2514
|
Wednesday, January 03, 2024, 13:55 |
David Wang | ITW | Standard Operation | TM2 | Ta#66 | Disconnect TM2 in ITW. | TM2 has been disconnected in ITW. All water
lines are nitrogen purged. Filled 60 psi
argon to all Tm2 water lines for module storage |
|
2513
|
Tuesday, January 02, 2024, 16:01 |
Carla Babcock | Conditioning Station | Development | TM3 | | TM3 service tray HV testing and conditioning | Tuesday, January 02, 2024, 15:58 :
Started HV ramp up on TM3 service
tray about 3pm today. Had to bypass TCS:BIAS |
|
2512
|
Thursday, December 21, 2023, 09:37 |
Ferran Boix Pamies | ITE | Development | | | Rewiring of TC multiping wires | Thursday, December 21, 2023, 09:36.
ITE multipin wires 12-13-14-15 were rewired
from the RF driver box to a TC datalogger |
|
2511
|
Friday, December 15, 2023, 11:31 |
Adam Newsome | Spent Target Vault | Standard Operation | | Ta#58 | Pail repack, transfer to mini-storage vault | Pail 211 which contained Ta#58 spent target
was repackaged into Pail 286 in the South
Hot Cell. |
|
2510
|
Friday, December 15, 2023, 11:07 |
Adam Newsome | Conditioning Station | Standard Operation | TM3 | | TM3 Move - SHC to TCS | TM3 was moved from the SHC to the TCS (no
target installed). |
|
2509
|
Wednesday, December 13, 2023, 11:42 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 Move - TCS TO SHC | TM3 has been moved from the target conditioning
station to the south hot cell. |
|
2508
|
Wednesday, November 29, 2023, 12:45 |
Carla Babcock | ITE | Standard Operation | | | gas lines pumped down | Pumped down the gas lines in ITE on Tuesday
Nov. 28 2023 and opened the CF4 bottle valves.
Missed the small section between the regulator |
|
2507
|
Tuesday, November 28, 2023, 12:58 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 Move - Silo to SHC | TM3 was moved from the Silo to South Hot
Cell. |
|
2506
|
Monday, November 27, 2023, 12:01 |
chad fisher | South Hot-Cell | Maintenance | | | Manipulator tong cable and wrist replacement | Broken tong cable on SW manipulator (serial
#8106) of SHC was replaced today.
Following ISAC Hot Cell entry procedure, |
|
2505
|
Thursday, November 23, 2023, 11:15 |
Adam Newsome | Crane | Repair | | | Target Hall Crane: CW/CCW rotation mechanism failure [tripped breaker] | It is reported that the crane's hook rotation
is not working currently. It was working
yesterday (Nov 22). Investigation to follow, |
|
2504
|
Wednesday, November 22, 2023, 12:24 |
Adam Newsome | Spent Target Vault | Standard Operation | | Ta#65 | Spent Target Move | The spent Ta#65 target was removed from
the south hot cell and placed in the spent
target vault. It was placed in pail #284 |
|
2503
|
Monday, November 20, 2023, 12:28 |
Eric Lahe | South Hot-Cell | Maintenance | | | Light Bulb Replacement - South Hot Cell roof lights | 3 light bulbs replaced in the ISAC
South Hot Cell - North West light, South
west light, and South East light bulbs. Northeast |
|
2502
|
Friday, November 17, 2023, 11:28 |
Adam Newsome | Spent Target Vault | Maintenance | | | Storage vault: issue observed with door opening | During operation today, it was observed
that the main vault door had issues opening..
typically when the door was around 80-90% |
|
2501
|
Friday, November 17, 2023, 11:12 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Four pails moved from main storage to mini storage | The following four pails were moved from
the main storage vault to the mini storage
vault, to stage for shipping in Jan. 2024: |
|
2500
|
Wednesday, November 08, 2023, 12:14 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | UCx#43 | electrical check/leak check | TM4 with new target UCx#43 was electrical
and leak checked on SHC. |
|
2499
|
Tuesday, November 07, 2023, 13:55 |
Frank Song | ITE | Standard Operation | TM4 | Ta#65 | module disconnection | TM4 with spent target Ta#65 was disconnected
in ITE and moved to SHC. |
|
2498
|
Tuesday, November 07, 2023, 13:42 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check with the spent target | TM4 with spent target Ta#65 was electrical
checked right after being moved to SHC. |
|
2497
|
Tuesday, October 31, 2023, 12:12 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target measurements | All 20 targets in the vault were
measured. The target spread sheet updated.
See attached PDF for details. |
|
2496
|
Friday, October 13, 2023, 11:51 |
David Wang | ITE/ITW | Maintenance | | | ITH:MP1 is replaced due to its poor performance. | ITH:MP1 is replaced this morning due to
its poor performance started yesterday afternoon.
The general field in pit is about 260usv/hr. |
|
2495
|
Friday, October 13, 2023, 11:46 |
David Wang | Cooling | Maintenance | | | HALCW system O2 sensor service and calibration. | HALCW system O2 sensor service and calibration
were done in Sep 26th. electrolyte and membrane
on rose mount sensor 499ADO were refilled |
|