1078
|
Wednesday, September 23, 2015, 14:32 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#45 | Helium pressure test on TM4 HS line at CS | Helium pressure test HS line at CS with
70 psi for 2 minutes. Base leak rate
0.0xE-9atm.cc/sec. No response. The line |
|
1079
|
Wednesday, September 23, 2015, 14:35 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#46 | TM4 has been connected at CS | TM4 has been connected at CS. Turbo- pumps
and water system are started and running
. The HV cover has been installed on the |
|
1080
|
Thursday, September 24, 2015, 07:00 |
David Wang | Conditioning Station | Maintenance | TM4 | Ta#46 | Turned off TCS all vacuum pumps and water pumps. | TCS:MP1 back up pressure went up too high
(700mtorr).I turned off all the pumps.The
TCS is under vacuum still. TCS water |
|
1081
|
Thursday, September 24, 2015, 14:59 |
Friedhelm Ames | Conditioning Station | Standard Operation | TM4 | Ta#46 | start high voltage conditioning | |
|
1084
|
Monday, September 28, 2015, 10:10 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#46 | Switched off CS vacuum pumps and water system | I switched off CS vacuum pumps and water
system after Isac opps finished the TM4 conditioning
at CS. |
|
1085
|
Tuesday, September 29, 2015, 09:38 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#46 | Module moved | TM#4 with Ta#46 has been moved to ITE from
the conditioning station. |
|
1086
|
Tuesday, September 29, 2015, 12:31 |
David Wang | ITE | Standard Operation | TM4 | Ta#46 | TM4 has been connected in ITE | Dan and I connected TM4 in ITE. The turbo-
pumps are started. Water supply to TM4 only
at this stage. Everything is good so far. |
|
1091
|
Tuesday, October 06, 2015, 12:50 |
David Wang | ITE | Standard Operation | TM4 | Ta#46 | 5 Shielding blocks have been transferred from ITW to ITE. | The ITE is configured to take proton beam. |
|
1092
|
Tuesday, October 06, 2015, 12:50 |
David Wang | ITE | Standard Operation | TM4 | Ta#46 | 5 Shielding blocks have been transferred from ITW to ITE. | The ITE is configured to take proton beam. |
|
1093
|
Tuesday, October 06, 2015, 13:00 |
David Wang | ITE | Repair | TM4 | | spark on top of TM4 in ITE | During the weekend condition The TM4 spark
at 30KV without vacuum response. It is confirmed
the spark is from the top TM4 this morning.The |
|
1094
|
Tuesday, October 06, 2015, 13:25 |
David Wang | ITE | Standard Operation | TM4 | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | Weekly update target hall schedule. See
attachment 1,2. |
|
1132
|
Tuesday, November 24, 2015, 14:03 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | | Ta#46 | Ta#46 has been removed from TM4. |
|
1133
|
Wednesday, November 25, 2015, 11:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#46 | Module moved | Yesterday TM#4 with Ta#46 was moved from
the east station to the south hot cell. |
|
1134
|
Wednesday, November 25, 2015, 11:55 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#14 | Module moved and electrical check. | TM#4 with UC#14 was moved from the south
hot cell to the conditioning station.
Here are the results of the electrical check |
|
1135
|
Wednesday, November 25, 2015, 14:13 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UC#14 | UCx#14 | UCx#14 installed onto TM4. High current
fasteners torqued to 130 in lbs. |
|
1137
|
Wednesday, November 25, 2015, 15:37 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | UC#14 | Conditioning | Wednesday, November 25, 2015, 15:36:
RGA on
Thursday, November 26, 2015, |
|
1138
|
Thursday, November 26, 2015, 06:25 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#14 | TM4 vacuum has been connected in TCS. | TM4 vacuum has been connected in TCS. All
vacuum pumps were started yesterday. The
pumping down of TM4 and TCS are good so far. |
|
1139
|
Thursday, November 26, 2015, 07:34 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#14 | Helium pressure test on TM4 HS line at CS | I did helium pressure test on TM4 HS line
at TCS this morning. 70psi helium 3
minutes, 0.0xE-9 atm.cc/sec base leak rate. |
|
1140
|
Thursday, November 26, 2015, 07:37 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#14 | TM4 has been connected at CS | TM4 has been connected at TCS. The water
system is started. The TCS HV cover for TM4
is installed also. Basically, The TM4 is |
|
1143
|
Tuesday, December 01, 2015, 06:41 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#14 | Turned off TCS all vacuum pumps and water pumps. | I turned off TCS vacuum and water pumps.
The TSC and TM4 are still under vacuum condition. |
|