Entry  Monday, March 12, 2012, 09:19, Travis Cave, South Hot-Cell, Standard Operation, TM1, UCx#3, module move 

TM#1 with UC#3 was moved from the west maa to the south hot cell, move went well

Entry  Monday, March 12, 2012, 11:54, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module moved 

TM#1 has been moved from the south hot cell to the north east silo, move went well.

Entry  Thursday, April 12, 2012, 09:38, Travis Cave, Conditioning Station, Standard Operation, TM1, no target, Move ot TM#1 

TM#1 has been moved from the NE silo to the Conditioning Station.

Entry  Tuesday, April 17, 2012, 11:30, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module moved 

TM#1 moved from conditioning station to the south hot cell, the module had a field of 16mSv/hr.  The move was not without excitement as the crane decided on its own to move 2 inches west on two occasions during the move.On the second time that the errant moved happened I hit the E-stop on the crane kill the power, the first time it happen it stopped the errant movement on its own.

Entry  Thursday, April 19, 2012, 09:36, Travis Cave, South Hot-Cell, Standard Operation, TM1, Nb#6, Electrical check Elec_Check_TM1_Nb6.PDF

Electrical check has been completed of TM#1 with Nb#6 attached. Our new micro-ohm meter was also used for the first time for this test.

Entry  Friday, April 20, 2012, 14:07, Travis Cave, Conditioning Station, Standard Operation, TM1, Nb#6, module move 

TM#1 with Nb#6 is now in the conditioning station. The fields of the module at the south cell was 15.8mSv/hr. The move was uneventful. Don Dale was present for the move locking out parts of the code so only one movement of the crane could be done at a time.

Entry  Tuesday, April 24, 2012, 10:02, Travis Cave, ITW, Standard Operation, TM1, Nb#6, module move 

TM#1 with Nb#6 from the conditioning station to the west target station, move was uneventful. Mike LaRoss was there today for move in place of Don Dale working the PLC.

Entry  Monday, May 14, 2012, 12:37, Travis Cave, ITE, Standard Operation, TM4, SiC#26, module move 

TM#4 with SiC #26 was moved from the East Station to the South Hot Cell. Bevan was at the helm of the PLC. There was no issue with the move.

Entry  Tuesday, May 15, 2012, 11:45, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#26, Electrical check TM#4_SiC#26_FEBIAD_post_beam.PDF

Results of the electrical check of TM#4 with SiC#26 attached post beam.

Entry  Tuesday, May 15, 2012, 14:29, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, module move 

TM#4 moved from the south hot cell to the north east storage silo. No issues with the move.

Entry  Wednesday, May 16, 2012, 10:35, Travis Cave, Spent Target Vault, Standard Operation, , SiC#26, Spent target move Vault_Storage_May_16_2012.pdf

SiC #26 was moved from the south hot cell into storage today. The target was is in pail # 94 and was placed in slot 1B in the storage vault. The fields of the pail at the hot cell were 118mSv/hr upon pail been removed from the hot cell. Attached is the current status of the storage vault.

Entry  Thursday, May 17, 2012, 14:08, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, module move 

TM#4 has been moved from the north east silo to the south hot cell for target installation.  No problems with the move.

Entry  Friday, May 18, 2012, 08:29, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#27, Electrical check TM#4_SiC#27_pre_beam.PDF

TM#4 with SiC#27 has had its electrical check. See attached PDF for details.

Entry  Tuesday, May 22, 2012, 08:33, Travis Cave, Conditioning Station, Standard Operation, TM4, SiC#27, Electrical check TM#4_SiC#27_pre_beam_under_vac.PDF

Electrical check of TM#4 with SiC#27 under vacuum at that conditioning station. See attached PDF for details.

Entry  Tuesday, May 22, 2012, 10:50, Travis Cave, ITE, Standard Operation, TM4, SiC#27, module moved 

Module has been moved from conditioning station to the east target station. Move went well.

Entry  Friday, May 25, 2012, 10:48, Travis Cave, Spent Target Vault, Standard Operation, , , Moving the spent targets to mini storage. Mini_Vault_Storage_May_25_2012.pdfVault_Storage_May_25_2012.pdf

Five targets were moved to the mini storage today in preparation for transfer of the targets to the F308s later next week. The moves went well. See the attached files for the vault and mini storage details.

Entry  Monday, June 11, 2012, 10:52, Travis Cave, Spent Target Vault, Standard Operation, , Nb#6, Spent target move Vault_Storage_June_11_2012.pdf

The Nb#6 target has been moved from the south hot cell into storage. It was place in pail #95 and is in slot 5C of the vault. See attached file for more details.

Entry  Monday, June 11, 2012, 14:14, Travis Cave, Conditioning Station, Standard Operation, TM1, Ta#38, Electrical check TM#1_Ta38_at_constat_elec_check.PDF

Electrical check of TM#1 with Ta#38 at the conditioning station under vacuum. See attached file for details.

Entry  Tuesday, June 19, 2012, 10:35, Travis Cave, ITW, Standard Operation, TM1, Ta#38, module move 

TM#1 with Ta#38 moved from the conditioning station to the west target station. Move went well.

Entry  Thursday, June 21, 2012, 14:00, Travis Cave, South Hot-Cell, Repair, TM3, no target, module move 

TM#3 has been moved from the south west silo to the south hot cell for the start of its second refurb/repair. The fields of the module when it was lowed in was 2msv/hr.