1752
|
Wednesday, July 11, 2018, 15:09 |
Anders Mjos | ITW | Maintenance | TM2 | Nb#8 | Uncovered ITW to toubleshoot 2A2M19 | The 2A2M19 beam profile monitor did not
work and was e-faulted.
After initial troubleshooting 2 blocks were |
|
752
|
Tuesday, September 23, 2014, 12:24 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#44 | Ucx10 removed Ta#44 installed | Ucx#10 has been removed from TM4 and placed
in a pail with argon.
Ta#44 has been installed onto TM4 |
|
388
|
Thursday, June 27, 2013, 14:21 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ucx#6 | Ucx#6 installed Ta#39? rewmoved | Ucx#6 was installed on TM1 on Wednesday.
Ta#39 was removed. |
|
2146
|
Wednesday, September 23, 2020, 10:56 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UC#31 P2N | Uc#30 removed UC#31 P2N installed | UCx#30 has been removed from TM#4 and put
in a can with argon. 5(10) pin connector
had to have guide screws removed to be uninstalled. |
|
170
|
Wednesday, September 05, 2012, 14:36 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | NiO #1 | UOx removal NiO installation | UOx was removed from TM4 yesterday and
NiO#1 installed.
Video was taken. |
|
1018
|
Monday, July 27, 2015, 17:03 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx 13 | UCx13 and TM4 under vacuum at CS. | I connected the CS vacuum system
to TM4. The CS and TM4 turbo pumps are started.
Everything is good so far. The HS line will |
|
704
|
Wednesday, July 16, 2014, 13:56 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#9 | UCx#9 off Ta on | The UCx#9 target has been revomed from
the target module...leg A was broken as suspected.
Ta#42 has been installed. High current |
|
221
|
Tuesday, December 04, 2012, 14:20 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#5 | UCx#5 Removal | UCx #5 has been removed from TM4. The left
oven leg is indeed broken.
Target has been placed in a pail |
|
2743
|
Wednesday, January 08, 2025, 07:37 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#46 | UCx#46 removal | UCx#46 removed from TM4 and placed into
a pail back-filled with argon. Nothing visually
unusual; no issues. |
|
2715
|
Friday, November 08, 2024, 10:44 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | UCx#46 | UCx#46 Install and Parasitic Target Status | November 6, 2024 - Aaron Tam
UCx#46 Target handover from
TPO |
|
2599
|
Friday, May 24, 2024, 08:10 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#45 | UCx#45 Installation | On Wednesday, May 22, 2024 UCx#45 was installed
on TM4 in the SHC. Installation was normal
other then minor issue with the multipin |
|
2519
|
Wednesday, January 10, 2024, 16:51 |
Carla Babcock | ITE | Standard Operation | TM4 | UCx#43 | UCx#43 failure | To deliver stable beam to RadMol,
started heating UCx#43 up again. Target was
overheated during initial conditioning in |
|
2536
|
Friday, January 26, 2024, 16:48 |
Carla Babcock | South Hot-Cell | Standard Operation | TM4 | UC43 | UCx#43 PIE | UCx#43 PIE was done in the SHC. As expected
based on electrical measurements, the target
container was broken on the right side and |
|
153
|
Tuesday, July 31, 2012, 12:24 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#4 | UCx#4 Installed | Starting at 11:00 am and finishing at 12:10
Ucx#4 previous target was removed and UCx#4
installed and leak checked on TM1. |
|
2323
|
Thursday, May 19, 2022, 15:05 |
Frank Song | ITE | Standard Operation | TM4 | UCx#37 | UCx#37 P2N connection on TM4 | TM4 with UCx#37 was connected in
ITE. Attachment available. |
|
2117
|
Friday, July 03, 2020, 08:46 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UcX#30 | UCx#30 installed onto tm4 | UCx#30 has been installed onto TM4 with
new high current fasteners torqued to 130
in lbs. |
|
77
|
Tuesday, March 13, 2012, 09:43 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#3 | UCx#3 to spent vault | UCx#3 was packaged into a spent can, double
bagged and the bag and cans filled with argon
as much as possible. Lid was attached and |
|
57
|
Friday, November 18, 2011, 09:56 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#3 | UCx#3 Installation | UCx#3 has been installed on TM1.
Leak check also complete.
Base Leak Rate 0.0 x 10-9 |
|
76
|
Tuesday, March 13, 2012, 09:42 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#3 | UCx#3 Autopsy | An autopsy was performed on UCx#3 yesterday
afternoon. This autopsy followed the plan
written by Anders. Indeed, both sides of |
|
78
|
Tuesday, March 13, 2012, 12:24 |
Anders Mjos | South Hot-Cell | Standard Operation | TM1 | UCx#3 | UCx#3 Autopsy |
|
|