Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 130     Entry time: Thursday, June 21, 2012, 14:00
Author: Travis Cave 
Category: South Hot-Cell 
Type: Repair 
Module: TM3 
Target/Number: no target 
Subject: module move 

TM#3 has been moved from the south west silo to the south hot cell for the start of its second refurb/repair. The fields of the module when it was lowed in was 2msv/hr.

ELOG V2.9.2-2455