2736
|
Wednesday, December 18, 2024, 12:18 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Five Pails Transferred from Main Vault to Mini Vault |
Five pails were transferred from main vault to mini vault. Note that there was already one pail in the mini vault, so at present there are six pails staged for packaging into F-308s.
Nb#10, Pail 295, Tray 4A
C#4, Pail 277, Tray 4C
Ta#64, Pail 273, Tray 5C
Ta#62 with wire scanner, Pail 256, Tray 7A
TiC#5, Pail 279, Tray 3A
The target index has been updated accordingly (see attached but note that the summary does not reflect the sixth pail). |
Attachment 1: MiniVault_2024-12-18.pdf
|
|
|
2737
|
Wednesday, December 18, 2024, 14:17 |
Adam Newsome | Pail Handling Tool | Maintenance | | | Pail Handling Tool - Inspection |
An informal inspection of the main Pail Handling Tool was performed today as the final one for the year. Note that the main formal annual inspection was performed June 18, 2024 for this year.
The attachment to this e-log serves as a record of all inspections for this tool throughout 2024.
The spare tool was not inspected as it was not in service this year. |
Attachment 1: ISAC_Pail_Handling_Tool_Inspection_Record_-_2024.pdf
|
|
|
2738
|
Friday, January 03, 2025, 09:59 |
Adam Newsome | Facilities | Standard Operation | | | Safety Walkaround complete - ISAC Hot Cells, Target Hall |
A safety walkaround was completed for the ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be found on DocuShare as Document-242733.
Main deficiencies identified:
- Hot Cells:
- NHC right manipulator gripper stuck (known, repair planned)
- Target Hall:
- 50% of overhead light bulbs burnt out (David Wang contacted Electrical Services to rectify)
- One RH camera for target pit not working (Travis Cave notified)
Action has been taken on all deficiencies. |
|
2744
|
Thursday, January 09, 2025, 11:08 |
David Wang | Facilities | Maintenance | | | ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings |
ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings and investigation in pit. A fault 17644 has been issued. this pump will be replaced in March when general fielding in vacuum pit is reasonable for the job. |
|
2751
|
Monday, January 20, 2025, 11:33 |
Adam Newsome | Waste Package/Ship | Standard Operation | | | F-308 flask loading - six flasks loaded |
Today (2025-01-20), six flasks were loaded in preparation for shipment with the following targets: C#4, TiC#5, Ta#64,Ta#62, Nb#10, SiC#44
Some of the pails (256, 273, 279, 277) required replacement of the wire rope cable with new style, 30 ft length, as requested by CNL. A lifting label was also applied to these pails. Some of the pails (295, 298) already had the appropriate cable and lifter label.
At the time of writing this log:
- The second crimped lifting loop has not yet been applied to each pail.
- The locks have not yet been applied to the flasks.
The mini-storage vault is now EMPTY. The mini-storage vault has been swiped and checked for contamination.
The target index spreadsheet has been updated (attached). |
Attachment 1: Target_Index_2025-01-20.xlsm
|
|
2752
|
Tuesday, January 21, 2025, 10:46 |
David Wang | ITE/ITW | Standard Operation | | | ITW/ITE pit general annual cleaning up. |
ITW/ITE pit general annual cleaning up were done. all concrete floor and TM equipment surface are vacuum cleaned. HV cage inside and blue nylon insulators were wiped by paper. |
|
2753
|
Wednesday, January 22, 2025, 10:29 |
Frank Song | Faraday Cage | Maintenance | | | Annual clean up for ITE/ITW Faraday cages |
David and I cleaned both cages in ISAC1 electric room, all done. |
|
2756
|
Wednesday, January 29, 2025, 09:06 |
David Wang | ITE/ITW | Standard Operation | | | ITE and ITW water system paddle wheels and coils on flow sensors have been replaced |
ITE and ITW water system paddle wheels and coils on all flow sensors in pits have been replaced. It's a SAS job. |
|
2757
|
Wednesday, January 29, 2025, 11:10 |
chad fisher | South Hot-Cell | Standard Operation | | | Pre-entry field Check |
Fields in the hot cell were checked using a pole monitor. Field approximately in the area someone would stand to repair manip. is 3.8 mSv/h
Hot item found! Bag with extraction electrode and high current fasteners from an online target. |
Attachment 1: Image_(1).jpg
|
|
|
2758
|
Wednesday, January 29, 2025, 11:39 |
chad fisher | North Hot-Cell | Repair | | | Model N Remote Arm #9342 Tong Cable |
Model N remote arm serial #9342 tong cable has been un-jammed from between pulley 3D (see picture) and casting (this is an ongoing issue with #9342 and 9352) and cable restrung and exercised to check motion. Tong system is now functional but exhibits excessive slack. Next step will be to check tension of the elevation/twist cables and adjust the pulley block if required (this pulley block houses both the elevation twist cable pulleys and the tong cable pulley 3D which is the site of the persistent cable hop)...I suspect adjusting the tension here will at least slightly improve the slack. In addition I will also investigate repositioning the tong drum screws (the procedure used to adjust the tong opening). |
Attachment 1: Model_N_Pulley_3D.JPG
|
|
|
2759
|
Thursday, January 30, 2025, 07:07 |
David Wang | Crane | Standard Operation | | | target hall crane annual inspection. |
Tom Kauss finished TH crane annual inspection yesterday. The crane woks fine. Tom has this inspection record in his file. The crane inspection tag has been issued for 2025. |
|
2760
|
Thursday, January 30, 2025, 07:13 |
David Wang | Crane | Standard Operation | | | inspection of target module lifting frames ITA0494-1997-01 and ITA1994-1997-02 |
Tom Gauss inspected two target module lifting frames ITA0494-1997-01 and ITA0494-1997-02 yesterday. He certified the use of these two frames for 2025. Inspection tags have been issued and attached to frames. He has inspection record on them.
|
|
2761
|
Thursday, January 30, 2025, 07:17 |
David Wang | Crane | Standard Operation | | | inspection of target hall crane below hook attachment pins and plates ITA6550-01. |
Tom Kauss inspected target hall crane below hook attachment pins and plates ITA6550-01 yesterday. He certified the use of these pins and plates for year 2025. The inspection of these pins and plates was in Target hall crane annual check list. It was issued as a calibration index by Isaac Earle in 2022-Feb-08. After inspection, The inspection tag was issued. Tom has an inspection record on this job. |
|
2762
|
Monday, February 03, 2025, 13:04 |
David Wang | Safe Module Parking | Maintenance | | | ITW/ITW 24VDC electrical connectors for TP BVs MRO. |
ITW/ITW 24VDC electrical connectors for TP BVs MRO has been done. |
|
2763
|
Monday, February 03, 2025, 13:10 |
David Wang | Cooling | Standard Operation | | | HALCW pump ITC:MP1 has been started. |
HALCW pump ITC:MP1 has been started. water are supplied to both ITE and ITW system. all water signals for individual circuits work fine. no major leak on system. Some small water seeping from small ball valve stems are found in ITW. they will be fixed soon. |
|
2764
|
Tuesday, February 04, 2025, 11:50 |
Alexander Shkuratoff | ITW | Standard Operation | | | ITW HV bias test without module (Work permit I2025-02-03-2) |
Tuesday, February 04, 2025, 10:15
- Started voltage ramp up. Using 250 V increments.
Tuesday, February 04, 2025, 12:07
- Current has got a bit noisy, starting at around 56.5 kV.
- Currently at 57 kV. Voltage is stable though.
- Current is about 151 uA on average, with spikes up to 164 uA.
- Held at 57 kV for about 5 minutes, no drops in voltage, so continuing ramp.
- 57.25 kV
- There is noise in the current each time the voltage is increased. It seems to calm down slowly, with the later noise/spikes being less frequent and lower magnitude.
- Average current is about 151 uA. Spikes at the start were as high as 169 uA, and after about 8 minutes they are about 160 uA.
- Held here for about 10 minutes before continuing ramp.
- I will try to get to 58 kV, and then back down to 57 kV to see if the current calms down and there is some sort of conditioning effect. If there is, I'm not sure of the mechanism since nothing is in vacuum.
Tuesday, February 04, 2025, 12:51
- Dropping down to 57 kV, the current was about 150 uA and there were no more noise spikes. Seems like conditioning. Going back to 58 kV and continuing ramp.
Tuesday, February 04, 2025, 13:09
- At 60 kV. Average current is about 187 uA initially, which could just be the average of the noise. It looks like it's dropping a few minutes later. About 10 minutes later, the current is 184 uA. 181 uA after 20 minutes.
- It's been stable for about 30 minutes now. No voltage fluctuations, noise in the current has been the same or decreasing.
- Current is about 177 uA after 80 minutes.
Tuesday, February 04, 2025, 14:36
- It's been 1.5 hours and the voltage has been stable the whole time. All is good. Ramping down.
Tuesday, February 04, 2025, 14:50
- Power supply off
- Data dumped to http://isacwserv.triumf.ca/onlylocal/isacdata/ITW_HV_test_shutdown2025.txt
|
|
2765
|
Wednesday, February 05, 2025, 13:46 |
Alexander Shkuratoff | ITE | Standard Operation | | | ITE HV bias test without module (Work permit I2025-02-03-2) |
Wednesday, February 05, 2025, 12:20
- Ed has the voltage already up to 1000 V. Starting further ramp up in 250 V increments.
Wednesday, February 05, 2025, 12:45
- Current was quite stable with basically no noise, and increasing with voltage until 57.5 kV, when the current spiked from 180 uA to a peak of 308 uA and the voltage dropped a little bit for a single data point. Kept it here for a few second and then dropped it back down a couple steps. Currently at 57 kV and the average current is about the same as before (181 uA), but the noise is significantly higher (+/- 10 uA).
- Been at 57 kV for about 5 minutes and no change in the noise. Will try continuing ramp.
- 57.25 kV: Current is ~193 uA with +/- 20 uA noise.
- Gonna go with 250 V step every 5 minutes from here on until 60 kV.
Voltage (kV) |
Current (uA)
|
Noise (uA) |
V drops in 5 mins |
Current of spikes (uA) |
57.00 |
181 |
10 |
0 |
- |
57.25
|
193 |
20 |
0 |
- |
57.50 |
206 |
25 |
1 |
294 |
57.75 |
216 |
15 |
0 |
- |
58.00
|
225 |
10 |
4 |
876, 993, 873, 995 |
58.25
|
|
|
30+ |
too many to count |
58.50 |
|
|
|
|
Wednesday, February 05, 2025, 13:17
- Seemed like it was having some trouble at 58 kV, and then at 58.25 kV it was fine for about a minute and just starting sparking constantly, and would not calm down after a minute. Some sparks caused a positive voltage swing up to 65 kV, and with currents as high as ~4000 uA.
- Ramped voltage down in steps back to 56.75 kV. It's still getting about 10-11 sparks per 5 minutes.
- Trying 56.5 kV. 8 sparks in 5 minutes, one positive.
- Trying 56.25 kV. 3 very small voltage drops in 5 minutes.
- Trying 56 kV. No voltage drops in 5 minutes. Current is on average ~204 uA, with +/- 20 uA of noise.
Wednesday, February 05, 2025, 15:02
- 1.5 hours at 56 kV. 2 small sparks over this time. Current was about 195 uA on average with about +/- 20 uA of noise. A spark will usually result in a change of the average current following the spark until the next.
- Ramping down voltage now. The amount of noise decreases quickly with voltage and is basically gone at 53 kV.
- Power supply off.
- Dumped data to https://isacwserv.triumf.ca/onlylocal/isacdata/ITE_HV_test_shutdown2025.txt
Conclusion: ITE seems good up to 56 kV. |
|
2767
|
Tuesday, February 11, 2025, 10:36 |
chad fisher | South Hot-Cell | Repair | TM2 | | Conductor Block Insulator Replacement |
Ceramic conductor blocks ITD0053 and ITD0054 were replaced on TM2. Initially, only ITD0053 was to be replaced but after removing it it was noticed that ITD0054 (the larger conductor block behind it) was also broken, fractured through the helicoil that retained ITD0053 (see attached picture).
Both the old 53 and 54 fell into multiple pieces upon removal (see attached photo).
Fasteners holding 53 and 54 to the mounting plate and each other had loose washer on them. I have never seen this done before and, after checking drawing ITA3560 (extraction column Assembly) and confirming they have not been called out, I removed them before reinstalling.
|
Attachment 1: Image_(12).jpeg
|
|
Attachment 2: Image_(13).jpeg
|
|
Attachment 3: Image_(14).jpeg
|
|
|
2768
|
Friday, February 14, 2025, 10:43 |
David Wang | ITW/ITE | Standard Operation | | | target pit CAD filter replacement in TH. |
Plant Group Gabril.T organized a target pit CAD filter replacement and testing yesterday. My group helped on this job. small 3T hoist was used for the job.Still the filter needs to be pushed manually on crane to south into position because of crane access limit on south. The replacement job went well. Later, Gabril reported his test result is good as well.
|
|
2770
|
Friday, February 14, 2025, 11:35 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 TP1/TP2 and TCS TP1S have been started at TCS. |
TM2 TP1/TP2 and TCS:TP1S have been started at TCS. The starting time and operation of turbo pumps are ok. TM2 had been stored in silo since last Oct.
TP1/TP2 work fine over long weekend and TCS vacuum is good. I switched off TCS vacuum system. |