2498
|
Tuesday, November 07, 2023, 13:42 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check with the spent target |
TM4 with spent target Ta#65 was electrical checked right after being moved to SHC. |
Attachment 1: TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf
|
|
2497
|
Tuesday, October 31, 2023, 12:12 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target measurements |
All 20 targets in the vault were measured. The target spread sheet updated. See attached PDF for details. |
Attachment 1: Target_Index_2023-10-31.pdf
|
|
2496
|
Friday, October 13, 2023, 11:51 |
David Wang | ITE/ITW | Maintenance | | | ITH:MP1 is replaced due to its poor performance. |
ITH:MP1 is replaced this morning due to its poor performance started yesterday afternoon. The general field in pit is about 260usv/hr. the contact field on pump is 2.0 msv/hr. New pump works good. Lubricant in pump will be drained next week. then motor will be removed. The pump body will be bagged and stored in silo area. |
2495
|
Friday, October 13, 2023, 11:46 |
David Wang | Cooling | Maintenance | | | HALCW system O2 sensor service and calibration. |
HALCW system O2 sensor service and calibration were done in Sep 26th. electrolyte and membrane on rose mount sensor 499ADO were refilled and replaced. Sensor was zero and full scale calibrated. The sensor works fine after the job. |
2494
|
Friday, October 06, 2023, 10:47 |
Travis Cave | Spent Target Vault | Standard Operation | | Nb#11 | Spent Target Move |
The spent Nb#11 target was removed from the south hot cell and place in the spent target vault. It was placed in pail #283 and place in spot 7B is was 65.7mSv/hr upon removal. see pdf for further vault details. |
Attachment 1: Target_Index_2023-10-06.pdf
|
|
2493
|
Thursday, October 05, 2023, 13:50 |
Frank Song | ITW | Standard Operation | TM2 | Ta#66 | Module Connection |
TM2 with new target Ta#66 was connected in ITW. |
Attachment 1: TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf
|
|
2492
|
Wednesday, October 04, 2023, 10:41 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Ta#66 | electrical check/leak check |
TM2 with new target Ta#66 had an electrical check and leak check on SHC. |
Attachment 1: TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf
|
|
2491
|
Tuesday, October 03, 2023, 14:28 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Nb#11 | electrical check |
An electric checked right after TM2 was moved from ITW. |
Attachment 1: TM2_with_spent_target_Nb#11_electrical_check_right_after_moving_from_ITW_to_SHC.pdf
|
|
2490
|
Tuesday, October 03, 2023, 07:56 |
Frank Song | ITW | Standard Operation | TM2 | Nb#11 | module disconnection |
TM2 with target Nb#11 has been disconneted in ITW. The HS line was purged with Nitrogen in station. |
Attachment 1: TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf
|
|
2489
|
Thursday, September 14, 2023, 11:16 |
Adam Newsome | Spent Target Vault | Development | | Ta #58 | Investigation of Pail 211 (Ta #58) |
Upon attempting to lower Pail 211 into their tile hole, CNL encountered issues with the pail getting stuck. They shipped the pail back to TRIUMF and requested we perform an investigation. The investigation report is attached.
The pail contents must be re-packaged into a new pail.
Note: the F-308 is currently sitting in the Meson Hall warm cell at approximately 250 uSv/h at 0.5 m.
Dose for primary worker (Chad Fisher) who inspected the cable, unbolted the flask lid, and handled the pail briefly: approx. 104 uSv
Dose for secondary worker (Danka Krsmanovic) who swiped the pail and flask to check for contamination: approx. 70 uSv
More photos available upon request from Adam Newsome. |
Attachment 1: Report_on_Inspection_of_Pail_211_on_2023-09-14.pdf
|
|
2488
|
Wednesday, September 06, 2023, 08:07 |
Frank Song | ITE | Standard Operation | TM4 | Ta#65 | Module Connection |
TM4 was connected in ITE with new target Ta#65 installed. see attachment in detail. |
Attachment 1: TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf
|
|
2487
|
Friday, September 01, 2023, 10:36 |
Adam Newsome | Spent Target Vault | Standard Operation | | UCx#42 | Spent Target Move |
UCx #42 moved from North Hot Cell to Storage Vault in Pail #282. Placed in slot 6B. Tray 6 is now full. Pail measured at 34.9 mSv/h at ~1 m upon removal from the hot cell. See attached updated spreadsheet. |
Attachment 1: Target_Index_2023-09-01.xlsm
|
2486
|
Tuesday, August 29, 2023, 14:32 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check/leak check |
TM4 with new target Ta#65 has been E/L checked at NHCPost. |
Attachment 1: TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
|
|
2485
|
Tuesday, August 29, 2023, 14:32 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check/leak check |
TM4 with new target Ta#65 has been E/L checked at NHCPost. |
Attachment 1: TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
|
|
2484
|
Tuesday, August 29, 2023, 10:45 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#42 | electrical check |
TM4 with spent target UCx#42 has been electric checked at NHCpost right after transferred from ITE. |
Attachment 1: TM4_with_UCx42_electric_check_with_spent_target_at_NHCPost__2023-08-29.pdf
|
|
2483
|
Tuesday, August 29, 2023, 09:33 |
Frank Song | ITE | Standard Operation | TM4 | UCx#42 | module disconnection |
TM4 with spent target UCx#42 was disconnected in ITE and has been remote moved to NHC this morning. |
Attachment 1: TM4_with_UCx42_Disconnection_in_ITE_2023-08-29.pdf
|
|
2482
|
Tuesday, August 29, 2023, 09:28 |
Frank Song | ITW | Repair | TM2 | Nb#11 | Module Connection |
Module was connected yesterday and all turbo pumps are running at their top speed. |
Attachment 1: TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf
|
|
2481
|
Tuesday, August 29, 2023, 09:07 |
Frank Song | ITW | Repair | TM2 | Nb#11 | electrical check |
TM2 with new target Nb#11 replaced has been electric checked one more time in ITW. |
Attachment 1: TM2_with_Nb#11_electical_check_in_ITW_2023-08-28.pdf
|
|
2480
|
Monday, August 28, 2023, 12:16 |
Frank Song | North Hot-Cell | Repair | TM2 | Nb#11 | electric/leak check |
TM2 with new target Nb#11 has been E/L checked sitting on NHC. |
Attachment 1: TM2_with_Nb#11_electical_and_leak_check_in_NHC_2023-08-28.pdf
|
|
2479
|
Friday, August 25, 2023, 07:22 |
Frank Song | ITW | Repair | TM2 | Nb#10 | module disconnection |
TM2 with target Nb#10 was disconnected in ITW yesterday for beam production issue investigation. |
Attachment 1: TM2_with_Nb#10_disconnection_at_ITW_2023-08-24.pdf
|
|