Entry  Thursday, January 09, 2025, 11:08, David Wang, Facilities, Maintenance, , , ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings 
ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings and investigation in pit. A fault 17644 has been issued. this pump will be replaced
in March when general fielding in vacuum pit is reasonable for the job.
Entry  Monday, January 13, 2025, 10:02, Travis Cave, Spent Target Vault, Standard Operation, , UC#46, Spent Target Move Target_Index_2025-01-13.pdf
UC#46 was placed in pail# 301 in spot 1B and was 26.3mSv/hr when removed from the SHC. See attached PDF for vault 
details.
Entry  Thursday, January 16, 2025, 10:03, Travis Cave, Spent Target Vault, Standard Operation, , UC#47, Spent Target Move Target_Index_2025-01-16.pdf
 The spent UC#47 was moved from the south hot cell to the spent target vault placed in pail #302 in spot 1C of the vault, it was 24.5mSv/hr when
removed from the south hot cell. See attached for vault details.
Entry  Monday, January 20, 2025, 11:33, Adam Newsome, Waste Package/Ship, Standard Operation, , , F-308 flask loading - six flasks loaded  Target_Index_2025-01-20.xlsm
Today (2025-01-20), six flasks were loaded in preparation for   shipment with the following targets: C#4, TiC#5, Ta#64,Ta#62, Nb#10, SiC#44
Some of the pails (256, 273, 279, 277) required replacement of the wire rope cable with new style, 30 ft length, as requested by CNL. A lifting
label was also applied to these pails. Some of the pails (295, 298) already had the appropriate cable and lifter label.
Entry  Tuesday, January 21, 2025, 10:46, David Wang, ITE/ITW, Standard Operation, , , ITW/ITE pit general annual cleaning up. 
ITW/ITE pit general annual cleaning up were done. all concrete floor and TM equipment surface are vacuum  cleaned. HV cage inside and blue nylon
insulators were wiped by paper. 
Entry  Wednesday, January 22, 2025, 10:29, Frank Song, Faraday Cage, Maintenance, , , Annual clean up for ITE/ITW Faraday cages  
 David and I cleaned both cages in ISAC1 electric room, all done.
Entry  Monday, January 27, 2025, 08:27, om David Wang, South Hot-Cell, Maintenance, , parasite target, Transfer parasite target from SHC to NHC. 
A parasite target has been transferred from SHC to NHC. It is a job to reduce SHC field for coming SHC entry job. The transfer is successful.
Entry  Wednesday, January 29, 2025, 09:06, David Wang, ITE/ITW, Standard Operation, , , ITE and ITW water system paddle wheels and coils on flow sensors have been replaced 
ITE and ITW water system paddle wheels and coils on all flow sensors in pits have been replaced. It's a SAS job. 
Entry  Wednesday, January 29, 2025, 11:10, chad fisher, South Hot-Cell, Standard Operation, , , Pre-entry field Check Image_(1).jpg
Fields in the hot cell were checked using a pole monitor. Field approximately in the area someone would stand to repair manip. is 3.8 mSv/h
Hot item found! Bag with extraction electrode and high current fasteners from an online target.
Entry  Wednesday, January 29, 2025, 11:39, chad fisher, North Hot-Cell, Repair, , , Model N Remote Arm #9342 Tong Cable Model_N_Pulley_3D.JPG
Model N remote arm serial #9342 tong cable has been un-jammed from between pulley 3D (see picture) and casting (this is an ongoing issue with #9342 and
9352) and cable restrung and exercised to check motion. Tong system is now functional but exhibits excessive slack. Next step will be to check tension
of the elevation/twist cables and adjust the pulley block if required (this pulley block houses both the elevation twist cable pulleys and the tong cable
Entry  Thursday, January 30, 2025, 07:07, David Wang, Crane, Standard Operation, , , target hall crane annual inspection. 
Tom Kauss finished TH crane annual inspection yesterday. The crane woks  fine. Tom  has this inspection record in his file. The crane inspection  tag
has  been issued for 2025.
Entry  Thursday, January 30, 2025, 07:13, David Wang, Crane, Standard Operation, , , inspection of target module lifting frames ITA0494-1997-01 and ITA1994-1997-02 
Tom  Gauss inspected  two target module lifting frames ITA0494-1997-01   and  ITA0494-1997-02 yesterday. He certified the use of these two frames
  for 2025.  Inspection tags have been issued and attached to frames. He   has  inspection record on them. 
 
Entry  Thursday, January 30, 2025, 07:17, David Wang, Crane, Standard Operation, , , inspection of target hall crane below hook attachment pins and plates ITA6550-01. 
Tom Kauss inspected target hall crane below hook attachment pins and    plates ITA6550-01 yesterday. He certified the use of these pins and   plates
for year 2025. The  inspection of these pins and plates was in  Target hall  crane annual  check list. It was issued as a calibration  index by Isaac 
Earle in  2022-Feb-08.  After inspection, The inspection  tag  was issued. Tom has an inspection record on  this job.
Entry  Monday, February 03, 2025, 13:04, David Wang, Safe Module Parking, Maintenance, , , ITW/ITW 24VDC electrical connectors for TP BVs MRO. 
ITW/ITW 24VDC electrical connectors for TP BVs MRO has been done.  
Entry  Monday, February 03, 2025, 13:10, David Wang, Cooling, Standard Operation, , , HALCW pump ITC:MP1 has been started.  
HALCW pump ITC:MP1 has been started. water are supplied to both ITE and ITW system. all water signals for individual circuits work fine. no major leak
on system. Some small water seeping from small ball valve stems are found in ITW. they will be fixed soon.
Entry  Tuesday, February 04, 2025, 11:50, Alexander Shkuratoff, ITW, Standard Operation, , , ITW HV bias test without module (Work permit I2025-02-03-2) 
Tuesday, February 04, 2025, 10:15

    Started voltage ramp up. Using 250 V increments.

 Tuesday, February 04, 2025, 12:07

    Current has got a bit noisy, starting at around 56.5 kV.
    Currently at 57 kV. Voltage is stable though.
    
   
Entry  Wednesday, February 05, 2025, 13:46, Alexander Shkuratoff, ITE, Standard Operation, , , ITE HV bias test without module (Work permit I2025-02-03-2)  
Wednesday, February 05, 2025, 12:20

    Ed has the voltage already up to 1000 V. Starting further ramp up in 250 V increments.

Wednesday, February 05, 2025,
12:45
Entry  Friday, February 14, 2025, 10:43, David Wang, ITW/ITE, Standard Operation, , , target pit CAD filter replacement in TH.  
Plant Group Gabril.T organized a target pit CAD filter replacement and testing yesterday. My group helped on this job.  small 3T hoist was used
for the job.Still the filter needs to be pushed manually on crane to south into position because of crane access limit on south.  The replacement
job went well. Later, Gabril reported his test result is good as well. 
Entry  Wednesday, February 19, 2025, 10:07, Travis Cave, Spent Target Vault, Standard Operation, , SHC Active Trash, SHC Active Trash Target_Index_2025-02-19.pdf
 Active trash was placed into an unmarked pail and place in spot 7C of the vault the pail measured 321uSv/hr when removed from the SHC. See attached
PDF for details.
Entry  Thursday, February 20, 2025, 11:29, chad fisher, South Hot-Cell, Standard Operation, , , Field Check 
After removing the previously found extraction electrode and other suspect components the field at the manipulator tongs (in front of the window) in
still 3mSv\h.
I have been through every bin etc in the hc and even emptied the dust seperator canister of the vacuum. I will use the camera to look under the