  113   Friday, May 25, 2012, 10:48 Travis CaveSpent Target VaultStandard Operation  Moving the spent targets to mini storage.Five targets were moved to the mini storage
today in preparation for transfer of the
targets to the F308s later next week. The
 Mini_Vault_Storage_May_25_2012.pdfVault_Storage_May_25_2012.pdf 
  124   Monday, June 11, 2012, 10:52 Travis CaveSpent Target VaultStandard Operation Nb#6Spent target moveThe Nb#6 target has been moved from the
south hot cell into storage. It was place
in pail #95 and is in slot 5C of the vault.
 Vault_Storage_June_11_2012.pdf 
  125   Monday, June 11, 2012, 14:14 Travis CaveConditioning StationStandard OperationTM1Ta#38Electrical checkElectrical check of TM#1 with Ta#38 at
the conditioning station under vacuum. See
attached file for details.
 TM#1_Ta38_at_constat_elec_check.PDF 
  127   Tuesday, June 19, 2012, 10:35 Travis CaveITWStandard OperationTM1Ta#38module moveTM#1 with Ta#38 moved from the conditioning
station to the west target station. Move
went well.
  
  130   Thursday, June 21, 2012, 14:00 Travis CaveSouth Hot-CellRepairTM3no targetmodule moveTM#3 has been moved from the south west
silo to the south hot cell for the start
of its second refurb/repair. The fields of
  
  137   Tuesday, July 03, 2012, 12:26 Travis CaveSouth Hot-CellStandard OperationTM4SiC#27module moveTM#4 with SiC#27 moved from the east station
to the south hot cell. Fields at East MAA
were 127mSv/hr and the fields at the south
  
  138   Wednesday, July 04, 2012, 11:33 Travis CaveSouth Hot-CellStandard OperationTM4UO#3Electrical checkElectrical check of TM#4 with  UO#3
attached at the south hot cell see attached
PDF for full results. It has been noted that
 TM#4_UO#3_elec_check.PDF 
  140   Wednesday, July 04, 2012, 14:16 Travis CaveConditioning StationStandard OperationTM4UO#3module moveTM#4 with UO#3 moved from the south hot
cell to the conditioning station. The fields
of the module at the hot cell was 74.4 mSv/hr.
  
  141   Friday, July 06, 2012, 09:24 Travis CaveConditioning StationStandard OperationTM4UO#3Electrical checkElectrical check of the target was done
at the conditioning station under vacuum,
see attached file for details.
 TM#4_UO#3_elec_check_under_vac.PDF 
  142   Friday, July 06, 2012, 11:34 Travis CaveSpent Target VaultStandard Operation SiC#27Spent target moveSiC#27 has been moved from the south hot
cell to the spent target vault. Target was
placed in pail #96, placed in slot 3A, the
 Vault_Storage_July_6_2012.pdf 
  144   Monday, July 09, 2012, 10:51 Travis CaveITEStandard OperationTM4UO#3module moveTM#4 with UO#3 from the conditioning station
to the east target station. Move went well.
  
  152   Tuesday, July 31, 2012, 10:50 Travis CaveSouth Hot-CellStandard OperationTM1Ta#38module moveTM#1 with Ta#38 has been moved from the
west target station to the south hot cell,
no problems with the move.
  
  155   Tuesday, July 31, 2012, 14:04 Travis CaveConditioning StationStandard OperationTM1UCx#4module moveTM#1 with UCx#4 has been moved from the
south  hot hell to the conditioning
station. No problems with the move.
  
  156   Wednesday, August 01, 2012, 09:14 Travis CaveConditioning StationStandard OperationTM1UCx#4Electrical checkTM#1 with UCx#4 electrical check done at
the conditioning station under vacuum, see
attached sheet for results.
 TM#1_UC#4_under_vac.PDF 
  158   Thursday, August 02, 2012, 11:48 Travis CaveSpent Target VaultStandard Operation Ta#38Spent target moveTa#38 was moved from the south Hot Cell
to the Spent Target Vault. Target is in pail
#97, and was placed into tray 6 slot B of
 Vault_Storage_August_2_2012.pdf 
  160   Tuesday, August 14, 2012, 11:16 Travis CaveITWStandard OperationTM1UCx#4module moveTM#1 with UCx#4 has been moved from the
conditioning station to the west target station
move went well.
  
  161   Tuesday, August 14, 2012, 11:16 Travis CaveITWStandard OperationTM1UCx#4module moveTM#1 with UCx#4 moved from the conditioning
to the west target station move went well.
  
  167   Tuesday, September 04, 2012, 11:11 Travis CaveSouth Hot-CellStandard OperationTM4UO#3module moveTM#4 with UO#3 has been moved from the
east target station to the south hot cell
for a target exchange. The move went well.
  
  169   Wednesday, September 05, 2012, 11:55 Travis CaveConditioning StationStandard OperationTM4NiO#1module moveTM#4 with NiO#1 has been moved from the
south hot cell to the conditioning station.
Move went well.
  
  171   Wednesday, September 05, 2012, 14:40 Travis CaveConditioning StationStandard OperationTM4NiO#1Electrical checkSee attached PDF for details. 60kV Common
to the target is low at 343k but I've been
told will work. Test will be done again on
 TM#4_NiO#1.PDF 