2428
|
Thursday, March 30, 2023, 14:29 |
Frank Song | ITE/ITW | Development | | | Preparation of target stations for FEBIAD runs |
Helium cylinder and Argon cylinder are installed in both ITE/ITW faraday cages , regulator for outlet pressure are not set yet.
TO ITE : Argon bottle size 14"L x 4"D with SV2 connected at pressure 900 Psi ( 70 bar )
Helium bottle size 18"L x 7"D with SV1 connected at pressure 2000 Psi ( 130 bar )
TO ITW: Argon bottle size 15"L x 2"D with SV2 connected at pressure 1000 Psi ( 80 bar )
Helium bottle size 18"L x 7"D with SV1 connected at pressure 2000 Psi ( 130 bar )
An Neon cylinder size 20"L x 6"D at less than 100 psi ( <10 bar ) pressure stored in the cabinet of ITW cage without connection
two gas line connection pictures are attached here for reference. |
|
2427
|
Monday, March 13, 2023, 11:25 |
Carla Babcock | ITE/ITW | Development | | | 10kOhm resistors installed in ITE/ITW faraday cages |
On Sept. 14 2022, a 10kOhm 30W resistor was installed in each target station faraday cage, in line with the HV bias supply. This was an effort to reduce the current draw from the BIAS supply and protect the power supply controls cards which have been repeatedly breaking due to HV sparks (we think). In the end we still broke cards after the installation, so it doesn't seem to have helped. See below for details on the electrical side:
At 30kV, HV currents are around 100-150uA, meaning the voltage drop over the resistor is around 1.5V. When operating at higher voltages, with higher current draw, the voltage across the resistor could be over 2V and we could get into a situation where it would have an effect outside the normal adjustments needed on the mass separator. We made this decision based on the fact that the power supply's setting resolution is on the order of 1 x 10-4.
When the resistance of the water changes, this affects the current draw from the power supply and this in turn affects the voltage over this resistor. Based on some sample numbers of running times, there is not much variation in the current except from sparks and if there is some issue, like water leaking between HV and ground. During normal running, the voltage change across the resistor should be less than 0.5V during normal operation. This is on the same order as the 8 hour stability of the power supply.
|
|
2426
|
Wednesday, March 08, 2023, 13:57 |
David Wang | Cooling | Standard Operation | | | HALCW ITC:MP1/MP2 pump and motor temerature measurements |
HALCW ITC:MP1/MP2 pump and motor temperature measurements result:
MP1: pump discharging port: 78F, motor rear bearing house:72F , Motor housing 140F(60C). 6F difference between them is less than 15F manufacturer clarified up limit in instruction manual.
MP2: pump discharging port:78F, motor rear bearing house:72F, Motor housing 122F(50C).
MP1 is better than MP2 on motor status. It could be seen on phase current measurements as well.
Other notes on pump performance: total flow rate 60GPM , discharging gauge pressure 99 to 100 psi on both pumps with one station all of TM water circuits bypassed + other station two of TM water circuits bypassed + both stations 2A beam related water circuits on(2X5). |
|
2425
|
Wednesday, March 08, 2023, 09:19 |
David Wang | Cooling | Standard Operation | | | HALCW ITC:MP1/MP2 motor phase current measurement. |
HALCW ITC:MP1/MP2 motor phase current measurement is done by Joel from electrician group. MP1:17.1A/17.2A/16.7A. MP2: 17.9A/17.9A/17.3A. 19.5A is manufacturer notified on full load phase current.on operating instruction manual. |
|
2424
|
Wednesday, March 08, 2023, 06:32 |
David Wang | Cooling | Maintenance | | | HALCW flow sensors replacement. |
HALCW flow sensors replacement job is done. All ITE/ITW(except ITE HS) return line water flow sensors including paddle wheels and coils are replaced. After job, water interlock signal have been checked in electrical room . Everything works fine. Visually inspections for possible water leak on HCLCW system have been done as well. one valve on ITE dump return line has a very small water seeping through valve stem. I will watch on it. Other than that, No major concern.
2023-03-08: leak on 1/2" ITE dump return line valve is fixed. |
|
2423
|
Tuesday, March 07, 2023, 10:37 |
chad fisher | North Hot-Cell | Repair | | | Spare Telemanipulator: Y-Motion Linear Actuator Repair |
Adam Newsome wrote: |
The linear actuator used for the Y-motion motor assistance on the spare telemanipulator was replaced and tested. It was observed around September 2021 that the former one which was installed was causing fuses to blow for the main 120 VAC power supply in the control box. After some troubleshooting, it was determined that the linear actuator itself did not operate smoothly - it was suspected that this caused motor overload due to additional friction. This suspicion was confirmed by operating the linear actuator independently with a power supply and measuring current draw. The part has been replaced by Thomson PPA90-58B65-08NXXX. Note: this part took over 1 year to arrive since it was first ordered. The spare telemanipulator is confirmed operational.
|
During this repair it was noted that the Y-axis electrical translation is locked out when the Z-axis is in the fully retracted position (i.e. the Z-axis limit switch engaged). I have made a note of this in the operator manual (CRLD-1046-B Rev1 ) which can be found in docushare collection 26780 |
|
2422
|
Monday, March 06, 2023, 11:31 |
Adam Newsome | North Hot-Cell | Repair | | | Spare Telemanipulator: Y-Motion Linear Actuator Repair |
The linear actuator used for the Y-motion motor assistance on the spare telemanipulator was replaced and tested. It was observed around September 2021 that the former one which was installed was causing fuses to blow for the main 120 VAC power supply in the control box. After some troubleshooting, it was determined that the linear actuator itself did not operate smoothly - it was suspected that this caused motor overload due to additional friction. This suspicion was confirmed by operating the linear actuator independently with a power supply and measuring current draw. The part has been replaced by Thomson PPA90-58B65-08NXXX. Note: this part took over 1 year to arrive since it was first ordered. The spare telemanipulator is confirmed operational.
Update 2024-09-11: noting that this was for serial number 9351 |
|
2421
|
Wednesday, March 01, 2023, 10:01 |
David Wang | ITE/ITW | Development | | | vacuum pit ventilation upgrade. |
vacuum pit ventilation upgrade was done last week. The jobs include: installed two industrial cooling fans. One is placed in pit on resin tan cover. Other one is placed on and opening to pit by shielding blocks. They are installed for better air circulation in pit. Also, 2x two small 20W cooling fans are installed on ITH MP1 and MP1S to low the pump operation temperature. The result is positive. The ventilation status in pit meets the pump operation requirement (good ventilation and 40 Celsuis below) . ITH CG2S 0.0 mtorr. ITH CG2 0.26mtorr. |
|
2420
|
Wednesday, March 01, 2023, 09:34 |
David Wang | Cooling | Maintenance | | | Visual inspection of HALCW for possible small water leak or drip. |
I visually inspected HALCW system including water station section, both target pits, and de-ionizer system. No small leak and drip was found . The inspection in both target pits will be repeated after flow sensors are replaced. |
|
2419
|
Wednesday, March 01, 2023, 09:27 |
David Wang | Cooling | Maintenance | | | Two filters on HALCW resin circuit have been replaced. |
Two filters on HALCW resin circuit have been replaced. O-ring 235# were changed on both filter cartridge houses. 25micron 10"x 2.5" 3M cartridge new filters are used. Old filters are not very dirty. They are bagged and stored in vacuum pit. Residual water from cartridge houses are collected and stored in high active storage jug with sealed cap. No leak on resin circuit before and after the job. |
|
2418
|
Wednesday, February 22, 2023, 09:22 |
Carla Babcock | ITE/ITW | Standard Operation | | | HV testing of ITE/ITW |
Feb. 16 2023: HV tests done on ITE station. Ramped up to 59kV but was not stable there, current draw was very unstable and was sparking every ~6mins. Ramped down to 58kV and it was stable there for 3 hours drawing 285uA.
Feb. 24 2023: HV tests done on ITW station. Ramped easily to 60kV with no sparking - suspicious. Has been stable at 60kV for 45mins with no sparks and current draw of 200uA. Cannot find any reason that things aren't connected properly... |
|
2417
|
Tuesday, February 14, 2023, 11:36 |
David Wang | Assembly/Bench Test | Repair | | | Turbo pump BVs o-ring replacement. |
Five of used internal leaked TP BVs are serviced and repaired. Internal plunge o-ring and case o-ring are replaced on all five BVs. Leak checked valves after . They are ok to be used as spare parts. The are active parts stored in TH now. |
|
2416
|
Monday, February 13, 2023, 09:57 |
David Wang | ITW | Maintenance | | | ITW/ITE primary vacuum back up lines and BVs leak check in target pit. |
In past two weeks, ITW/ ITE primary vacuum back up lines and BVs in ITW/ITE pit have been leak checked. ITW BV1 and BV2 on back up line side were leak. They are replaced with old leak free BVs. ITE TP2 NW25 SST flexible line right after pump were leak . It is replaced with new NW25 SST flexible line. Two leak were found on ITW side KF 50 O-rings connected to NW 50 SST flexible coupling. They were replaced with new KF50 o-rings. After job, both stations primary back up lines in pit were leak checked . They are good. |
|
2415
|
Monday, January 30, 2023, 11:30 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#41 | Spent Target Move |
The spent UC#41 was moved from the south hot cell to the spent target vault, placed in spot 1C, in pail #231. See attached PDF for details. |
|
2414
|
Friday, January 27, 2023, 07:25 |
David Wang | Crane | Standard Operation | | | Inspection of TH crane below hook attachment pins and plates ITA6550-01 |
Tom Kauss inspected target hall crane below hook attachment pins and plates ITA6550-01 yesterday. He certified the use of these pins and plates. The inspection of these pins and plates was in Target hall crane annual check list. It was issued as a calibration index by Isaac Earle in 2022-Feb-08. After inspection, The inspection tag was issued and attached to pin. Tom has an inspection record on this job |
|
2413
|
Friday, January 27, 2023, 07:18 |
David Wang | Crane | Standard Operation | | | Inspection of target module lifing frame ITA0494-1997-01 and ITA0494-1997-02 |
Tom Gauss inspected two target module lifting frames ITA0494-1997-01 and ITA0494-1997-02 yesterday. He certified the use of these two frames for 2023. Inspection tags have been issued and attached to frames. He has inspection record on them. |
|
2412
|
Friday, January 27, 2023, 07:15 |
David Wang | Crane | Standard Operation | | | Target hall Crane annual inspection has beend done. |
Tom Kauss finished TH crane annual inspection yesterday. The crane woks fine. Tom has this inspection record in his file. The crane inspection tag has been issued for 2023. |
|
2411
|
Friday, January 27, 2023, 07:11 |
David Wang | Crane | Standard Operation | | | Target hall Crane annual inspection has beend done. |
Tom Kauss inspected target hall crane yesterday. The crane works fine. Tom has this inspection record in his file. The inspection tag has been issued. |
|
2410
|
Wednesday, January 25, 2023, 06:52 |
David Wang | ITE | Standard Operation | TM4 | UCx#41 | ITE primary and secondary vacuum vessel air to vacuum seals leak check. |
ITE primary and secondary vacuum vessel air to vacuum seals leak check was done this week. One leak has been found on IG1S feed through to entrance module surface seal. It explains what we saw on ITE IG1S readings change(from low E-7 torr to 1Xe-6 torr) on December 22, 2022. This leak seal will be replaced soon.
2023-Jan -27. O-ring seal 229# was replaced on ITEIG1S feedthrough to entrance module surface sealing. Also o-ring seal 034# was replaced on the blank off cover beside the feed through to entrance module surface sealing. Since these o-rings are too close to each other. It is better to replace both of them to avoid misreading in leak check. |
|
2409
|
Tuesday, January 24, 2023, 14:22 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#41 | TM4 electrical check with and without target at SHC |
TM4 electrical check with UCX41target and without target at SHC. The results are good. See attachment. |