Entry  Friday, July 28, 2023, 10:21, Adam Newsome, Spent Target Vault, Maintenance, , , Mini Storage Vault: Bearing Lubrication PXL_20230728_162515733.jpg
Entry  Friday, July 28, 2023, 10:09, Adam Newsome, Spent Target Vault, Maintenance, , , Main Storage Vault: Bearing Lubrication 
Entry  Tuesday, July 25, 2023, 16:25, Carla Babcock, North Hot-Cell, Standard Operation, , SiC#45, SiC#45 post irradiation inspection 
Entry  Wednesday, July 19, 2023, 08:09, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#42, electrical check E__check_after_UCx42_installed_on_TM4.pdf
Entry  Wednesday, July 19, 2023, 08:04, Frank Song, ITE, Standard Operation, TM4, UCx#42, Module Connection TM4_with_UCx42_connection_in_ITE_20230718.pdf
Entry  Tuesday, July 18, 2023, 10:08, Frank Song, North Hot-Cell, Standard Operation, TM4, SiC#45, module disconnection & electrical check right after transferred from ITE to NHC TM4_with_SiC45_disconnection_and_e_check.pdf
Entry  Wednesday, July 12, 2023, 22:21, Carla Babcock, North Hot-Cell, Standard Operation, , TiC#5, TiC#5 post irradiation inspection results 
Entry  Wednesday, June 21, 2023, 14:39, Adam Newsome, Safe Module Parking, Maintenance, , , Annual electrical and mechanical inspection of Safe Module Parking PXL_20230621_210144119.MP.jpgPXL_20230621_210546559.jpgPXL_20230621_210146892.jpg
Entry  Wednesday, June 21, 2023, 09:51, Travis Cave, Spent Target Vault, Standard Operation, , TiC#5, Spent Target Move Target_Index_2023-06-21.pdf
Entry  Tuesday, June 20, 2023, 12:37, Adam Newsome, Assembly/Bench Test, Development, , , Modifications to wire ropes for pails within existing F-308s 6x
Entry  Wednesday, June 14, 2023, 13:37, David Wang, ITE, Standard Operation, TM4, , ITE water signal interlock check 
Entry  Wednesday, June 14, 2023, 07:10, Frank Song, ITE, Standard Operation, TM4, SiC#45, TM4 with SiC#45 connection in ITE TM4_with_SiC#45_connected_in_ITE_20230613.pdf
Entry  Tuesday, June 13, 2023, 11:49, Frank Song, North Hot-Cell, Standard Operation, TM4, SiC#45, electrical check and leak check TM4_with_SiC#45_leak&electric_check_on_top_of_NHC.png
Entry  Tuesday, June 13, 2023, 11:45, Frank Song, North Hot-Cell, Standard Operation, TM4, TiC#5, electrical check TM4_with_spent_target_electric_check_right_after_moving_to_NHC.png
Entry  Tuesday, June 13, 2023, 09:55, Frank Song, ITE, Standard Operation, TM4, TiC#5, module disconnection TM4_with_TiC#5_(FEBIAD)disconnected_in_ITE_20230613.pdf
Entry  Monday, June 12, 2023, 07:36, David Wang, Conditioning Station, Standard Operation, , , TCS water filters annual change.  
Entry  Tuesday, June 06, 2023, 17:36, Carla Babcock, ITW, Standard Operation, TM2, TiC#6, Module conditioning 
Entry  Tuesday, June 06, 2023, 15:10, Antoniette Yap, Spent Target Vault, Maintenance, , , Annual Inspection of Main and Mini Storage Vaults 
Entry  Tuesday, May 30, 2023, 14:19, David Wang, ITE/ITW, Standard Operation, , , BL2A MAA primary beam exclusion area ASU test.  
Entry  Tuesday, May 30, 2023, 14:15, David Wang, ITW, Standard Operation, , , ITW water signal interlock check is done. 