  137   Tuesday, July 03, 2012, 12:26 Travis CaveSouth Hot-CellStandard OperationTM4SiC#27module move

TM#4 with SiC#27 moved from the east station to the south hot cell. Fields at East MAA were 127mSv/hr and the fields at the south hot cell was 77.5 mSv/hr.

  138   Wednesday, July 04, 2012, 11:33 Travis CaveSouth Hot-CellStandard OperationTM4UO#3Electrical check

Electrical check of TM#4 with  UO#3 attached at the south hot cell see attached PDF for full results. It has been noted that the Anode to 60kV common is of a low value after consulting with Friedhelm Ames it was determined will will run with what we have.

Attachment 1: TM#4_UO#3_elec_check.PDF
TM#4_UO#3_elec_check.PDF
  140   Wednesday, July 04, 2012, 14:16 Travis CaveConditioning StationStandard OperationTM4UO#3module move

TM#4 with UO#3 moved from the south hot cell to the conditioning station. The fields of the module at the hot cell was 74.4 mSv/hr.

  141   Friday, July 06, 2012, 09:24 Travis CaveConditioning StationStandard OperationTM4UO#3Electrical check

Electrical check of the target was done at the conditioning station under vacuum, see attached file for details.

Attachment 1: TM#4_UO#3_elec_check_under_vac.PDF
TM#4_UO#3_elec_check_under_vac.PDF
  142   Friday, July 06, 2012, 11:34 Travis CaveSpent Target VaultStandard Operation SiC#27Spent target move

SiC#27 has been moved from the south hot cell to the spent target vault. Target was placed in pail #96, placed in slot 3A, the fields at the hot cell were 178mSv/hr. For the latest on the vault see attached document.

Attachment 1: Vault_Storage_July_6_2012.pdf
Vault_Storage_July_6_2012.pdf Vault_Storage_July_6_2012.pdf Vault_Storage_July_6_2012.pdf Vault_Storage_July_6_2012.pdf
  144   Monday, July 09, 2012, 10:51 Travis CaveITEStandard OperationTM4UO#3module move

TM#4 with UO#3 from the conditioning station to the east target station. Move went well.

  152   Tuesday, July 31, 2012, 10:50 Travis CaveSouth Hot-CellStandard OperationTM1Ta#38module move

TM#1 with Ta#38 has been moved from the west target station to the south hot cell, no problems with the move.

  155   Tuesday, July 31, 2012, 14:04 Travis CaveConditioning StationStandard OperationTM1UCx#4module move

TM#1 with UCx#4 has been moved from the south  hot hell to the conditioning station. No problems with the move.

  156   Wednesday, August 01, 2012, 09:14 Travis CaveConditioning StationStandard OperationTM1UCx#4Electrical check

TM#1 with UCx#4 electrical check done at the conditioning station under vacuum, see attached sheet for results.

Attachment 1: TM#1_UC#4_under_vac.PDF
TM#1_UC#4_under_vac.PDF
  158   Thursday, August 02, 2012, 11:48 Travis CaveSpent Target VaultStandard Operation Ta#38Spent target move

Ta#38 was moved from the south Hot Cell to the Spent Target Vault. Target is in pail #97, and was placed into tray 6 slot B of the vault. Field around the pail upon removal from the Hot Cell were 226mSv/hr at about 1/2 metre. See attached PDF for vault details.

Attachment 1: Vault_Storage_August_2_2012.pdf
Vault_Storage_August_2_2012.pdf Vault_Storage_August_2_2012.pdf Vault_Storage_August_2_2012.pdf Vault_Storage_August_2_2012.pdf
  160   Tuesday, August 14, 2012, 11:16 Travis CaveITWStandard OperationTM1UCx#4module move

TM#1 with UCx#4 has been moved from the conditioning station to the west target station move went well.

  161   Tuesday, August 14, 2012, 11:16 Travis CaveITWStandard OperationTM1UCx#4module move

TM#1 with UCx#4 moved from the conditioning to the west target station move went well.

  167   Tuesday, September 04, 2012, 11:11 Travis CaveSouth Hot-CellStandard OperationTM4UO#3module move

TM#4 with UO#3 has been moved from the east target station to the south hot cell for a target exchange. The move went well.

  169   Wednesday, September 05, 2012, 11:55 Travis CaveConditioning StationStandard OperationTM4NiO#1module move

TM#4 with NiO#1 has been moved from the south hot cell to the conditioning station. Move went well.

  171   Wednesday, September 05, 2012, 14:40 Travis CaveConditioning StationStandard OperationTM4NiO#1Electrical check

See attached PDF for details. 60kV Common to the target is low at 343k but I've been told will work. Test will be done again on Friday after it has sat a few days under vacuum.

Attachment 1: TM#4_NiO#1.PDF
TM#4_NiO#1.PDF
  173   Friday, September 07, 2012, 09:47 Travis CaveSpent Target VaultStandard Operation UO#3Spent target move

The spent UO#3 was moved from the south hot cell to the storage vault. It was in pail 98 and placed in spot 1A of the vault, the field measured upon removal from the hot cell were 42mSv/hr. See attached PDF for vault details.

Attachment 1: Vault_Storage_September_6_2012.pdf
Vault_Storage_September_6_2012.pdf Vault_Storage_September_6_2012.pdf Vault_Storage_September_6_2012.pdf Vault_Storage_September_6_2012.pdf
  174   Friday, September 07, 2012, 10:37 Travis CaveConditioning StationStandard OperationTM4NiO#1Electrical check

Electrical check of the TM#4 with NiO#1 was done again today. see attached file for results.

Attachment 1: TM#4_NiO#1a.PDF
TM#4_NiO#1a.PDF
  177   Thursday, September 13, 2012, 11:03 Travis CaveSouth Hot-CellStandard OperationTM1UCx#4module move

TM#1 with UCx#4 has been moved from the west target station to the south hot cell. Move went well.

  178   Thursday, September 13, 2012, 13:27 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule move

TM#1 has been moved from the south hot cell to the south west silo. Move went well.

  179   Friday, September 14, 2012, 10:45 Travis CaveSpent Target VaultStandard Operation UCx#4Spent target move

UCx#4 has been moved from the south hot cell to the spent target vault. The target was placed in pail #99 and now resides in spot 3C of the vault. It measured 55.3mSv/hr at ~1m from the hot cell. See attached PDF for further spent target vault details.

Attachment 1: Vault_Storage_September_14_2012.pdf
Vault_Storage_September_14_2012.pdf Vault_Storage_September_14_2012.pdf Vault_Storage_September_14_2012.pdf Vault_Storage_September_14_2012.pdf