Message ID: 87     Entry time: Tuesday, April 17, 2012, 11:30
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: no target 
Subject: module moved 

TM#1 moved from conditioning station to the south hot cell, the module had a field of 16mSv/hr.  The move was not without excitement as the crane decided on its own to move 2 inches west on two occasions during the move.On the second time that the errant moved happened I hit the E-stop on the crane kill the power, the first time it happen it stopped the errant movement on its own.