ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  481   Monday, September 30, 2013, 16:02 Bevan MossConditioning StationStandard OperationTM3NiO#2Vacuum The roughing pump for TCS was started
at ~3:00 and the turbo's turned on at ~4:00.
This is the minimum time for the module to
  
  1279   Friday, July 08, 2016, 16:56 Anders MjosConditioning StationRepair  VFD21 OL1 fault on ChillerPlant Services group (Tony) will contact
a service tech on Monday.
Water system will be switched off
  
  1286   Thursday, July 14, 2016, 13:25 Anders MjosConditioning StationRepair  VFD21 OL1 fault on Chiller

    

       
            
  
  1323   Thursday, August 18, 2016, 10:35 Anders MjosConditioning StationRepair  VFD21 OL1 fault on Chiller

    

       
            
  
  238   Friday, January 18, 2013, 16:56 Grant MinorConditioning StationStandard OperationTM4 VAT valve btwn roughing and nuc. vent. closedBevan attempted to start pumping down on
TM4 today remotely but there was an issue. 
He will report on Monday.
  
  1561   Monday, June 19, 2017, 07:29 David WangConditioning StationStandard OperationTM2 Update TH MS project schedule.Update TH MS project schedule. See attachment
1,2. 
 Target_Hall_shedule_132_Apr_to_Sep.pdfTarget_Hall_shedule_132_Apr_to_Sep.mpp 
  1433   Friday, February 03, 2017, 11:49 David WangConditioning StationStandard Operation  Update 2017 winter shutdown TH schedule.Update 2017 winter shut down target hall
schedule. See attachments
 2017_Winter_Shut_Down_Target_Hall_Schedule.mpp2017_Winter_Shut_Down_Target_Hall_Schedule.pdf 
  1752   Wednesday, July 11, 2018, 15:09 Anders MjosITWMaintenanceTM2Nb#8Uncovered ITW to toubleshoot 2A2M19The 2A2M19 beam profile monitor did not
work and was e-faulted.
After initial troubleshooting 2 blocks were
  
  752   Tuesday, September 23, 2014, 12:24 chad fisherSouth Hot-CellStandard OperationTM4Ta#44Ucx10 removed Ta#44 installedUcx#10 has been removed from TM4 and placed
in a pail with argon.
Ta#44 has been installed onto TM4
  
  388   Thursday, June 27, 2013, 14:21 chad fisherSouth Hot-CellStandard OperationTM1Ucx#6Ucx#6 installed Ta#39? rewmovedUcx#6 was installed on TM1 on Wednesday.
Ta#39 was removed.
  
  2146   Wednesday, September 23, 2020, 10:56 chad fisherSouth Hot-CellStandard OperationTM4UC#31 P2NUc#30 removed UC#31 P2N installedUCx#30 has been removed from TM#4 and put
in a can with argon. 5(10) pin connector
had to have guide screws removed to be uninstalled.
  
  170   Wednesday, September 05, 2012, 14:36 chad fisherSouth Hot-CellStandard OperationTM4NiO #1UOx removal NiO installationUOx was removed from TM4 yesterday and
NiO#1 installed.
Video was taken.
  
  1018   Monday, July 27, 2015, 17:03 David WangConditioning StationStandard OperationTM4UCx 13UCx13 and TM4 under vacuum at CS.I connected the CS  vacuum system 
to TM4. The CS and TM4 turbo pumps are started.
Everything is good so far. The HS line will
  
  704   Wednesday, July 16, 2014, 13:56 chad fisherSouth Hot-CellStandard OperationTM1UCx#9UCx#9 off Ta onThe UCx#9 target has been revomed from
the target module...leg A was broken as suspected.
Ta#42 has been installed. High current
  
  221   Tuesday, December 04, 2012, 14:20 chad fisherSouth Hot-CellStandard OperationTM4UCx#5UCx#5 RemovalUCx #5 has been removed from TM4. The left
oven leg is indeed broken.
Target has been placed in a pail
  
  2743   Wednesday, January 08, 2025, 07:37 chad fisherSouth Hot-CellStandard OperationTM4UCx#46UCx#46 removalUCx#46 removed from TM4 and placed into
a pail back-filled with argon. Nothing visually
unusual; no issues.
 TM4_UCx46_07012024.jpegTM4_UCx46_2_07012024.jpeg 
  2715   Friday, November 08, 2024, 10:44 Aaron TamSouth Hot-CellStandard OperationTM4UCx#46UCx#46 Install and Parasitic Target Status November 6, 2024 - Aaron Tam 
UCx#46 Target handover from
TPO 
 Left_side_Array_Parasitic_with_floppy_spacer.jfifRight_side_Window_Parasitic.jfifLid_Parasitics_order.jfif 
  2599   Friday, May 24, 2024, 08:10 chad fisherSouth Hot-CellStandard OperationTM4UCx#45UCx#45 InstallationOn Wednesday, May 22, 2024 UCx#45 was installed
on TM4 in the SHC. Installation was normal
other then minor issue with the multipin
  
  2519   Wednesday, January 10, 2024, 16:51 Carla BabcockITEStandard OperationTM4UCx#43UCx#43 failure To deliver stable beam to RadMol,
started heating UCx#43 up again. Target was
overheated during initial conditioning in
  
  2536   Friday, January 26, 2024, 16:48 Carla BabcockSouth Hot-CellStandard OperationTM4UC43UCx#43 PIEUCx#43 PIE was done in the SHC. As expected
based on electrical measurements, the target
container was broken on the right side and
  