Entry  Thursday, November 17, 2011, 11:51, Travis Cave, Spent Target Vault, Standard Operation, , TaC#1, Spent target move 
TaC#1 was moved from the south hot cell to the storage vault. It was placed in pail#92 and put in vault slot 7B. It was 239mSv/hr upon removal from the
south hot cell.
Entry  Thursday, November 17, 2011, 11:52, Travis Cave, Conditioning Station, Standard Operation, TM1, no target, Module move 
TM#1 moved from the conditioning station to the south hot cell. Move went well.
Entry  Friday, November 18, 2011, 09:44, Travis Cave, South Hot-Cell, Standard Operation, TM1, UCx#3, Electrical check ITW_UC#3_Elec_check.PDF
Electrical checks of TM#1 with UCx#3 have been completed. They all appear to be with in operational range. All megger checks were done at 500 volts.
See attached file for details.
Entry  Friday, November 18, 2011, 11:09, Travis Cave, Conditioning Station, Standard Operation, TM1, UCx#3, Module move 
TM#1 with UCx#3 has been moved from the south hot cell to the conditioning station. Move went well.
Entry  Thursday, November 24, 2011, 10:39, Travis Cave, ITW, Standard Operation, TM1, UCx#3, Module move 
TM#1 with UCx#3 moved from conditioning station to west target station. Move went well.
Entry  Thursday, November 24, 2011, 10:40, Travis Cave, ITW, Standard Operation, TM1, UCx#3, Module move 
TM#1 with UCx#3 moved from the conditioning station to the west target station.
Entry  Thursday, December 15, 2011, 13:08, Travis Cave, Spent Target Vault, Standard Operation, , , Spent Target Assay Vault_Storage_December_14_2011.pdf
Spent target assay completed. A total of 16 target were looked at, 13 were low enough to be assayed and those 13 are at shippable levels, the other 3
of the 16 looked at were too hot to ship and assay. See attached pdf for complete details.
Entry  Wednesday, January 04, 2012, 13:49, Travis Cave, Spent Target Vault, Standard Operation, , , Moving the spent targets to mini storage. 
Well the first of this year's lucky winners to win a fabulous one way trip to Chalk River are as follows. UC#1, UC#2, Ta#25, Ta#26, and Ta#37. First
these lucky winners will get to stay several days and night in the lovely all inclusive mini vault before being loaded in to their very own private F-308
flasks to be whisked away off to fabulous Chalk River.
Entry  Thursday, January 05, 2012, 11:40, Travis Cave, Spent Target Vault, Standard Operation, , , Target swapping  Vault_Storage_January_5_2012.pdfMini_Vault_Storage_January_5_2012.pdf
Looks like the UC target s #1 and #2 were found invalidprize winners for their all inclusive trip to Chalk River and have thus been placed back in to
storage for the next draw. In their place a pair of lucky Ta targets won, seems to be Ta lucky draw this year, Ta#28 and #29 have been placed in the mini
storage for several fabulous day and wondrous nights, before being whisked away on their all inclusive one way trip to Chalk River. See attachments for
Entry  Thursday, January 12, 2012, 08:43, Travis Cave, Spent Target Vault, Standard Operation, , , Spent targets to F-308s 
All targets in the mini storage have been moved to F-308s and those flasks have been moved over to rad waste. The transfer of target occurred on January
10th and the flasks were moved to rad waste on January 11th.  Contamination was found on the bottoms of some of the pails and was removed, some of
the contamination was difficult but not impossible to remove from the pail bottoms.
Entry  Monday, March 12, 2012, 09:19, Travis Cave, South Hot-Cell, Standard Operation, TM1, UCx#3, module move 
TM#1 with UC#3 was moved from the west maa to the south hot cell, move went well
Entry  Monday, March 12, 2012, 11:54, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module moved 
TM#1 has been moved from the south hot cell to the north east silo, move went well.
Entry  Thursday, April 12, 2012, 09:38, Travis Cave, Conditioning Station, Standard Operation, TM1, no target, Move ot TM#1 
TM#1 has been moved from the NE silo to the Conditioning Station.
Entry  Tuesday, April 17, 2012, 11:30, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module moved 
TM#1 moved from conditioning station to the south hot cell, the module had a field of 16mSv/hr.  The move was not without excitement as the crane
decided on its own to move 2 inches west on two occasions during the move.On the second time that the errant moved happened I hit the E-stop on the crane
kill the power, the first time it happen it stopped the errant movement on its own.
Entry  Thursday, April 19, 2012, 09:36, Travis Cave, South Hot-Cell, Standard Operation, TM1, Nb#6, Electrical check Elec_Check_TM1_Nb6.PDF
Electrical check has been completed of TM#1 with Nb#6 attached. Our new micro-ohm meter was also used for the first time for this test.
Entry  Friday, April 20, 2012, 14:07, Travis Cave, Conditioning Station, Standard Operation, TM1, Nb#6, module move 
TM#1 with Nb#6 is now in the conditioning station. The fields of the module at the south cell was 15.8mSv/hr. The move was uneventful. Don Dale was present
for the move locking out parts of the code so only one movement of the crane could be done at a time.
Entry  Tuesday, April 24, 2012, 10:02, Travis Cave, ITW, Standard Operation, TM1, Nb#6, module move 
TM#1 with Nb#6 from the conditioning station to the west target station, move was uneventful. Mike LaRoss was there today for move in place of Don Dale
working the PLC.
Entry  Monday, May 14, 2012, 12:37, Travis Cave, ITE, Standard Operation, TM4, SiC#26, module move 
TM#4 with SiC #26 was moved from the East Station to the South Hot Cell. Bevan was at the helm of the PLC. There was no issue with the move.
Entry  Tuesday, May 15, 2012, 11:45, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#26, Electrical check TM#4_SiC#26_FEBIAD_post_beam.PDF
Results of the electrical check of TM#4 with SiC#26 attached post beam.
Entry  Tuesday, May 15, 2012, 14:29, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, module move 
TM#4 moved from the south hot cell to the north east storage silo. No issues with the move.