Waterline interferenceOn Tuesday, January 24th UCx#18 was removed
from TM2 and Ta febiad dummy installed. I
encountered the same issue mounting the new
 TM2_Waterline_interference.jpg 