108
|
Tuesday, May 22, 2012, 08:33 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#27 | Electrical check |
Electrical check of TM#4 with SiC#27 under vacuum at that conditioning station. See attached PDF for details. |
Attachment 1: TM#4_SiC#27_pre_beam_under_vac.PDF
|
|
110
|
Tuesday, May 22, 2012, 10:50 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#27 | module moved |
Module has been moved from conditioning station to the east target station. Move went well. |
113
|
Friday, May 25, 2012, 10:48 |
Travis Cave | Spent Target Vault | Standard Operation | | | Moving the spent targets to mini storage. |
Five targets were moved to the mini storage today in preparation for transfer of the targets to the F308s later next week. The moves went well. See the attached files for the vault and mini storage details. |
Attachment 1: Mini_Vault_Storage_May_25_2012.pdf
|
|
Attachment 2: Vault_Storage_May_25_2012.pdf
|
|
124
|
Monday, June 11, 2012, 10:52 |
Travis Cave | Spent Target Vault | Standard Operation | | Nb#6 | Spent target move |
The Nb#6 target has been moved from the south hot cell into storage. It was place in pail #95 and is in slot 5C of the vault. See attached file for more details. |
Attachment 1: Vault_Storage_June_11_2012.pdf
|
|
125
|
Monday, June 11, 2012, 14:14 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#38 | Electrical check |
Electrical check of TM#1 with Ta#38 at the conditioning station under vacuum. See attached file for details. |
Attachment 1: TM#1_Ta38_at_constat_elec_check.PDF
|
|
127
|
Tuesday, June 19, 2012, 10:35 |
Travis Cave | ITW | Standard Operation | TM1 | Ta#38 | module move |
TM#1 with Ta#38 moved from the conditioning station to the west target station. Move went well. |
130
|
Thursday, June 21, 2012, 14:00 |
Travis Cave | South Hot-Cell | Repair | TM3 | no target | module move |
TM#3 has been moved from the south west silo to the south hot cell for the start of its second refurb/repair. The fields of the module when it was lowed in was 2msv/hr. |
137
|
Tuesday, July 03, 2012, 12:26 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#27 | module move |
TM#4 with SiC#27 moved from the east station to the south hot cell. Fields at East MAA were 127mSv/hr and the fields at the south hot cell was 77.5 mSv/hr. |
138
|
Wednesday, July 04, 2012, 11:33 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UO#3 | Electrical check |
Electrical check of TM#4 with UO#3 attached at the south hot cell see attached PDF for full results. It has been noted that the Anode to 60kV common is of a low value after consulting with Friedhelm Ames it was determined will will run with what we have. |
Attachment 1: TM#4_UO#3_elec_check.PDF
|
|
140
|
Wednesday, July 04, 2012, 14:16 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UO#3 | module move |
TM#4 with UO#3 moved from the south hot cell to the conditioning station. The fields of the module at the hot cell was 74.4 mSv/hr. |
141
|
Friday, July 06, 2012, 09:24 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UO#3 | Electrical check |
Electrical check of the target was done at the conditioning station under vacuum, see attached file for details. |
Attachment 1: TM#4_UO#3_elec_check_under_vac.PDF
|
|
142
|
Friday, July 06, 2012, 11:34 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#27 | Spent target move |
SiC#27 has been moved from the south hot cell to the spent target vault. Target was placed in pail #96, placed in slot 3A, the fields at the hot cell were 178mSv/hr. For the latest on the vault see attached document. |
Attachment 1: Vault_Storage_July_6_2012.pdf
|
|
144
|
Monday, July 09, 2012, 10:51 |
Travis Cave | ITE | Standard Operation | TM4 | UO#3 | module move |
TM#4 with UO#3 from the conditioning station to the east target station. Move went well. |
152
|
Tuesday, July 31, 2012, 10:50 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#38 | module move |
TM#1 with Ta#38 has been moved from the west target station to the south hot cell, no problems with the move. |
155
|
Tuesday, July 31, 2012, 14:04 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UCx#4 | module move |
TM#1 with UCx#4 has been moved from the south hot hell to the conditioning station. No problems with the move. |
156
|
Wednesday, August 01, 2012, 09:14 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UCx#4 | Electrical check |
TM#1 with UCx#4 electrical check done at the conditioning station under vacuum, see attached sheet for results. |
Attachment 1: TM#1_UC#4_under_vac.PDF
|
|
158
|
Thursday, August 02, 2012, 11:48 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#38 | Spent target move |
Ta#38 was moved from the south Hot Cell to the Spent Target Vault. Target is in pail #97, and was placed into tray 6 slot B of the vault. Field around the pail upon removal from the Hot Cell were 226mSv/hr at about 1/2 metre. See attached PDF for vault details. |
Attachment 1: Vault_Storage_August_2_2012.pdf
|
|
160
|
Tuesday, August 14, 2012, 11:16 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#4 | module move |
TM#1 with UCx#4 has been moved from the conditioning station to the west target station move went well. |
161
|
Tuesday, August 14, 2012, 11:16 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#4 | module move |
TM#1 with UCx#4 moved from the conditioning to the west target station move went well. |
167
|
Tuesday, September 04, 2012, 11:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UO#3 | module move |
TM#4 with UO#3 has been moved from the east target station to the south hot cell for a target exchange. The move went well. |