Entry  Tuesday, July 03, 2012, 12:26, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#27, module move 

TM#4 with SiC#27 moved from the east station to the south hot cell. Fields at East MAA were 127mSv/hr and the fields at the south hot cell was 77.5 mSv/hr.

Entry  Wednesday, July 04, 2012, 11:33, Travis Cave, South Hot-Cell, Standard Operation, TM4, UO#3, Electrical check TM#4_UO#3_elec_check.PDF

Electrical check of TM#4 with  UO#3 attached at the south hot cell see attached PDF for full results. It has been noted that the Anode to 60kV common is of a low value after consulting with Friedhelm Ames it was determined will will run with what we have.

Entry  Wednesday, July 04, 2012, 14:16, Travis Cave, Conditioning Station, Standard Operation, TM4, UO#3, module move 

TM#4 with UO#3 moved from the south hot cell to the conditioning station. The fields of the module at the hot cell was 74.4 mSv/hr.

Entry  Friday, July 06, 2012, 09:24, Travis Cave, Conditioning Station, Standard Operation, TM4, UO#3, Electrical check TM#4_UO#3_elec_check_under_vac.PDF

Electrical check of the target was done at the conditioning station under vacuum, see attached file for details.

Entry  Friday, July 06, 2012, 11:34, Travis Cave, Spent Target Vault, Standard Operation, , SiC#27, Spent target move Vault_Storage_July_6_2012.pdf

SiC#27 has been moved from the south hot cell to the spent target vault. Target was placed in pail #96, placed in slot 3A, the fields at the hot cell were 178mSv/hr. For the latest on the vault see attached document.

Entry  Monday, July 09, 2012, 10:51, Travis Cave, ITE, Standard Operation, TM4, UO#3, module move 

TM#4 with UO#3 from the conditioning station to the east target station. Move went well.

Entry  Tuesday, July 31, 2012, 10:50, Travis Cave, South Hot-Cell, Standard Operation, TM1, Ta#38, module move 

TM#1 with Ta#38 has been moved from the west target station to the south hot cell, no problems with the move.

Entry  Tuesday, July 31, 2012, 14:04, Travis Cave, Conditioning Station, Standard Operation, TM1, UCx#4, module move 

TM#1 with UCx#4 has been moved from the south  hot hell to the conditioning station. No problems with the move.

Entry  Wednesday, August 01, 2012, 09:14, Travis Cave, Conditioning Station, Standard Operation, TM1, UCx#4, Electrical check TM#1_UC#4_under_vac.PDF

TM#1 with UCx#4 electrical check done at the conditioning station under vacuum, see attached sheet for results.

Entry  Thursday, August 02, 2012, 11:48, Travis Cave, Spent Target Vault, Standard Operation, , Ta#38, Spent target move Vault_Storage_August_2_2012.pdf

Ta#38 was moved from the south Hot Cell to the Spent Target Vault. Target is in pail #97, and was placed into tray 6 slot B of the vault. Field around the pail upon removal from the Hot Cell were 226mSv/hr at about 1/2 metre. See attached PDF for vault details.

Entry  Tuesday, August 14, 2012, 11:16, Travis Cave, ITW, Standard Operation, TM1, UCx#4, module move 

TM#1 with UCx#4 has been moved from the conditioning station to the west target station move went well.

Entry  Tuesday, August 14, 2012, 11:16, Travis Cave, ITW, Standard Operation, TM1, UCx#4, module move 

TM#1 with UCx#4 moved from the conditioning to the west target station move went well.

Entry  Tuesday, September 04, 2012, 11:11, Travis Cave, South Hot-Cell, Standard Operation, TM4, UO#3, module move 

TM#4 with UO#3 has been moved from the east target station to the south hot cell for a target exchange. The move went well.

Entry  Wednesday, September 05, 2012, 11:55, Travis Cave, Conditioning Station, Standard Operation, TM4, NiO#1, module move 

TM#4 with NiO#1 has been moved from the south hot cell to the conditioning station. Move went well.

Entry  Wednesday, September 05, 2012, 14:40, Travis Cave, Conditioning Station, Standard Operation, TM4, NiO#1, Electrical check TM#4_NiO#1.PDF

See attached PDF for details. 60kV Common to the target is low at 343k but I've been told will work. Test will be done again on Friday after it has sat a few days under vacuum.

Entry  Friday, September 07, 2012, 09:47, Travis Cave, Spent Target Vault, Standard Operation, , UO#3, Spent target move Vault_Storage_September_6_2012.pdf

The spent UO#3 was moved from the south hot cell to the storage vault. It was in pail 98 and placed in spot 1A of the vault, the field measured upon removal from the hot cell were 42mSv/hr. See attached PDF for vault details.

Entry  Friday, September 07, 2012, 10:37, Travis Cave, Conditioning Station, Standard Operation, TM4, NiO#1, Electrical check TM#4_NiO#1a.PDF

Electrical check of the TM#4 with NiO#1 was done again today. see attached file for results.

Entry  Thursday, September 13, 2012, 11:03, Travis Cave, South Hot-Cell, Standard Operation, TM1, UCx#4, module move 

TM#1 with UCx#4 has been moved from the west target station to the south hot cell. Move went well.

Entry  Thursday, September 13, 2012, 13:27, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move 

TM#1 has been moved from the south hot cell to the south west silo. Move went well.

Entry  Friday, September 14, 2012, 10:45, Travis Cave, Spent Target Vault, Standard Operation, , UCx#4, Spent target move Vault_Storage_September_14_2012.pdf

UCx#4 has been moved from the south hot cell to the spent target vault. The target was placed in pail #99 and now resides in spot 3C of the vault. It measured 55.3mSv/hr at ~1m from the hot cell. See attached PDF for further spent target vault details.