  RH-ISAC, Page 15 of 138  Not logged in ELOG logo
ID Date Author Category Type Module Target/Number Subject
  2468   Friday, July 28, 2023, 10:09 Adam NewsomeSpent Target VaultMaintenance  Main Storage Vault: Bearing Lubrication

Bearings for the main storage vault door were lubricated on 2023-07-28. It is unknown when this was last done. It is suggested that this be a recurring maintenance task every two years.

  2467   Tuesday, July 25, 2023, 16:25 Carla BabcockNorth Hot-CellStandard Operation SiC#45SiC#45 post irradiation inspection

Looked at SiC#45 in the hot cell. Looked very clean, no deposits on the heat shield or other components. Target also looked very straight. Only issue we saw was sparking marks on the EE side that faces the ground electrode, in several spots. This target had a bout of sparking when ramping up the protons, so I guess that was the location. Will look for matching spark marks on the ground electrode next time TM4 is in the hot cell. Forgot to take picutres...

  2466   Wednesday, July 19, 2023, 08:09 Frank SongNorth Hot-CellStandard OperationTM4UCx#42electrical check

 An electrical check was made after new target installed on TM4.

Attachment 1: E__check_after_UCx42_installed_on_TM4.pdf
E__check_after_UCx42_installed_on_TM4.pdf
  2465   Wednesday, July 19, 2023, 08:04 Frank SongITEStandard OperationTM4UCx#42Module Connection

 TM4 with new target UCx#42 was connected in ITE. 

Attachment 1: TM4_with_UCx42_connection_in_ITE_20230718.pdf
TM4_with_UCx42_connection_in_ITE_20230718.pdf TM4_with_UCx42_connection_in_ITE_20230718.pdf TM4_with_UCx42_connection_in_ITE_20230718.pdf TM4_with_UCx42_connection_in_ITE_20230718.pdf
  2464   Tuesday, July 18, 2023, 10:08 Frank SongNorth Hot-CellStandard OperationTM4SiC#45module disconnection & electrical check right after transferred from ITE to NHC

 TM4 with spent target SiC#45 was disconnected ITE  and an electrical check made right after moved on NHC. 

Attachment 1: TM4_with_SiC45_disconnection_and_e_check.pdf
TM4_with_SiC45_disconnection_and_e_check.pdf TM4_with_SiC45_disconnection_and_e_check.pdf TM4_with_SiC45_disconnection_and_e_check.pdf TM4_with_SiC45_disconnection_and_e_check.pdf
  2463   Wednesday, July 12, 2023, 22:21 Carla BabcockNorth Hot-CellStandard Operation TiC#5TiC#5 post irradiation inspection results

The TiC#5 post irradiation inspection was done on Wed. June 14 and Mon. June 19. This target didn't have any obvious issues but it didn't produce much beam. The inspection revealed that the container was quite embrittled and showed significant damage, though it was not broken. The FEBIAD grid looked fine, despite the large anode current draw (indicating that current was flowing elsewhere). The gas line looked fine though the gas injection to this target looked as if it wasn't connected. But there was a plug on the unused line, so it must have been correct. No other obvious signs that would explain the poor performance. Pictures are can be found here https://documents.triumf.ca/docushare/dsweb/View/Collection-37913

  2462   Wednesday, June 21, 2023, 14:39 Adam NewsomeSafe Module ParkingMaintenance  Annual electrical and mechanical inspection of Safe Module Parking

An annual electrical and mechanical inspection was performed on the SMP today by Adam Newsome, Travis Cave, Eric Lahe, Maico Dalla Valle, Antoniette Yap, and Jason Zhang as per Work Permit I2023-06-21-4. The following items were checked:

  • Check condition of wiring for physical/radiation/UV damage
    • OK, no signs of significant damage
  • Check for cable tray debris or damage
    • There were multiple items in the cable tray which do not belong there - misc. pieces of wood and metal... these items were not disposed of but should be in the near future
  • Check inside control panel: components and wiring, labeling
    • Labeling intact, components in good condition
    • Misc. random wires pulled to check... one ground wire was loose - it was tightened
  • Verify camera views
    • This was not inspected in detail but signal status was checked, and is checked prior to remote operation
  • Check connectors for damage
    • All connectors OK
  • Check pendant for damage and verify labeling intact
    • Pendant OK
  • Lid open/close test
    • Lid was opened and close multiple times - smooth operation, no concern
    • Lid close logic was checked - OK
  • Vessel rotation and limit switch check
    • Both CW and CCW limits were checked, functioning
    • No concern on rotation - chain drive, rotary limit switch, and cable reel all functioning normally
  • Lubricate chains
    • Not done - should be done next year
  • Inspect tensioners
    • Done - OK
  • Tighten fasteners
    • Not all fasteners were checked - washers will be replaced soon so this was not deemed necessary
    • Approximately 50 washers are missing for socket head screws in slotted parts. Not safety critical but they should be replaced soon.
  • Visual inspection
    • All OK

Overall the inspection was successful.

Attachment 1: PXL_20230621_210144119.MP.jpg
PXL_20230621_210144119.MP.jpg
Attachment 2: PXL_20230621_210546559.jpg
PXL_20230621_210546559.jpg
Attachment 3: PXL_20230621_210146892.jpg
PXL_20230621_210146892.jpg
  2461   Wednesday, June 21, 2023, 09:51 Travis CaveSpent Target VaultStandard Operation TiC#5Spent Target Move

 TiC#5 moved to the spent target vault from the north hot cell. Placed in pail#279 in spot 3A, 40mSv/h when removed from NHC. See attached PDF for further details.

Attachment 1: Target_Index_2023-06-21.pdf
Target_Index_2023-06-21.pdf
  2460   Tuesday, June 20, 2023, 12:37 Adam NewsomeAssembly/Bench TestDevelopment  Modifications to wire ropes for pails within existing F-308s

Based on a request from CNL (attached), modifications were made to the wire ropes protruding through the tops of F-308s to add a crimped loop which acts as a lifting feature. Tests were performed (report attached) on 10 sample units to validate the strength of these loops, since each loop could not be tested in-situ once the pails were already packed in F-308s. CNL has reviewed and approved the test report.

Wire ropes within the following F-308s, which were staged for shipping as of June 20, 2023, were modified to include the lifting loop:

  1. 06
  2. 13
  3. 15
  4. 16
  5. 19
  6. 20
  7. 21
  8. 22

Each lifting loop was:

  • Crimped according to the same procedure, using the same parts and tools, as the 10 sample units
  • Measured using a tape measure to confirm the 3" size specified by CNL
  • Checked using a go/no-go gauge provided from the crimp tool manufacturer
  • "Pull tested" by hand as a quick check to confirm the crimps were successful (not a quantitative and official test, but a secondary qualitative "feel good" check)

As of the time of writing this e-log, TRIUMF believes these F-308s to be ready to ship.

Attachment 1: PXL_20230620_182524722.jpg
PXL_20230620_182524722.jpg
Attachment 2: PXL_20230620_182446158.jpg
PXL_20230620_182446158.jpg
Attachment 3: PXL_20230620_182549601.jpg
PXL_20230620_182549601.jpg
Attachment 4: PXL_20230620_184840103.jpg
PXL_20230620_184840103.jpg
Attachment 5: Triumf_Acceptance_Requirements_for_Intermediate_Level_Waste_Storage_at_CNL.pdf
Triumf_Acceptance_Requirements_for_Intermediate_Level_Waste_Storage_at_CNL.pdf Triumf_Acceptance_Requirements_for_Intermediate_Level_Waste_Storage_at_CNL.pdf Triumf_Acceptance_Requirements_for_Intermediate_Level_Waste_Storage_at_CNL.pdf
Attachment 6: TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf
TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf
  2459   Wednesday, June 14, 2023, 13:37 David WangITEStandard OperationTM4 ITE water signal interlock check

ITE water signal interlock check including HS,EE, TA, TU, MSP. Coil1 , C-window ,2a-window, 2A tank, 2A shielding plug , 2A dump, 2A collimator  are done. All things work.

  2458   Wednesday, June 14, 2023, 07:10 Frank SongITEStandard OperationTM4SiC#45TM4 with SiC#45 connection in ITE

 TM4 with new target SiC#45 was connected in ITE, all TPs are running at their full speed.

Attachment 1: TM4_with_SiC#45_connected_in_ITE_20230613.pdf
TM4_with_SiC#45_connected_in_ITE_20230613.pdf TM4_with_SiC#45_connected_in_ITE_20230613.pdf TM4_with_SiC#45_connected_in_ITE_20230613.pdf TM4_with_SiC#45_connected_in_ITE_20230613.pdf
  2457   Tuesday, June 13, 2023, 11:49 Frank SongNorth Hot-CellStandard OperationTM4SiC#45electrical check and leak check

 TM4 with new target SiC#45 installed has been leak checked and electrical checked on top of NHC.

Attachment 1: TM4_with_SiC#45_leak&electric_check_on_top_of_NHC.png
TM4_with_SiC#45_leak&electric_check_on_top_of_NHC.png
  2456   Tuesday, June 13, 2023, 11:45 Frank SongNorth Hot-CellStandard OperationTM4TiC#5electrical check

 TM4 with spent target TiC#5 electric check after moving from ITE to NHC.

Attachment 1: TM4_with_spent_target_electric_check_right_after_moving_to_NHC.png
TM4_with_spent_target_electric_check_right_after_moving_to_NHC.png
  2455   Tuesday, June 13, 2023, 09:55 Frank SongITEStandard OperationTM4TiC#5module disconnection

 TM4 with TiC#5 was disconnected in ITE and moved to NHC.

Attachment 1: TM4_with_TiC#5_(FEBIAD)disconnected_in_ITE_20230613.pdf
TM4_with_TiC#5_(FEBIAD)disconnected_in_ITE_20230613.pdf TM4_with_TiC#5_(FEBIAD)disconnected_in_ITE_20230613.pdf TM4_with_TiC#5_(FEBIAD)disconnected_in_ITE_20230613.pdf
  2454   Monday, June 12, 2023, 07:36 David WangConditioning StationStandard Operation  TCS water filters annual change.

Plant group changed TCS water filters last Friday. 4 filters on resin can inet /outlet sides and filters(4 in one cartridge house)on pump return line have been changed. Triumf maintenance tags on filters have been updated. No water leak after job. The TCS TK2 water level dropped  from 20" to 16" because of the job. I will refill the level to 28" today. 

TCS:TK2 is refilled to 28".

  2453   Tuesday, June 06, 2023, 17:36 Carla BabcockITWStandard OperationTM2TiC#6Module conditioning

Conditioned TM2 up to 48kV in ITW. Some sparks and current is not very stable. Drawing about 178uA at 48kV.

  2452   Tuesday, June 06, 2023, 15:10 Antoniette YapSpent Target VaultMaintenance   Annual Inspection of Main and Mini Storage Vaults

The annual inspection of the mini-storage vault and main storage vault was completed June 23, 2023. The following items were checked:

  • Cabling and cable management
  • Connectors
  • Controls box - internal wiring and components, functionality
  • Limit switches - functionality, wiring, mounting
  • Motor
  • Bearings
  • Set screws
  • Miscellaneous fasteners

The inspection was generally successful. A couple of minor findings were:

  • Bearings for both the main and mini storage vaults must be greased. This is planned for a different day as it involves removing the mini vault's door.
  • There was a small piece of metal on the track for the mini storage vault which was causing the door to "bump" over it as it passed over. This piece was removed and the door behaved normally.
  • The wheel track for the main storage vault was dirty - it was cleaned
  • It was suggested that the 120 VAC power cable for the mini storage vault controls box should be connectorized - this will be added to the "to-do list" for the future

 

  2451   Tuesday, May 30, 2023, 14:19 David WangITE/ITWStandard Operation  BL2A MAA primary beam exclusion area ASU test.

MAA ASU test have been done following document 154779. All three tests in document are passed. DCR Jas has all test documents.

This test includes the functional test on TH emergency roof hatch which is located at the west end of TH roof. The hatch could be opened and closed properly from TH inside.

  2450   Tuesday, May 30, 2023, 14:15 David WangITWStandard Operation  ITW water signal interlock check is done.

ITW water signal interlock check is done. All ITW water signals including HS, EE, Coil , Ta, Tu, MSP, C-window, HVC1, HVC2, 2A-dump, 2A -shielding plug, 2A-tank, 2A-window, and 2A-collimator are checked. All  water signal interlock work fine.

  2449   Tuesday, May 30, 2023, 12:30 Frank SongITWStandard OperationTM2TiC#6gas lines pump out in ITW Faraday Cage

 Gas lines pumped down at electric room for TM2 at ITW is done, leak rate 0.0e -8 <1.0e -3 T P pressure

Attachment 1: gas_lines_pumped_out_to_ITW.JPG
gas_lines_pumped_out_to_ITW.JPG