  2758   Wednesday, January 29, 2025, 11:39 chad fisherNorth Hot-CellRepair  Model N Remote Arm #9342 Tong Cable

Model N remote arm serial #9342 tong cable has been un-jammed from between pulley 3D (see picture) and casting (this is an ongoing issue with #9342 and 9352) and cable restrung and exercised to check motion. Tong system is now functional but exhibits excessive slack. Next step will be to check tension of the elevation/twist cables and adjust the pulley block if required (this pulley block houses both the elevation twist cable pulleys and the tong cable pulley 3D which is the site of the persistent cable hop)...I suspect adjusting the tension here will at least slightly improve the slack. In addition I will also investigate repositioning the tong drum screws (the procedure used to adjust the tong opening).

Attachment 1: Model_N_Pulley_3D.JPG
Model_N_Pulley_3D.JPG
  2759   Thursday, January 30, 2025, 07:07 David WangCraneStandard Operation  target hall crane annual inspection.

Tom Kauss finished TH crane annual inspection yesterday. The crane woks fine. Tom has this inspection record in his file. The crane inspection tag has been issued for 2025.

  2760   Thursday, January 30, 2025, 07:13 David WangCraneStandard Operation  inspection of target module lifting frames ITA0494-1997-01 and ITA1994-1997-02

Tom Gauss inspected  two target module lifting frames ITA0494-1997-01 and ITA0494-1997-02 yesterday. He certified the use of these two frames for 2025. Inspection tags have been issued and attached to frames. He has inspection record on them. 

 
  2761   Thursday, January 30, 2025, 07:17 David WangCraneStandard Operation  inspection of target hall crane below hook attachment pins and plates ITA6550-01.

Tom Kauss inspected target hall crane below hook attachment pins and plates ITA6550-01 yesterday. He certified the use of these pins and plates for year 2025. The inspection of these pins and plates was in Target hall crane annual check list. It was issued as a calibration index by Isaac Earle in 2022-Feb-08.  After inspection, The inspection tag  was issued. Tom has an inspection record on this job.

  2762   Monday, February 03, 2025, 13:04 David WangSafe Module ParkingMaintenance  ITW/ITW 24VDC electrical connectors for TP BVs MRO.

ITW/ITW 24VDC electrical connectors for TP BVs MRO has been done. 

  2763   Monday, February 03, 2025, 13:10 David WangCoolingStandard Operation  HALCW pump ITC:MP1 has been started.

HALCW pump ITC:MP1 has been started. water are supplied to both ITE and ITW system. all water signals for individual circuits work fine. no major leak on system. Some small water seeping from small ball valve stems are found in ITW. they will be fixed soon.

  2764   Tuesday, February 04, 2025, 11:50 Alexander ShkuratoffITWStandard Operation  ITW HV bias test without module (Work permit I2025-02-03-2)

Tuesday, February 04, 2025, 10:15

  • Started voltage ramp up. Using 250 V increments.

 Tuesday, February 04, 2025, 12:07

  • Current has got a bit noisy, starting at around 56.5 kV.
  • Currently at 57 kV. Voltage is stable though.
    • Current is about 151 uA on average, with spikes up to 164 uA.
  • Held at 57 kV for about 5 minutes, no drops in voltage, so continuing ramp.
  • 57.25 kV
    • There is noise in the current each time the voltage is increased. It seems to calm down slowly, with the later noise/spikes being less frequent and lower magnitude.
    • Average current is about 151 uA. Spikes at the start were as high as 169 uA, and after about 8 minutes they are about 160 uA.
    • Held here for about 10 minutes before continuing ramp.
  • I will try to get to 58 kV, and then back down to 57 kV to see if the current calms down and there is some sort of conditioning effect. If there is, I'm not sure of the mechanism since nothing is in vacuum.

Tuesday, February 04, 2025, 12:51

  • Dropping down to 57 kV, the current was about 150 uA and there were no more noise spikes. Seems like conditioning. Going back to 58 kV and continuing ramp.

Tuesday, February 04, 2025, 13:09

  • At 60 kV. Average current is about 187 uA initially, which could just be the average of the noise. It looks like it's dropping a few minutes later. About 10 minutes later, the current is 184 uA. 181 uA after 20 minutes.
  • It's been stable for about 30 minutes now. No voltage fluctuations, noise in the current has been the same or decreasing.
  • Current is about 177 uA after 80 minutes.

Tuesday, February 04, 2025, 14:36

  • It's been 1.5 hours and the voltage has been stable the whole time. All is good. Ramping down.

Tuesday, February 04, 2025, 14:50

  • Power supply off
  • Data dumped to http://isacwserv.triumf.ca/onlylocal/isacdata/ITW_HV_test_shutdown2025.txt

 

  2765   Wednesday, February 05, 2025, 13:46 Alexander ShkuratoffITEStandard Operation  ITE HV bias test without module (Work permit I2025-02-03-2)

Wednesday, February 05, 2025, 12:20

  • Ed has the voltage already up to 1000 V. Starting further ramp up in 250 V increments.

Wednesday, February 05, 2025, 12:45

  • Current was quite stable with basically no noise, and increasing with voltage until 57.5 kV, when the current spiked from 180 uA to a peak of 308 uA and the voltage dropped a little bit for a single data point. Kept it here for a few second and then dropped it back down a couple steps. Currently at 57 kV and the average current is about the same as before (181 uA), but the noise is significantly higher (+/- 10 uA).
  • Been at 57 kV for about 5 minutes and no change in the noise. Will try continuing ramp.
  • 57.25 kV: Current is ~193 uA with +/- 20 uA noise.
  • Gonna go with 250 V step every 5 minutes from here on until 60 kV.
Voltage (kV) Current (uA)
Noise (uA) V drops in 5 mins Current of spikes (uA)
57.00 181 10 0 -

57.25

193 20 0 -
57.50 206 25 1 294
57.75 216 15 0 -

58.00

225 10 4 876, 993, 873, 995

58.25

    30+ too many to count
58.50        

Wednesday, February 05, 2025, 13:17

  • Seemed like it was having some trouble at 58 kV, and then at 58.25 kV it was fine for about a minute and just starting sparking constantly, and would not calm down after a minute. Some sparks caused a positive voltage swing up to 65 kV, and with currents as high as ~4000 uA.
  • Ramped voltage down in steps back to 56.75 kV. It's still getting about 10-11 sparks per 5 minutes.
  • Trying 56.5 kV. 8 sparks in 5 minutes, one positive.
  • Trying 56.25 kV. 3 very small voltage drops in 5 minutes.
  • Trying 56 kV. No voltage drops in 5 minutes. Current is on average ~204 uA, with +/- 20 uA of noise.

Wednesday, February 05, 2025, 15:02

  • 1.5 hours at 56 kV. 2 small sparks over this time. Current was about 195 uA on average with about +/- 20 uA of noise. A spark will usually result in a change of the average current following the spark until the next.
  • Ramping down voltage now. The amount of noise decreases quickly with voltage and is basically gone at 53 kV.
  • Power supply off.
  • Dumped data to https://isacwserv.triumf.ca/onlylocal/isacdata/ITE_HV_test_shutdown2025.txt

Conclusion: ITE seems good up to 56 kV.

  2767   Tuesday, February 11, 2025, 10:36 chad fisherSouth Hot-CellRepairTM2 Conductor Block Insulator Replacement

Ceramic conductor blocks ITD0053 and ITD0054 were replaced on TM2. Initially, only ITD0053 was to be replaced but after removing it it was noticed that ITD0054 (the larger conductor block behind it) was also broken, fractured through the helicoil that retained ITD0053 (see attached picture).

Both the old 53 and 54 fell into multiple pieces upon removal (see attached photo).

Fasteners holding 53 and 54 to the mounting plate and each other had loose washer on them. I have never seen this done before and, after checking drawing ITA3560 (extraction column Assembly) and confirming they have not been called out, I removed them before reinstalling.

 

Attachment 1: Image_(12).jpeg
Image_(12).jpeg
Attachment 2: Image_(13).jpeg
Image_(13).jpeg
Attachment 3: Image_(14).jpeg
Image_(14).jpeg
  2768   Friday, February 14, 2025, 10:43 David WangITW/ITEStandard Operation  target pit CAD filter replacement in TH.

Plant Group Gabril.T organized a target pit CAD filter replacement and testing yesterday. My group helped on this job.  small 3T hoist was used for the job.Still the filter needs to be pushed manually on crane to south into position because of crane access limit on south.  The replacement job went well. Later, Gabril reported his test result is good as well.

 

  2770   Friday, February 14, 2025, 11:35 David WangConditioning StationStandard OperationTM2 TM2 TP1/TP2 and TCS TP1S have been started at TCS.

TM2 TP1/TP2 and TCS:TP1S have been started at TCS. The starting time and operation of turbo pumps are ok. TM2 had been stored in silo since last Oct.

TP1/TP2 work fine over long weekend and TCS vacuum is good. I switched off TCS vacuum system.

  2775   Thursday, February 20, 2025, 11:29 chad fisherSouth Hot-CellStandard Operation  Field Check

After removing the previously found extraction electrode and other suspect components the field at the manipulator tongs (in front of the window) in still 3mSv\h.

I have been through every bin etc in the hc and even emptied the dust seperator canister of the vacuum. I will use the camera to look under the table and inside the vacuum cleaner itself...these are really the only possibilities left.

  2776   Friday, February 21, 2025, 09:18 David WangCoolingStandard Operation  HALCW pump ITC:MP1 and MP2 phase current draw measurement.

HALCW pump ITC:MP1 and MP2 phase current draw measurement result: water supplied to both station. MP1: Black 17.0A, blue 16.9A, red 16.7A.   MP2: black 17.3A, blue17.8A, red 17.3A.    The results are good.  No concern on both motors.

  2777   Monday, February 24, 2025, 11:15 David WangCoolingMaintenance   ITW/ITE water system manual valves water small leak inspection and repairing.

 ITW/ITE water system manual valves water small leak inspection and repairing job is done. Small water drippings have been found on ITE: manual supply and return(valve stems).  ITW: 2A window supply(valve stem), collimator supply(valve stem),EE return(valve stem), HS supply and return(valve stems), tube heater supply and return(valve stems). all small leaks are repaired. 

  2779   Wednesday, February 26, 2025, 09:59 David WangSouth Hot-CellStandard Operation  SHC Field measurement from TH

After waste transfer, I did a SHC field measurement from TH through top flange opening. The general field around manipulator maintenance working area is 550 to 650 usv/hr(0.4 to 0.5 meters above table). some area on work table where target fragile material stayed before have 1.0 to 1.3 m/sv (closing to contact measurement). The spreading of target material dusts deposited on table, and affected the whole cell field in my view. 

  2780   Monday, March 03, 2025, 10:53 David WangITE/ITWMaintenance  ITH:MP1 has been replaced.
No issues seen on new pump; ITH:CG2 ~0.008T with ITH:CG1 ~0.001T.I am happy with performance. ITH:MP1 turned back off; ITH:PV1 closed and ITH:SV4 closed after the job.
- Chloe Beaumier-Martin

image

  2781   Monday, March 03, 2025, 15:33 David WangCoolingMaintenance  HALCW resin can loop two filters have been replaced.

HALCW resin can loop two filters have been replaced. no water leak on after job check.

  2782   Friday, March 07, 2025, 09:07 David WangITWStandard Operation  ITW water signals interlock annual check is done.

Chole and I finished ITW water signals interlock. No issue.

  2783   Friday, March 07, 2025, 09:16 David WangCoolingMaintenance  Service of 28 female Parker 1/4 quick connectors in ITW and ITE

Service of  Parker 1/4 quick connectors in ITW and ITE have been done.  all 28 female connectors were serviced. o- rings and valve stem in quick connectors were replaced. the serviced connectors have been installed back to ITW and ITE.  Visually inspected all connectors with flowing through them. No leak, and they function well. 

  2784   Tuesday, March 11, 2025, 08:44 David WangITWStandard Operation  ITW:TP3,TP4, TP1S TP4S have been started since March 06th.

To prevent TP bearings seize during shut down, ITW:TP3,TP4, TP1S TP4S have been started since March 06th. They work fine.  The plan is to switch them off this Thursday, and restart them in May before ITW in use.