Entry  Tuesday, July 31, 2012, 12:24, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx#4, UCx#4 Installed 
Starting at 11:00 am and finishing at 12:10 Ucx#4 previous target was removed and UCx#4 installed and leak checked on TM1.
During module move to the hot cell UCx#4 was housed in a bag under argon.
Entry  Thursday, May 19, 2022, 15:05, Frank Song, ITE, Standard Operation, TM4, UCx#37, UCx#37 P2N connection on TM4 01_UCx37_P2N_connection_on_TM4.jpg02_UCx37_P2N_connection_on_TM4.jpg03_UCx37_P2N_connection_on_TM4.jpg
 TM4 with UCx#37 was connected in ITE. Attachment available.
Entry  Friday, July 03, 2020, 08:46, chad fisher, South Hot-Cell, Standard Operation, TM4, UcX#30, UCx#30 installed onto tm4 
UCx#30 has been installed onto TM4 with new high current fasteners torqued to 130 in lbs.
Entry  Tuesday, March 13, 2012, 09:43, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx#3, UCx#3 to spent vault Vault_Storage_March_13_2012.pdf
UCx#3 was packaged into a spent can, double bagged and the bag and cans filled with argon as much as possible. Lid was attached and can moved to the
storage vault. The target was placed in in Pail 93, and placed into slot 1C of the vault, it was 11.7mSv/hr when removed from the south hot cell. See attached
file for latest vault details
Entry  Friday, November 18, 2011, 09:56, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx#3, UCx#3 Installation 
UCx#3 has been installed on TM1.
Leak check also complete.
Base Leak Rate 0.0 x 10-9
Entry  Tuesday, March 13, 2012, 09:42, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx#3, UCx#3 Autopsy 
An autopsy was performed on UCx#3 yesterday afternoon. This autopsy followed the plan written by Anders. Indeed, both sides of the target oven had seperated
from the central block.Pictures were taken by Anders and Pierre.
After the disection the target was placed back in a can under argon. Any small piece were placed in a zip lock bag and also put in the can under
    Reply  Tuesday, March 13, 2012, 12:24, Anders Mjos, South Hot-Cell, Standard Operation, TM1, UCx#3, UCx#3 Autopsy Inspection_of_UCx#3_in_the_South_Hot_Cell.docx


    
        
            chad fisher wrote:
        
        
            
            An autopsy was performed on UCx#3 yesterday afternoon. This autopsy followed the plan written by Anders.
Entry  Wednesday, February 05, 2020, 08:22, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#29, UCx#29 removed 
UCx#29 has been removed from TM$ and placed in a pail backfilled with argon until it can be moved to the storage vault.
Entry  Wednesday, October 23, 2019, 07:58, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#28, UCx#28 Removed 
UCx#28 has been removed from TM4. Guard screws on 5(10) pin connector had to be removed to get the connector to un-seat properly for removal.
Entry  Thursday, September 05, 2019, 11:37, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#27, UCx#27 install 
Dummy Ta target has been removed from TM4 and UCx#27 installed
Entry  Tuesday, March 28, 2017, 10:44, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#19, UCx#19 Installed 
UCx#19 has been installed onto TM4. High current fasteners torqued to 130 in lbs. Has been leak and electrical checked and is ready to leave hot cell.
Entry  Friday, January 27, 2017, 08:50, chad fisher, South Hot-Cell, Standard Operation, , , UCx#18 and Ta#50 autopsy and spent target move 
On Thursday, January 26th UCx#18 and Ta#50 were inspected and packaged into spent target pails, move to storage vault.
Entry  Wednesday, April 06, 2016, 14:03, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#47, UCx#14 removed Ta#47 installed 
UCx#14 has been removed from TM4 and Ta#47 installed. No marks on 9 pin connector on UCx#14.
Entry  Wednesday, November 25, 2015, 14:13, chad fisher, South Hot-Cell, Standard Operation, TM4, UC#14, UCx#14 
UCx#14 installed onto TM4. High current fasteners torqued to 130 in lbs.
Entry  Wednesday, February 05, 2020, 11:03, David Wang, South Hot-Cell, Standard Operation, TM4, UCx 29, UCx 29 post run electrical check UCx29_post_run_electrical_check..pdf
UCx 29 TM4 post run electrical check is done before target is removed. Everything is normal on measurements.
Entry  Wednesday, October 30, 2019, 11:18, David Wang, ITW, Standard Operation, TM4, UCx 29, UCx 29 connection checklist UCx_29_connection_checklist.pdf
See attachment
Entry  Friday, October 04, 2019, 16:50, David Wang, South Hot-Cell, Standard Operation, TM4, , UCx 28 target with TM4 SHC leak check and electrical check.  
TM4 HS Leak check result is good . No leak. electrical check after target installation: Bias to chassis 550 Mohm. Coils are shorted each other and shorted
to 60 KV bias. ABCD to 60KV bias 500V Megga measurement are 100M at least which is good. EE to bias are OL at 500V. The electrical check result is good.
Entry  Monday, June 02, 2014, 11:25, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx #9, UCx #9 Installed 
UCx #9 has been installed.
Entry  Tuesday, March 01, 2022, 11:51, David Wang, Spent Target Vault, Maintenance, , , UCx #32 has been repacked in NHC.  
UCx 32# P2N target in vault slot 1B is repacked is morning for Ferran to  take out his samples( in two small plastic containers) stored in pail  last
July when Chad did the spent target job. The job went well.  Old  pail # is 254# and new pail # is 233. It is put back to 1B in vault.
Entry  Thursday, August 18, 2011, 13:12, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx #2, UCx #2 Installation 
UCx #2 has been installed onto TM1.
Installation went well except the left leg got bent slightly sometime between testing on the jig and installation onto the module (probably
during removal for the argon filled bag). Leg was gentle offered into place and its clearance with the heat shield double checked with both a mirror